Uttara Center উত্তরা সেন্টার | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Dhaka Metro Rail station | |||||||||||
![]() Interior of the station | |||||||||||
| General information | |||||||||||
| Other names | Station 2 | ||||||||||
| Location | Avenue 1, Sector 15, Uttara, Dhaka Bangladesh | ||||||||||
| Coordinates | 23°51′35″N 90°21′54″E / 23.8598°N 90.3651°E | ||||||||||
| Owned by | Dhaka Mass Transit Company Limited | ||||||||||
| Line(s) | MRT Line 6 | ||||||||||
| Platforms | Side platform | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Structure type | Elevated | ||||||||||
| Platform levels | 3 | ||||||||||
| Parking | No | ||||||||||
| Bicycle facilities | No | ||||||||||
| Accessible | Yes | ||||||||||
| History | |||||||||||
| Opened | 18 February 2023 | ||||||||||
| Electrified | 1,500 V DC overhead catenary | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
| Location | |||||||||||
Uttara Center (Bengali: উত্তরা সেন্টার romanised: Uttora sentar) is an elevated metro station of the Dhaka Metro's MRT Line 6, located in Uttara, a suburb of Dhaka. The station commenced operation from 18 February 2023.[2][3][4]
History
The Uttara Centre metro station was constructed under "Package CP-03". The notification of application for construction of raised bridges for stations and railways was published on 30 June 2015 and the last date for submission of applications was 9 September 2015. Italian-Thai Development Public Company Limited gets work contract for "Package CP-03". The agreement document was sent to the ministry on 29 March 2016 for NBR investigation and law and parliamentary investigation. The signing ceremony for the agreement package was held on 3 May 2017 at the Pan Pacific Sonargaon Hotel in Dhaka. Construction work started on 2 August 2017.[5][6]
Transit Oriented Development Hub
There will be a TOD hub in all stations of Metro Rail Line-6. This TOD (Transit Oriented Development) hub houses shops, commercial office etc. According to authority the first TOD hub will be constructed in this station.[7]
Station
Station layout
| G | Path level | Exit / Entry |
| L1 | Between | Rent control, station agent, metro card vending machine, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform 1 Southbound |
Towards → Agargaon next station is Uttara South | |
| Platform 2 Northbound |
Towards ← Uttara North | |
| Side platform | Doors will open on the left | ||
| L2 | ||
References
- ↑ "Line 6 route map" (PDF). Dhaka Mass Transit Company Limited. Retrieved 23 December 2022.
- ↑ "প্রধানমন্ত্রীকে নিয়ে মাত্র ১০ মিনিটে দিয়াবাড়ি থেকে আগারগাঁওয়ে মেট্রোরেল". Prothom Alo (in Bengali). 28 December 2022. Retrieved 28 December 2022.
- ↑ Tuhin Shubhra Adhikary (6 June 2021). "Uttara-Agargaon Metro Rail: Launch now aimed at Dec 2022". The Daily Star.
- ↑ "মেট্রোরেলের 'উত্তরা সেন্টার' স্টেশন খুললো". Bdnews24.com (in Bengali). 18 February 2023. Retrieved 18 February 2023.
- ↑ "CP-03, CP-04 (Viaduct & Stations, Uttara-Agargaon)". 17 March 2020. Archived from the original on 15 January 2022. Retrieved 22 January 2022.
- ↑ "Construction of Metro rail and station starts today". The Asian Age. 2 August 2017.
- ↑ Hossain, Anwar (9 March 2021). "বাড়তি আয়ের জন্য খোলা হবে বিপণিবিতান". Prothom Alo (in Bengali).