Thune Dam
Thune Dam is located in Botswana
Thune Dam
Location of Thune Dam in Botswana
CountryBotswana
LocationCentral District
Coordinates22°16′16″S 28°48′02″E / 22.271098°S 28.800686°E / -22.271098; 28.800686
Dam and spillways
Height33.6 metres (110 ft)
Length1.7 kilometres (1.1 mi)
Reservoir
Total capacity90,000,000 cubic metres (3.2×109 cu ft)

The Thune Dam is a dam on the Thune River in Botswana that was under construction in 2012. It has a planned capacity of 90,000,000 cubic metres (3.2×109 cu ft).[1]

Description

The dam is located on the Thune river upstream from its confluence with the Motloutse. The dam is situated in relatively flat country, and will have an average depth of about 15 metres (49 ft). Given the hot, dry climate, evaporation loss is a serious concern. Various ways to reduce such loss have been considered but rejected. The dam will be an earthfill clay-core structure.[2] It will be 33.6 metres (110 ft) high, with a 1.7 kilometres (1.1 mi) long wall and a 90,000,000 cubic metres (3.2×109 cu ft) capacity.[3]

Purpose

The dam will supply drinking water to several villages in the Bobirwa area, and irrigation water to an agricultural project near Mathathane.[4] Once complete, water will be delivered to the villages of Bobonong, Motlhabaneng, Mathathane, Tsetsebjwe, Mabolwe, Semolale, Gobojango, Lepokole and Molalatau.[3]

Construction

A stakeholders workshop was held in September 2009 at Molalatau Secondary School Hall, where the Minister provided information and answered questions. He warned that, although the dam would bring large benefits, there would also be problems during the construction process such as an influx of illegal immigrants, crime and sexual problems such as HIV/AIDS and teen pregnancies.[3]

The dam site was handed over to the contractor, Zhon Gan Engineering and Construction, on 30 April 2010.[5] The project was due to be completed in April 2013. The water treatment plant and pipelines could be delayed until 2014 due to funding problems. In July 2010 it was reported that work on the dam site had halted since an incident in which a worker was killed a month earlier. Bush clearing had started in the site so surveying could be undertaken, but the project was behind schedule.[4] A ground-breaking ceremony was held in September 2010, attended by Ponatshego Kedikilwe, Minister of Minerals, Energy and Water Resources.[6]

As of March 2011, Thune Dam was just 38% complete. Delays had been caused by floods, and there were problems with construction of accommodations and with licenses.[7]

References

Citations

Sources

  • "First Stakeholders Workshop of the Thune Dam Construction Project Held". Ministry of Minerals, Energy and Water Resources (MMEWR). 17 October 2009. Retrieved 20 September 2012.
  • Kolantsho, Calistus (22 September 2010). "PHK warns Thune Dam contractors". Mmegi Online. Retrieved 20 September 2012.
  • "Media tours MMEWR Project Sites". Ministry of Minerals, Energy & Water Resources. 12 April 2011. Retrieved 20 September 2012.
  • Modikwa, Onalenna (2 July 2010). "Thune Dam construction suspended". Mmegi Online. Retrieved 20 September 2012.
  • Pheage, Tefo (9 March 2011). "Floods delayed dam construction". The Botswana Gazette. Retrieved 20 September 2012.
  • Tshukudu, Innocent (24 September 2010). "GIVING A DAM". The Voice. Retrieved 20 September 2012.
  • Uys, Dominic (January 2011). "Three Dams and a Pipeline : Water Sewage & Effluent". Jeffares & Green. Retrieved 20 September 2012.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.