Vande Bharat Express
Vande Bharat Express trains running in Blue-White and Saffron-Grey Liveries
Overview
Service typeInter-city semi-high-speed rail
StatusActive
PredecessorShatabdi Express for all and MEMU for technical
First service15 February 2019 (2019-02-15)
Websiteindianrail.gov.in
Route
Line(s) used41 (Operational)
On-board services
Class(es)CC Chair (Economy Class)
Executive Chair (Premium Class)
Seating arrangements
  • Airline style
  • Rotatable seats
Catering facilitiesOn-board catering
Observation facilitiesLarge windows in all carriages
Entertainment facilities
Baggage facilitiesOverhead racks
Other facilities
Technical
Rolling stockVande Bharat (trainset)[1]
Track gaugeIndian gauge
1,676 mm (5 ft 6 in) broad gauge
Electrification25 kV 50 Hz AC Overhead line
Operating speed160 km/h (99 mph) in a part of Rani Kamalapati (in Bhopal) - Hazrat Nizamuddin (in Delhi) Route,
110–130 km/h (68–81 mph) in other routes.
Average length384 m (1,260 ft) (16 coaches)
192 m (630 ft) (8 coaches)

Vande Bharat Express[2] (lit.'Praise India Express') is a medium-distance train service operated by Indian Railways. Similar to Shatabdi Express, these are day train services that connect Indian cities which are less than 10 hours apart. Vande Bharat trainsets can achieve semi-high speeds, but due to speed restrictions, multiple stoppages and traffic congestion, the maximum permissible speed of the services are limited to 160 km/h (99 mph) on a section of the Delhi-Bhopal service, and 110–130 km/h (68–81 mph) on other services.[3][4][5]

The trains have achieved 183 km/h during trials which is higher than the certified speed of 160 km/h.[6] A notable feature of the train is its faster acceleration and deceleration, because of which it can go from 0 to 100 km/h in just 52 seconds during trial.[7][8][9]

The trainset, then known as Train 18, was designed by the RDSO and manufactured by the Integral Coach Factory (ICF).[10] The specifications were also standardised by the RDSO.[11] It was made for low-cost maintenance and operational optimisation. The cost of a 16-coach Vande Bharat train is about 115 crore (US$14 million).[12]

On 27 January 2019, the services using Train 18 sets were named Vande Bharat Express with the first service commencing on 15 February 2019.[13]

It is currently the 2nd fastest type of train in the country after Namo Bharat (RapidX) train running on Delhi Meerut RRTS system.

Background

Efforts to increase speeds

For most of Indian Railways' history, speed and comfort were not of primary concern as safety was of utmost importance. The replacement of old ICF coaches by the modern and safer LHB coaches helped in reducing rail accidents significantly.[14] After tackling the safety concerns to an extent, speed and comfort were finally on the Indian Railways agenda. Proposals were made to introduce semi-high-speed (160–200 km/h) services between major cities.[15] In 2016, Gatimaan Express was inaugurated as the country's first semi-high-speed service. The train ran on the newly upgraded Grade A line between Tughlakabad and Agra Cantonment that supported speeds up to 160 km/h.[16]

Talgo train at New Delhi railway station for its 3rd leg of the trial.

In June 2016, Indian Railways sought Requests For Qualification (RFQ) to jointly manufacture 5000 modern EMU sets and was met with a good response from countries like Canada, China, France, Germany, and Switzerland. Native companies like Medha and BHEL also made the cut.[17] Spanish Talgo trains went as far as conducting a trial run on the Mumbai - Delhi route. The train completed the journey in ten hours (almost six hours quicker than Rajdhani Express) with an average speed of 117.5 km/h but there were many problems related to rakes such as height, coupling, maintenance, problems related to cost-effectiveness and robustness related to harsh environment.[18] However, the ministry said that Indian Railways could not come with a direct agreement and wanted them to go through a tendering process. Since there was no other bidder, the procurement of these trains was deemed impossible. The Make in India campaign also fuelled the cause for developing the next generation EMU semi-high-speed trainsets indigenously.[19]

Making an indigenous trainset

After foreign proposals for introducing semi-high-speed capable EMUs were unsuccessful, Indian Railways at ICF headed by general manager Sudhanshu Mani, started developing a new EMU trainset at half the imported cost. Since these trains were planned to be ready by 2018, they were named 'Train-2018' and later 'Train 18'. They were designed to be fully air-conditioned and equipped with automatic plug doors, onboard Wi-Fi, and infotainment out of many other modern facilities. With these modern facilities along with modern technical features, the train was one of its kind in the country and marked a leap into the future.[20] With sixteen chair cars and a 160 km/h speed, the technology was set to replace Shatabdi services.[21][22]

During its trial runs, Train 18 became the fastest EMU train in India after attaining a speed of 183 km/h.[23][24]

Inaugural run

Train 18 was renamed as 'Vande Bharat' as an acknowledgement of the fact that it was completely built in India by Indian engineers and the services were thus named 'Vande Bharat Express'.[25]

Inauguration of the first Vande Bharat Express between Delhi and Varanasi at the New Delhi railway station

On 15 February 2019, the first Vande Bharat Express between New Delhi and Varanasi was flagged off at the New Delhi railway station by Prime Minister Narendra Modi.[26][27] The train ran from New Delhi to Varanasi via Kanpur and Prayagraj, connecting Uttar Pradesh's Varanasi to the capital city and reduced the existing travel time along the route by 15%.[28] The 8-hour journey from New Delhi to Varanasi station covered a total distance of 762 km (473 mi) between the two cities. However, while returning from Varanasi, the train broke down due to a cattle runover. According to reports, four cars of the train experienced an electrical outage and the brakes were reported to be jammed as the train was halted for over an hour at Tundla Junction railway station before resumption.[29] Later in the year, the second Vande Bharat service was launched between New Delhi and Katra, it is one of the only two first version trainsets of Vande Bharat Express.[30]

Replacement of Shatabdis

Since the Vande Bharat Express was built to provide a short-distance, fast and modern service between major cities, similar to the Shatabdi Express which was introduced back in 1988 for similar purposes, several train sets were supposed to be built to replace the existing Shatabdis on all routes. But after the inauguration of first two services, the Indian Railways had stopped the production of new sets owing to internal issues.[31] After the intervention of the Railway Minister, they decided to resume tenders for the production of new sets. However, they wished to provide more time for the manufacturers to come up with the cheapest bid and the fact that the train would require a major upgrade from scratch, as per one of the officials.[32] These second generation trainsets were developed in 2022 and they entered service on 30 September 2022. It is planned that all Shatabdi Express trains will be phased out and replaced with Vande Bharat trains.[33]

Facilities

Vande Bharat's Chair Car (CC) seating
Vande Bharat's Executive Chair Car (EC) seating
Food catering service on Howrah-Jalpaiguri route

The train has two seating options, Chair Car and Executive Chair Car. The coaches are air-conditioned and feature airline-style seats in a 2-3 configuration in Chair Cars and 2-2 Configuration in Executive Chair Cars. The service offers onboard catering with both vegetarian and non-vegetarian meal options included in the fare as standard. The biggest improvement of Vande Bharat services is the fully sealed gangway (locally called Vestibules or inter-coach pathways) that will keep of dust and noise outside and the semi-permanent couplers that will ensure smooth bang-less travel experience to passengers.

The service also offers onboard Wi-Fi and an infotainment system, along with electric outlets and reading lights. The train has features such as automatic doors, smoke alarms, CCTV cameras, an odour control system, bio-vacuum toilets, and sensor-based water taps. Roller blinds are featured on all windows, and overhead racks provide storage for luggage.[34]

Ridership

Northern Railway stated that the New Delhi-Varanasi Vande Bharat Express, which was launched in 2019, had a cumulative earning of 92 crore (US$12 million) with 100% occupancy after one year of service.[35] According to Southern Railway authorities, more than 200% booking rate on the Thiruvananthapuram - Kasaragod Vande Bharat Express points to the wide acceptance of the train in Kerala. The trip from Kasaragod to Thiruvananthapuram earned ₹ 1.17 crore.[36]

According to data shared by the Indian Railways, between 1 April 2022 and 8 February 2023, the Vande Bharat Express had an average occupancy of 99%. The Vande Bharat Express from Nagpur to Bilaspur had the lowest occupancy rate of 52.86%.[37] In comparison, from 2019 to 2020, Rajdhani, Shatabdi and Duronto express trains had occupancy of 97.01% with Flexi Fare schemes.[38] CAG found faults in Railway's Flexi-fare scheme, hence it was scrapped in many premium trains.[39]

Central Railways has earned 10.72 crore (US$1.3 million) from Vande Bharat trains operating from Mumbai to Solapur, Shirdi, Goa and one from Nagpur to Bilaspur in just 25 days from 15 August 2023 till 9 September 2023. CSMT-Solapur Vande Bharat with an occupancy of 93.71% made 1.71 crore (US$210,000) and Solapur-CSMT with occupancy of 105.09% made 1.97 crore (US$250,000).[40]

In May 2023, the 16-coach rake of Bilaspur–Nagpur Vande Bharat Express was swapped with the 8-coach rake of Secunderabad–Tirupati Vande Bharat Express because of low occupancy on the former route. Tejas Express rake was temporarily used on the former route.[41][42][43]

Speed restrictions

Vande Bharat Express with Cheetah logo used to signify the semi-high-speed capability of reaching up to 160 km/h (99 mph)

During its trial runs, the train had clocked a speed of 183 km/h (114 mph) and the maximum permissible speed of the train was set at 160 km/h (99 mph). But since Indian railway tracks do not support such speeds, most of the services have a lower maximum permissible speed of 130 km/h (81 mph), excluding Rani Kamalapati–Hazrat Nizamuddin service operating at 160 km/h (99 mph) on Tughlakabad–Agra section.

Services

S.No. Train name Train number Origin station Terminal station Zone Halts Cars Freq. Distance Travel time Speed Inaugural run Ref
Maximum [lower-alpha 1] Average
1 New Delhi – Varanasi Vande Bharat Express 22436/ 22435 New Delhi Varanasi Junction NR 2 16 Except Thu 759 km (472 mi) 08h 00m 130 km/h (81 mph) 95 km/h (59 mph) 15 February 2019 [44]
2 New Delhi – Shri Mata Vaishno Devi Katra Vande Bharat Express 22439/ 22440 New Delhi Shri Mata Vaishno Devi Katra NR 3 16 Except Tue 655 km (407 mi) 08h 00m 130 km/h (81 mph) 82 km/h (51 mph) 3 October 2019 [45]
3 Mumbai Central – Gandhinagar Capital Vande Bharat Express 20901/ 20902 Mumbai Central Gandhinagar Capital WR 5 16 Except Wed 522 km (324 mi) 06h 25m 130 km/h (81 mph) 81 km/h (50 mph) 30 September 2022 [46][47]
4 New Delhi – Amb Andaura Vande Bharat Express 22447/ 22448 New Delhi Amb Andaura NR 4 16 Except Fri 412 km (256 mi) 05h 15m 130 km/h (81 mph) 79 km/h (49 mph) 13 October 2022 [48]
5 MGR Chennai Central – Mysuru Vande Bharat Express 20607/ 20608 MGR Chennai Central Mysore Junction SR 2 16 Except Wed 497 km (309 mi) 06h 30m 130 km/h (81 mph) 76 km/h (47 mph) 11 November 2022 [49]
6 Bilaspur – Nagpur Vande Bharat Express 20825/ 20826 Bilaspur Junction Nagpur Junction SECR 4 8 Except Sat 412 km (256 mi) 05h 30m 130 km/h (81 mph) 77 km/h (48 mph) 11 December 2022 [50][51]
7 Howrah - New Jalpaiguri Vande Bharat Express 22301/ 22302 Howrah Junction New Jalpaiguri Junction ER 3 16 Except Wed 566 km (352 mi) 07h 30m 130 km/h (81 mph) 75 km/h (47 mph) 30 December 2022 [52]
8 Visakhapatnam – Secunderabad Vande Bharat Express 20833/ 20834 Visakhapatnam Junction Secunderabad Junction ECoR 5 16 Except Sun 698 km (434 mi) 08h 30m 130 km/h (81 mph) 82 km/h (51 mph) 15 January 2023 [53]
9 Mumbai CSMT – Solapur Vande Bharat Express 22225/ 22226 Mumbai CSMT Solapur CR 5 16 Except Wed (22225)

Except Thu (22226)

454 km (282 mi) 06h 35m 130 km/h (81 mph) 69 km/h (43 mph) 10 February 2023 [54][55]
10 Mumbai CSMT – Sainagar Shirdi Vande Bharat Express 22223/ 22224 Mumbai CSMT Sainagar Shirdi CR 4 16 Except Tue 341 km (212 mi) 05h 5m 130 km/h (81 mph) 67 km/h (42 mph) [56][57]
11 Rani Kamalapati (Habibganj) – Hazrat Nizamuddin Vande Bharat Express 20171/ 20172 Habibganj (Rani Kamalapati) Hazrat Nizamuddin WCR 3 16 Except Sat 702 km (436 mi) 07h 30m 160 km/h (99 mph) 92 km/h (57 mph) 1 April 2023 [58][59]
12 Secunderabad – Tirupati Vande Bharat Express 20701/ 20702 Secunderabad Junction Tirupati SCR 4 16 Except Tue 662 km (411 mi) 08h 15m 130 km/h (81 mph) 80 km/h (50 mph) 8 April 2023 [60][61]
13 MGR Chennai Central – Coimbatore Vande Bharat Express 20643/ 20644 MGR Chennai Central Coimbatore Junction SR 3 8 Except Wed 495 km (308 mi) 06h 00m 130 km/h (81 mph) 82 km/h (51 mph) [62]
14 Ajmer – Delhi Cantonment Vande Bharat Express 20977/ 20978 Ajmer Junction Delhi Cantonment NWR 4 16 Except Wed 429 km (267 mi) 05h 15m 130 km/h (81 mph) 82 km/h (51 mph) 12 April 2023 [63][64]
15 Kasaragod – Thiruvananthapuram Vande Bharat Express (via Kottayam) 20633/ 20634 Kasaragod Thiruvananthapuram Central SR 8 16 Except Thu 586 km (364 mi) 08h 10m 110 km/h (68 mph) 72 km/h (45 mph) 25 April 2023 [65][66]
16 Howrah – Puri Vande Bharat Express 22895/ 22896 Howrah Junction Puri SER 7 16 Except Thu 500 km (310 mi) 06h 25m 130 km/h (81 mph) 78 km/h (48 mph) 18 May 2023 [67][68]
17 Dehradun – Anand Vihar Terminal Vande Bharat Express 22458/ 22457 Dehradun Terminal Delhi Anand Vihar NR 6 8 Except Wed 302 km (188 mi) 04h 45m 110 km/h (68 mph) 64 km/h (40 mph) 25 May 2023 [69][70]
18 New Jalpaiguri – Guwahati Vande Bharat Express 22227/ 22228 New Jalpaiguri Junction Guwahati NFR 5 8 Except Tue 407 km (253 mi) 05h 30m 110 km/h (68 mph) 74 km/h (46 mph) 29 May 2023 [71][72]
19 Mumbai CSMT – Madgaon Vande Bharat Express 22229/ 22230 Mumbai CSMT Madgaon Junction CR 7 8 Except Fri 581 km (361 mi) 07h 45m 120 km/h (75 mph) 75 km/h (47 mph) 27 June 2023 [73][74]
20 Patna – Ranchi Vande Bharat Express 22349/ 22350 Patna Junction Ranchi Junction ECR 5 8 Except Tue 379 km (235 mi) 06h 00m 130 km/h (81 mph) 63 km/h (39 mph) [75]
21 KSR Bengaluru – Dharwad Vande Bharat Express 20661/ 20662 KSR Bengaluru City Jn Dharwad SWR 3 8 Except Tue 495 km (308 mi) 06h 25m 110 km/h (68 mph) 76 km/h (47 mph) [76][77]
22 Rani Kamalapati (Habibganj) – Rewa Vande Bharat Express 20173/ 20174 Habibganj (Rani Kamalapati) Rewa Terminal WCR 8 8 Except Tue 568 km (353 mi) 08h 00m 110 km/h (68 mph) 71 km/h (44 mph) [78]
23 Indore – Nagpur Vande Bharat Express 20911/ 20912 Indore Junction Nagpur Junction WR 4 8 Except Sun 636 km (395 mi) 08h 20m 110 km/h (68 mph) 76 km/h (47 mph) [79]
24 Jodhpur – Sabarmati (Ahmedabad) Vande Bharat Express 12461/ 12462 Jodhpur Junction Sabarmati Junction NWR 5 8 Except Tue 449 km (279 mi) 06h 00m 130 km/h (81 mph) 75 km/h (47 mph) 7 July 2023 [80][81]
25 Gorakhpur – Lucknow Charbagh Vande Bharat Express 22549/ 22550 Gorakhpur Junction Lucknow Charbagh NER 2 8 Except Sat 296 km (184 mi) 04h 10m 110 km/h (68 mph) 71 km/h (44 mph) [82][83]
26 Udaipur city – Jaipur Vande Bharat Express 20979/ 20980 Udaipur City Jaipur Junction NWR 7 8 Except Tue 425 km (264 mi) 06h 20m 130 km/h (81 mph) 69 km/h (43 mph) 24 September 2023 [84][85]
27 MGR Chennai Central – Vijayawada Vande Bharat Express 20677/ 20678 MGR Chennai Central Vijayawada Junction SR 4 8 Except Tue 514 km (319 mi) 06h 40m 130 km/h (81 mph) 77 km/h (48 mph) [86]
28 Chennai Egmore – Tirunelveli Vande Bharat Express 20665/ 20666 Chennai Egmore Tirunelveli Junction SR 6 8 Except Tue 650 km (400 mi) 07h 50m 110 km/h (68 mph) 83 km/h (52 mph) [87][88]
29 Kacheguda – Yesvantpur Vande Bharat Express 20703/ 20704 Kacheguda Yesvantpur Junction SCR 4 8 Except Wed 612 km (380 mi) 08h 15m 110 km/h (68 mph) 74 km/h (46 mph) [89]
30 Patna – Howrah Vande Bharat Express 22348/ 22347 Patna Junction Howrah Junction ECR 7 8 Except Wed 532 km (331 mi) 06h 35m 130 km/h (81 mph) 81 km/h (50 mph) [90]
31 Ranchi – Howrah Vande Bharat Express 20898/ 20897 Ranchi Junction Howrah Junction SER 6 8 Except Tue 458 km (285 mi) 07h 05m 130 km/h (81 mph) 65 km/h (40 mph) [91][92]
32 Puri – Rourkela Vande Bharat Express 20836/ 20835 Puri Rourkela Junction ECoR 5 8 Except Sat 506 km (314 mi) 07h 45m 130 km/h (81 mph) 65 km/h (40 mph) [93]
33 Kasaragod – Thiruvananthapuram Vande Bharat Express (via Alappuzha) 20631/ 20632 Kasaragod Thiruvananthapuram Central SR 8 8 Except Mon (20632)

Except Tue (20631)

574 km (357 mi) 08h 05m 110 km/h (68 mph) 71 km/h (44 mph) [94]
34 Ahmedabad – Jamnagar Vande Bharat Express 22925/ 22926 Ahmedabad Junction Jamnagar WR 6 8 Except Wed (22926)

Except Tue (22925)

331 km (206 mi) 04h 25m 110 km/h (68 mph) 75 km/h (47 mph) [95]
35 Varanasi – New Delhi Vande Bharat Express 22415/ 22416 Varanasi Junction New Delhi NR 2 16 Except Tue 759 km (472 mi) 08h 05m 130 km/h (81 mph) 94 km/h (58 mph) 18 December 2023 [96][97]
36 Anand Vihar – Ayodhya Dham Vande Bharat Express 22426/ 22425 Delhi Anand Vihar Ayodhya Dham NR 2 8 Except Wed 628 km (390 mi) 08h 20m 130 km/h (81 mph) 75 km/h (47 mph) 30 December 2023 [98][99]
37 SMVD Katra – New Delhi Vande Bharat Express 22478/ 22477 Shri Mata Vaishno Devi Katra New Delhi NR 3 16 Except Wed 655 km (407 mi) 08h 00m 130 km/h (81 mph) 82 km/h (51 mph) [100]
38 Amritsar – Delhi Junction Vande Bharat Express 22488/ 22487 Amritsar Junction Delhi Junction NR 5 8 Except Fri 447 km (278 mi) 05h 30m 130 km/h (81 mph) 81 km/h (50 mph) [101]
39 Coimbatore – Bengaluru Cantonment Vande Bharat Express 20642/ 20641 Coimbatore Junction Bangalore Cantonment SR 5 8 Except Thu 374 km (232 mi) 06h 30m 110 km/h (68 mph) 58 km/h (36 mph) [102]
40 Mangaluru Central – Madgaon Vande Bharat Express 20646/ 20645 Mangaluru Central Madgaon Junction SR 2 8 Except Thu 319 km (198 mi) 04h 35m 120 km/h (75 mph) 70 km/h (43 mph) [103]
41 Jalna – Mumbai CSMT Vande Bharat Express 20705/ 20706 Jalna Mumbai CSMT SCR 6 8 Except Wed 435 km (270 mi) 07h 20m 110 km/h (68 mph) 59 km/h (37 mph) [104]

Vande Metro services

"Vande Metro" is a proposed service that will operate on a short-distance, intercity rail network to connect major cities within a distance of around 100 km (62 mi). The design speed of Vande Metro will be 130 km/h (81 mph) and the train is likely to run at a very high frequency (4-5 times a day). Vande Metro will become a replacement for the existing MEMU services for regional rail connectivity between any two big cities, which are at a distance of 100–120 km (62–75 mi). Vande Metro Services will have a carrying capacity of 300 passengers per coach and will have airconditioned coaches. There will be more standing passengers in the proposed Vande Metro than sitting thus catering to mass commutership like a suburban train such MEMU, DEMU, EMU, etc. This will be a mix product of the EMU DNA with the facilities of a modern metro. Integral Coach Factory known as ICF is planning to roll out one prototype rake of Vande Metro by the end of Financial Year 2023-24. [105][106]

See also

Notes

  1. Maximum permissible speed over different sections as approved by the Commissioner of Railway Safety

References

  1. "Vande Bharat Express Trainset (V2.0) - Maintenance Manual, Specification name IRCAMTECH/GWL/2022-23/T-18/MM/2.0" (PDF). rdso.indianrailways.com. Retrieved 22 September 2022.
  2. "Train 18, India's Fastest, Named "Vande Bharat Express": Piyush Goyal". NDTV. Press Trust of India. 27 January 2019. Retrieved 3 July 2023.
  3. "PM Modi to inaugurate two Vande Bharat Express trains in Mumbai; check ticket prices and routes". CNBCTV18. 9 February 2023. Retrieved 21 December 2023. PM Modi will inaugurate the two semi-high-speed trains at the Chhatrapati Shivaji Maharaj Terminus
  4. "Bhopal Delhi Vande Bharat Express: TOP SPEED of 160 kmph! Is food free in Delhi to Bhopal semi high-speed train? Know time, route, ticket price". TimesNow. 3 April 2023. Retrieved 3 April 2023.
  5. "Jaipur-Delhi Vande Bharat to take 1.45 hours at 150 kmph, schedule, launch month revealed". DNA India. Retrieved 28 March 2023.
  6. "Watch: Vande Bharat Train's "Glass Filled To The Brim" Test At 180 Kmph". NDTV.com. Retrieved 10 November 2023.
  7. "VANDE BHARAT EXPRESS: A Make in India Success Story" (PDF). 16 January 2023. Retrieved 13 November 2023.
  8. "Vande Bharat takes around 5 hours in Ahmedabad-Mumbai trial run, breaks bullet train record". The Economic Times. 15 September 2022. ISSN 0013-0389. Retrieved 10 November 2023.
  9. "New Vande Bharat breaks bullet train record at 100km/hr speed in 52 seconds". Hindustan Times. 10 September 2022. Retrieved 10 November 2023.
  10. "RDSO design light aluminum coaches of Train-18 which can cruise at 200 KMPH". The Times of India. 23 June 2022.
  11. "RDSO Specification name IRCAMTECH/GWL/2020-21/T-18/MM/1.0" (PDF). rdso.indianrailways.gov.in. Retrieved 21 March 2023.
  12. "New, upgraded Vande Bharat trains to cost about Rs 115 crore: Officials". 28 May 2022.
  13. "Train 18: PM Modi to flag off Vande Bharat Express on 15 February from New Delhi". Business Today. Press Trust of India. 7 February 2019. Retrieved 15 February 2019.
  14. "LHB coaches reduced number of casualties". Deccan Herald. 26 June 2014. Retrieved 19 May 2023.
  15. "Rail Budget 2014: High-speed trains proposed to connect major cities". The Economic Times. 8 July 2014. ISSN 0013-0389. Retrieved 19 May 2023.
  16. "Delhi-Agra at 160 kmph: 10 points about Gatimaan, India's fastest train". Hindustan Times. 5 April 2016. Retrieved 4 May 2023.
  17. PTI (2 May 2017). "Indian Railways to invite bids for manufacturing modern coaches". The Statesman. Retrieved 19 May 2023.
  18. Dhoot, Vikas (24 July 2015). "Train from Spain: Government considering Talgo proposal to run trial runs of faster trains between Mumbai, Delhi". The Economic Times. New Delhi. Retrieved 24 July 2015.
  19. Rakesh Ranjan (2 January 2018). "Talgo high-speed trains stop in their tracks after government waves red flag". India Today. Retrieved 22 August 2021.
  20. "Indian Railways to roll out 'Make in India' 160 kmph self-propelled 'world-class' train sets at half the cost of import!". The Financial Express. 20 February 2017. Retrieved 20 May 2023.
  21. "Indian Railways enters new league! Swanky 160 kmph engine-less Make in India train is too good; 15 features". The Financial Express. 27 March 2018. Retrieved 20 May 2023.
  22. "Indian Railways to Replace Shatabdi Express with 'Made in India' Semi-High Speed, Engine-Less Train 18 | India.com". www.india.com. Retrieved 20 May 2023.
  23. "Watch: Vande Bharat clocks 183 km but glass filled to the brim with water stays stable". The Economic Times. 6 September 2022. Retrieved 31 October 2023.
  24. "Vande Bharat Train Clocks 180-183 km/hr At Trial Run". YouTube. CNBC-TV18. Retrieved 31 October 2023.
  25. "Train 18 named Vande Bharat Express: Piyush Goyal". The Economic Times. 27 January 2019. ISSN 0013-0389. Retrieved 20 May 2023.
  26. "Vande Bharat Express flagged off: How to book, fares and more". Hindustan Times. 15 February 2019. Retrieved 20 May 2023.
  27. "Train 18: PM Modi to flag off Vande Bharat Express on February 15 from New Delhi". Business Today. 7 February 2019. Retrieved 17 February 2019.
  28. "Train 18, India's first engine-less train, set to hit tracks on October 29", The Indian Express, 24 October 2018
  29. "Vande Bharat Express hits a cow and breaks down on Day 1". India Today. Retrieved 20 May 2023.
  30. "Vande Bharat Express: Reach Katra in 8 hours from Delhi - Amit Shah flags off Vande Bharat Express". The Economic Times. Retrieved 20 May 2023.
  31. "Fresh Tender System For Vande Bharat Express After 'Favouritism Charges'". NDTV. Press Trust of India. 16 July 2019. Retrieved 30 June 2023.
  32. "40 new Vande Bharat Express trains by 2022". Hindustan Times. 4 September 2019. Retrieved 20 May 2023.
  33. "Vande Bharat Express 2.0: PM flags off a new train between Gandhinagar and Mumbai, here's all to know". Business Today. 30 September 2022. Retrieved 5 December 2022.
  34. PIB Delhi (2 August 2023). "Salient Features of Vande Bharat Express Trains". Retrieved 24 November 2023.
  35. "Vande Bharat Express completes 1 year, earns ₹92 crore for railways". Mint. 19 February 2020.
  36. Ilankath, Ullas (5 May 2023). "Vande Bharat Express collects Rs 2.7 crore in ticket revenue from Kerala within 6 days". Manorama. Retrieved 30 May 2023.
  37. "Vande Bharat running at an average capacity of 99%". Deccan Herald. 11 February 2023. Retrieved 1 April 2023.
  38. Panda, Sushmita (24 July 2019). "Flexi fares in trains like Rajdhani and Duronto Express to continue: Piyush Goyal". indiatvnews.com. Retrieved 1 April 2023.
  39. "CAG finds faults in Railways' flexi-fare scheme, hints makes more sense for travellers to take flights". Business Today. 21 July 2018. Retrieved 30 May 2023.
  40. "Vande Bharat trains earn CR Rs 10.72 crore in 25 days". The Indian Express. 10 September 2023. Retrieved 10 September 2023.
  41. Mondal, Anish (16 May 2023). "Indian Railways temporarily replaces country's 6th Vande Bharat Express with Tejas rake – Details Inside". The Financial Express. Retrieved 17 May 2023.
  42. "Mini Vande Bharat trains may be introduced on Nagpur-Bilaspur route". The LIVE Nagpur. 8 April 2023. Retrieved 8 April 2023.
  43. "Tejas Express Replaces Bilaspur-Nagpur Vande Bharat Express Due To Poor Passenger Response". Business World. 3 June 2023. Retrieved 3 June 2023.
  44. "New Delhi–Varanasi Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  45. "New Delhi–Shri Mata Vaishno Devi Katra Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  46. "PM to flag off Vande Bharat 2 from Gandhinagar to Mumbai on Sept 30". The Indian Express. 13 September 2022. Retrieved 13 September 2022.
  47. "Mumbai Central–Gandhinagar Capital Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  48. "New Delhi–Amb Andaura Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  49. "MGR Chennai Central–Mysuru Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  50. "Bilaspur–Nagpur Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  51. "6th Vande Bharat train to be inaugurated on December 11". Hindustan Times. 4 December 2022. Retrieved 5 December 2022.
  52. "Howrah–New Jalpaiguri Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  53. "Visakhapatnam–Secunderabad Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  54. "Mumbai CSMT–Solapur Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  55. "CR strengthening tracks to increase speed of Vande Bharat trains". The Indian Express. 17 February 2023. Retrieved 2 April 2023.
  56. "Mumbai CSMT–Sainagar Shirdi Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  57. "CSMT-Shirdi Vande Bharat Express Train Speed Set to Increase to 130 KMPH, to Reduce Travel Time by 30 Mins". India.com. Retrieved 1 December 2023.
  58. "Rani Kamalapati (Habibganj)–Hazrat Nizamuddin Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  59. Chauhan, Arvind (21 March 2023). "From April 1, Vande Bharat Express to connect Bhopal with Delhi via Agra". The Times of India. Retrieved 1 December 2023.
  60. "Secunderabad–Tirupati Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  61. "Secunderabad-Tirupati Vande Bharat Express to get faster, have additional coaches. Check revised timings". The Economic Times. 16 May 2023. Retrieved 23 May 2023.
  62. "MGR Chennai Central–Coimbatore Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  63. "Ajmer–Delhi Cantonment Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  64. "Jaipur-Delhi Vande Bharat to take 1.45 hours at 150 kmph, schedule, launch month revealed". Daily News and Analysis. 25 March 2023. Retrieved 18 April 2023.
  65. "PM Flags Off Kerala's First Vande Bharat Express". NDTV. 25 April 2023. Retrieved 1 December 2023.
  66. "Kasaragod–Thiruvananthapuram Vande Bharat Express (via Kottayam)". Indiarailinfo. Retrieved 1 December 2023.
  67. "Howrah-Puri Vande Bharat Express: Check route, fare, timing, speed and how to book ticket". Zee Business. 11 May 2023. Retrieved 1 December 2023.
  68. "Howrah–Puri Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  69. "Dehradun–Anand Vihar Terminal Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  70. "PM Modi flags off Delhi-Dehradun Vande Bharat Express. Check timings, ticket price". India Today. 25 May 2023. Retrieved 25 May 2023.
  71. "New Jalpaiguri–Guwahati Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  72. Das, Dipaneeta (26 May 2023). "PM Modi to flag off Northeast's first Vande Bharat Express on May 29". India Today. Retrieved 30 June 2023.
  73. "Mumbai CSMT–Madgaon Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  74. "Mumbai-Goa Vande Bharat Express speed likely to be restricted". mid-day.com. 1 June 2023.
  75. "Patna–Ranchi Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  76. "KSR Bengaluru–Dharwad Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  77. "Bengaluru-Dharwad Vande Bharat Timings to Change Starting October 7". Times Now. 7 October 2023. Retrieved 1 December 2023.
  78. "Rewa-Rani Kamalapati (Habibganj) Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  79. "Indore-Nagpur Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  80. "Jodhpur-Sabarmati Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  81. "Vande Bharat Express: Lucknow to Gorakhpur via Ayodhya in Under 4 Hours, Check Details". News18. 5 July 2023. Retrieved 1 December 2023.
  82. "Gorakhpur-Lucknow Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  83. "Trial Run for Gorakhpur-Lucknow Vande Bharat Begins, Likely to Connect Ayodhya". News18. 1 July 2023. Retrieved 2 July 2023.
  84. "Udaipur-Jaipur Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  85. Jain, Smriti (24 September 2023). "PM Modi flags off 9 new Vande Bharat Express trains for 11 states; check routes, timetable, stoppages full details". The Times of India. Retrieved 1 December 2023.
  86. "MGR Chennai Central–Vijayawada Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  87. "Chennai Egmore–Tirunelveli Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  88. "Chennai-Tirunelveli Vande Bharat Express likely to be inaugurated by PM Modi on August 6". News9. 31 July 2023. Retrieved 31 July 2023.
  89. "Kacheguda-Yesvanthpur Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  90. "Patna-Howrah Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  91. "Ranchi-Howrah Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  92. Singh, Sachin (20 September 2023). "Ranchi News: Vande Bharat Express to Howrah All Set to Roll Out on September 24 - Route and Schedule Inside!". DNP INDIA. Retrieved 20 September 2023.
  93. "Puri-Rourkela Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  94. "Kasaragod–Thiruvananthapuram Vande Bharat Express (via Alappuzha)". Indiarailinfo. Retrieved 1 December 2023.
  95. "Ahmedabad–Jamnagar Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  96. "Varanasi–New Delhi Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  97. Athrady, Ajith (18 December 2023). "PM Modi flags off second Vande Bharat train between Varanasi and Delhi". Deccan Herald. Retrieved 31 December 2023.
  98. "Ayodhya Dham–Anand Vihar Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  99. "PM Modi flags off 2 new Amrit Bharat, 6 Vande Bharat Express trains during Ayodhya visit; check routes & other details". The Times of India. 30 December 2023. ISSN 0971-8257. Retrieved 31 December 2023.
  100. "SMVD Katra–New Delhi Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  101. "Amritsar–Delhi Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  102. "Coimbatore–Bangalore Cantonment Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  103. "Mangaluru–Madgoan Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  104. "Jalna–Mumbai CSMT Vande Bharat Express". Indiarailinfo. Retrieved 1 December 2023.
  105. Rao, Lingamgunta Nirmitha (14 April 2023). "'Vande Metro' to be rolled out by Dec 2023; Check features, other details". Hindustan Times. Retrieved 19 May 2023.
  106. "Vande Metro: Know all about India's fastest and next generation intercity train". Metro Rail Today. Retrieved 30 June 2023.

Media related to Vande Bharat Express trains at Wikimedia Commons

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.