N1 shield}}
N1
Dhaka–Chattogram Highway,

Chattogram- Cox's Bazar Highway ,

Cox's Bazar - Teknaf Highway
Map of the National Highway 1 in red
Route information
Part of AH41
Length465 km[1] (289 mi)
Major junctions
Dhaka endSaidabad Connecting with Jatrabari Flyover
Major intersections
List
  • N8 in Jatrabari
    R111 in Signboard
    R110 in Shimrail
    N2 in Kanchpur
    N105 in Madanpur
    Z1066 in Mograpara near Sonargaon
    Z1402 in Gouripur
    Z1053 in Gouripur
    Z1044 in Amirabad
    Z1042 in Eliotganj
    Z1008 in Chandina
    N102 in Comilla Cantonment
    R141 in Alekharchar
    R140 & R141 in Paduar Bazar
    Z1034 in Feni
    N104 in Mahipal
    Z1032 in Muhuriganj
    R151 in Baroiar Hat
    N106 in Muradpur in Chittagong
    N107 in Bahaddarhat in Chittagong
    N108 in Keranihat in Satkania
    R172 in Chakaria
    N110 in Cox's Bazar
    Z1099 in Teknaf
    Z1098 in Teknaf
ToTeknaf , Cox's Bazar
Location
CountryBangladesh
Highway system
N8 N2

The N1 or Dhaka–Chittagong Highway is a main transportation artery in Bangladesh, between Dhaka, Comilla and Chittagong. Approximately 465 kilometres (289 miles) in length, the road links the country's two largest cities, Dhaka and Chittagong.[2][3] The highway is known along various stretches as the Chittagong–Cox's Bazar Highway and the Cox's Bazar–Teknaf Highway. Currently four lanes with an eight-lane expansion underway, the N1 is the busiest road in the country and a top development priority.[2][4] Construction of a larger Dhaka-Chittagong expressway has been proposed to decrease traffic on the highway.[2]

Background

When constructed, the highway was limited to two lanes of traffic for most of its length. Traffic jams or tailbacks of 25 kilometres (16 miles) have been reported.[5] In 2009, it was estimated that daily usage of the highway was 20,000–25,000 motorised vehicles, up 40% of which were trucks.[2]

The Roads and Highways Department (RHD) of the Ministry of Communication is expanding the Dhaka–Chittagong stretch to four lanes. The target to finish the project by December 2013, however implementation remains slow.[4] The highway forms a critical component of the proposed Asian Highway Network route AH41 and the Central-South-East Asian economic corridor, including initiatives such as BCIM.

Expansion

Dhaka-Chittagong Highway after expansion

In January 2010, expansion of the highway from two lanes to four lanes started.[4] The project will decrease the travel time from Dhaka to Chittagong to 4.5 or 5 hours.[3]

As of March 2013, only 23.5 per cent of work has been completed, and it was unlikely to meet its December 2013 deadline. Construction included 221 culverts, 22 bridges and three flyovers.[6] Reza Construction Ltd. and Sino Hydro have set temporary camps for this purpose respectively near Daudkandi and Chandina.[1]

As of February 2015, the expected completion of the project was postponed until June 2015.[3] And the project completed and opened on July 2, 2016. [7]

Route description

In Dhaka District

From Jatrabari to Signboard 6 km in Dhaka District.

In Narayanganj District

This highway runs on three Upazilas of Narayangaj district. Upazilas are Narayanganj Sadar Upazila, Bandar Upazila and Sonargaon Upazila. From Signboard to Meghna Bridge, total length of N1 highway runs on this district is 19 km.

In Munshiganj District

The highway exceeded only one Upazila of Munshiganj district and that is Gazaria Upazila. From Meghna Bridge to Meghna-Gomti bridge, total length of highway runs on this district is 11 km.

In Comilla District

N1 exceeds five Upazilas of Comilla district, Daudkandi Upazila, Chandina Upazila, Burichang Upazila, Comilla Sadar Upazila and Chauddagram Upazila. Length of N1 in Comilla district is 97 km.

In Feni District

N1 exceeded two Upazila of Feni district, Feni Sadar Upazila and Chhagalnaiya Upazila. Length of N1 in Feni district is 31 km.

In Chittagong District

N1 exceeds seven upazilas on Chittagong district including Chittagong city. Upazilas are Mirsharai Upazila, Sitakunda Upazila, Boalkhali Upazila, Patiya Upazila, Chandanaish Upazila, Satkania Upazila and Lohagara Upazila. Length of N1 in Chittagong District is 148.06 km.

In Cox's Bazar District

N1 exceeds four upazilas of Cox's bazar district. Upazilas are Chakaria Upazila, Ramu Upazila, Ukhia Upazila and Teknaf Upazila. Length of N1 in Cox's Bazar District is 148.87 km. [8]

See also

References

  1. 1 2 "Road Master Plan" (PDF). Bangladesh Roads and Highways Department. Retrieved 12 December 2012.
  2. 1 2 3 4 "Proposed Technical Assistance Loan People's Republic of Bangladesh:Dhaka–Chittagong Expressway Public–Private Partnership Design Project" (PDF). 2011. Retrieved 12 April 2015.
  3. 1 2 3 Daily Industry (16 February 2015). "Dhaka-Ctg 4-lane to be completed by June". Daily Industry. Retrieved 16 October 2015.
  4. 1 2 3 "RHD misses target of bitumen work". The Financial Express. 11 February 2013. Retrieved 8 March 2013.
  5. Daily Star (15 July 2015). "Long tailback on Dhaka-Ctg highway". Daily Star Online. Retrieved 16 October 2015.
  6. "4-lane Dhaka-Chittagong Highway to miss deadline". New Age. 13 January 2013. Retrieved 8 March 2013.
  7. "The Dhaka-Chittagong extra two lain opened".
  8. Roads and Highway Dept. Bangladesh
KML is from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.