Wolfe Island Wind Farm | |
---|---|
Country | Canada |
Location | Wolfe Island, Ontario (near Kingston, Ontario) |
Coordinates | 44°10′N 76°28′W / 44.167°N 76.467°W |
Status | Operational |
Owner(s) | Canadian Hydro Developers, Inc. |
Operator(s) | Canadian Hydro Developers, Inc. |
Power generation | |
Units operational | 86 x 2.3-megawatt (MW) |
Make and model | Siemens: Mark II |
Nameplate capacity | 197.8 MW |
External links | |
Commons | Related media on Commons |
Wolfe Island Wind Farm is a large wind farm project located on Wolfe Island, Ontario (near Kingston, Ontario). The wind farm became operational on June 29, 2009.[1] It is owned and operated by Canadian Hydro Developers, Inc., through its subsidiary Canadian Renewable Energy Corporation (CREC). The power will be purchased by Hydro One for distribution to consumers.
The wind farm consists of eighty-six 2.3-megawatt (MW) Siemens model Mark II wind turbines situated on the western portion of Wolfe Island.[2]
Once completed, the 197.8 MW project was expected to generate approximately 594 gigawatt-hours (GW·h) of renewable power annually; enough to supply about 75,000 average households.[3] Over its first four full years of operation, generation proved to be around 495 GWh annually (see below).
Winds of 3.5 to 4 metres per second (11 to 13 ft/s) are required to generate power; when winds are less than 3 metres per second (9.8 ft/s), then power is not being generated.[4]
Key project components
- padmount transformers at the base of each wind turbine
- access roads
- a 34.5-kilovolt (kV) electrical line collector system
- a 34.5 / 230 kV transformer station
- a 230 kV electrical line system provided by Nexans
- 230 kV interconnection facilities with the provincial grid at Hydro One's Gardiners Transformer Station
- an operations and maintenance building.
CREC has optioned a total of approximately 2513 hectares (6,209 acres) of land for the proposed wind development.[6]
The facility will provide green jobs and generate landowner and community income through royalties, taxes, and the amenities agreement. Canadian Hydro has built a visitor centre at its property on the 5th line.[7]
The 2010 Bird and Bat report commissioned by Transalta, a component of the Post Construction Follow-up Plan (PCFP), states that over the first six months of operation bird mortality due to blade strike was 602 birds of which 13 were raptors. That reflects 6.99 birds per turbine over six months (almost 14 strikes per turbine per year). The industry standard for comparable wind facilities is generally 2 bird strikes per turbine per year. Over 1270 bats were killed in the same six-month period. The development is in a globally and continentally significant Important Bird Area. The PCFP was designed in response to stakeholder concerns over potential negative effects on bird populations, and is a partnership between Transalta, the Environment Canada and provincial Ministry of Natural Resources.[8]
Production
Year | January | February | March | April | May | June | July | August | September | October | November | December | Total |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2009 | 4,615 | 6,792 | 21,328 | 24,330 | 28,049 | 46,907 | 32,110 | 52,551 | 216,682 | ||||
2010 | 40,500 | 30,839 | 54,313 | 40,941 | 31,088 | 25,053 | 25,079 | 29,767 | 46,278 | 47,636 | 47,039 | 50,819 | 469,352 |
2011 | 32,303 | 56,015 | 43,156 | 54,849 | 44,238 | 26,754 | 18,099 | 25,124 | 27,543 | 49,068 | 64,780 | 54,010 | 495,939 |
2012 | 55,585 | 51,178 | 48,738 | 44,933 | 29,658 | 34,323 | 20,894 | 28,393 | 35,549 | 54,090 | 40,945 | 51,070 | 495,356 |
2013 | 56,505 | 42,337 | 44,164 | 57,735 | 40,331 | 22,975 | 24,386 | 24,754 | 28,798 | 46,608 | 68,831 | 41,396 | 498,820 |
2014 | 73,346 | 46,498 | 57,045 | 44,469 | 40,488 | 23,320 | 33,237 | 24,695 | 32,019 | 54,268 | 41,140 | 470,525 |
See also
References
- ↑ CKWS evening news report June 29, 2009
- ↑ "Wolfe Island Wind Project (197.8 MW) - Wolfe Island". Ontario Power Authority. Retrieved 2013-07-07.
- ↑ "Wolfe Island". TransAlta. 2013-03-04. Retrieved 2013-07-07.
- ↑ Wolfe Island
- ↑ "Wolfe Island Wind Project" (PDF). Canadian Copper CCBDA (156). 2008. Retrieved 3 September 2013.
- ↑ "Plants in Operation" (PDF). wolfeislandwind.com. TransAlta. Retrieved 2013-07-07.
- ↑ Kingston EMC Thursday May 14, 2009 page 13
- ↑ "WOLFE ISLAND WIND PLANT POST-CONSTRUCTION FOLLOW- UP PLAN BIRD AND BAT RESOURCES" (PDF). Retrieved 2023-09-30.
- ↑ Wind Power in Ontario