Yellow Line
Overview
StatusUnder construction
LocaleAgra, Uttar Pradesh, India
Termini
  • Mankameshwar Mandir (further extended to Sikandra)
  • Taj East Gate
Service
TypeRapid transit
SystemAgra Metro
Operator(s)Uttar Pradesh Metro Rail Corporation
Rolling stockAlstom - Bombardier Movia
Technical
Line length
  • 6.5 km (4.0 mi) (priority corridor)
CharacterUnderground & Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed
  • 80 km/h (50 mph) (Top)
  • 34 km/h (21 mph) (average)
Route map

Sikandara
Guru Ka Taal
ISBT
Shastri Nagar
RBS College
Raja Ki Mandi
Agra College
Medical College
Mankameshwar Mandir
Agra Fort
Taj Mahal
Fatehabad Road
Basai
Taj East Gate

The Yellow Line (Line 1) (Hindi: येल्लो लाइन) is an under-construction metro rail line of the Agra Metro, a rapid transit system in Agra, Uttar Pradesh, India. The priority section of the line is expected to be operational by December 2023 or January 2024.[1][2]

List of stations

Yellow Line
# Station Name Inter-station Distance (in km) Opening Connections Layout Coordinates
EnglishHindi
1SikandraसिकंदराUnder constructionNoneElevated
2Guru Ka Taalगुरु का तालUnder constructionNoneElevated
3ISBTआई एस बी टीUnder constructionNoneElevated
4Shastri Nagarशास्त्री नगरUnder constructionNoneElevated
5RBS Collegeआर बी एस कॉलेजUnder constructionNoneUnderground
6Raja Ki Mandiराजा की मंडीUnder constructionNoneUnderground
7Agra Collegeआगरा कॉलेजUnder constructionNoneUnderground
8Medical Collegeमेडिकल कॉलेजUnder constructionNoneUnderground
9Mankameshwar Mandirमनकामेश्वर मंदिरUnder constructionNoneUnderground
10Agra Fortआगरा किलाUnder constructionNoneUnderground
11Taj Mahalताज महलUnder constructionNoneUnderground
12Fatehabad Roadफतेहाबाद रोडUnder constructionNoneElevated
13BasaiबसईUnder constructionNoneElevated
14Taj East Gateताज ईस्ट गेटUnder constructionNoneElevated

See also

References

  1. "CM Yogi vows to complete Agra Metro's priority corridor by December 2023". www.deccanherald.com. Retrieved 17 July 2023.
  2. "Agra Metro Rail project: First train to roll out by Jan 2024! All details on fare, rail corridors here". www.financialexpress.com. Retrieved 17 July 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.