Tavarakere
Namma Metro station
Under Construction of Tavarekere metro station
General information
Other namesSwagath Cross
Location47, Bannerghatta Rd, SR Krishnappa Garden, Hombegowda Nagar, Bengaluru, Karnataka 560041
Coordinates12°55′46″N 77°36′02″E / 12.92942°N 77.60049°E / 12.92942; 77.60049
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Pink Line
PlatformsSide platform (TBC)
Platform-1 → Kalena Agrahara
Platform-2 → Nagawara
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
Opening2025 (2025) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Jayadeva Hospital Pink Line
(Future Service)
Dairy Circle
towards Nagawara
Location

Tavarakere is an upcoming elevated metro station on the North-South corridor of the Pink Line[1] of Namma Metro in Bangalore, India. Around this metro station holds the main Tavarakere Park followed by some prime locations like Byransandra Lake Park, Sagar Hospitals (Jayanagar) and the famous Dairy Circle Flyover which leads towards Nexus Mall (Koramangala) in the east and towards Lal Bagh in the west. This metro station is stated to become operational around Q4 of 2024 / March 2025.[2][3][4][5]

Station layout

Station Layout - To Be Confirmed [6]

Tavarakere track layout (TBC)
P#
P#
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Kalena Agrahara next station is Jayadeva Hospital Change at the next station for Yellow Line
Platform #
Northbound
Towards ← Nagawara next station is Dairy Circle
Side platform | Doors will open on the left Disabled access
L2

Connections

Entry/Exit

See also

References

  1. "Bengaluru Metro Pink Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  3. "Namma Bengaluru's Pink Line likely to commence commercial operations by March 2025! Check routes, stoppages, and more". Financialexpress. 18 July 2023. Retrieved 15 December 2023.
  4. Staff Reporter (17 July 2023). "Bengaluru Metro: Pink Line likely to be Operationalised by March 2025". Metro Rail News. Retrieved 15 December 2023.
  5. Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
  6. "Bengaluru Metro: Track-Laying Work Is Expected To Complete By Second Half Of 2024". News18. 28 September 2023. Retrieved 15 December 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.