Yusufguda
Hyderabad Metro station
General information
LocationA-91, Krishna Nagar Main Rd, Lakshmi Narasimha Nagar, Krishna Nagar, Yousufguda, Hyderabad, Telangana 500054.[1]
Coordinates17°26′06″N 78°25′35″E / 17.4350829°N 78.4265277°E / 17.4350829; 78.4265277
Line(s)Blue Line
Tracks2
Construction
Structure typeElevated
Platform levels2
History
Opened20 March 2019 (2019-03-20)
Services
Preceding station Hyderabad Metro Following station
Road No 5 Jubilee Hills
towards Raidurg
Blue Line Taruni Madhura Nagar
towards Nagole
Location
Yusufguda metro station is located in Telangana
Yusufguda metro station
Yusufguda metro station
Location in Telangana

Yusufguda Metro Station is located on the Blue Line of the Hyderabad Metro.[2][3] It is near to Krishna kanth Park, Kotla Vijaya bhaskar Stadium, Pochamma Temple, Krishna Hospital, Vidyaniketan High Schoolm and Lakshmi Narasimha Nagar road[1]

History

The work started in 2015. The deadline of completion was delayed due to multiple issues.[4]

In September 2017, Alpha-numeric numbers were given to Metro Rail pillars to link them with the Google map for citizens and tourists to identify different locations of the Metro Rail network.[5]

In November 2017, Telangana State Power Transmission Corporation planned to start supplying uninterrupted power to metro rail network from four dedicated 132 KV receiving substations (RSS) at Uppal and Miyapur metro depots, Yousufguda and MGBS.[6]

On 27 September 2018, The Chief Electrical Inspector (CEIG) for Hyderabad Metro Rail accorded sanction for energisation. The Yousufguda 132 kV /33 kV /25 kV Metro RSS was the fourth and the last RSS that was energised.[7][8]

In November 2018, on the occasion of the first anniversary of the L&T Metro train operations, the trial run of the Metro train between Ameerpet and Hi-tec City (Corridor III) began.[9]

On 20 March 2019, the station was opened and Governor E.S.L. Narasimhan flagged off Metro train services on Ameerpet-Hitec City stretch (10 km) of Corridor-III (Nagole-Ameerpet-Hitec City).[10][11]

In August 2019, Hyderabad Metro Rail Limited announced that the average train frequency on the busy route from Nagole to Hitec City will be increased to 4 minutes during peak hours which was previously about 7 to 15 minutes. [12]

In 2020, due to Covid-19 restrictions the platform was closed. It remained closed even after rest of the metro started as it was located in a containment zone.[13]

The station

Structure

Yusufguda elevated metro station is situated on the Blue Line of Hyderabad Metro.[1]

Stations address is

A-91, Krishna Nagar Main Rd,

Lakshmi Narasimha Nagar, Krishna Nagar,

Yousufguda, Hyderabad,

Telangana 500045 [14]

Facilities

The stations have staircases, elevators and escalators from the street level to the platform level which provide easy and comfortable access. Also, operation panels inside the elevators are installed at a level that can be conveniently operated by all passengers, including differently-abled and elderly citizens.[1] Two wheeler paid parking is available at Entry Gate C. [15]

Station layout

Street Level
This is the first level where passengers may park their vehicles and view the local area map.[16]
Concourse level
Ticketing office or Ticket Vending Machines (TVMs) is located here. Retail outlets and other facilities like washrooms, ATMs, first aid, etc., will be available in this area.[16]
Platform level
This layer consists of two platforms. Trains takes passengers from this level.[16]
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform No- 1, doors will open on the left Disabled access
Southbound Towards →Raidurg→ →
Northbound Towards ← Nagole← ←
Side platform No- 2, doors will open on the left Disabled access
L2

Entry/exit

Yusufguda station Entry/exits
Gate No-A Gate No-B Gate No-C Gate No-D

See also

References

  1. 1 2 3 4 "Metro Stations". ltmetro.com. Retrieved 7 February 2020.
  2. "Hyderabad metro to commission line up to Hitec City by year end".
  3. "Hyderabad metro stations we keenly await".
  4. "Hyderabad: Unkept promises cause traffic jams".
  5. "Hyderabad: Metro pillars to be linked with Google Maps".
  6. "Metro rail to get uninterrupted power from 4 Transco substations". The New Indian Express. Retrieved 26 August 2023.
  7. "Yousufguda receiving sub station also energised". The New Indian Express. Retrieved 26 August 2023.
  8. Shah, Reeta (28 September 2018). "CEIG inspects 33kV/415V substations at 4 Metro stations". Metro Rail News. Retrieved 26 August 2023.
  9. Shah, Narendra (30 November 2018). "Hyderabad Metro begins trials on Ameerpet-Hitec City". Metro Rail News. Retrieved 26 August 2023.
  10. Service, Hans News (20 March 2019). "Governor flags off Metro train services on Ameerpet-Hitech City stretch". www.thehansindia.com. Retrieved 26 August 2023.
  11. "Ameerpet-Hitec City Metro rail stretch to be opened for public tomorrow". The New Indian Express. Retrieved 26 August 2023.
  12. "Hyderabad Metro to see one train every 4 mins at Hitec city during peak hours". The News Minute. 21 August 2019. Retrieved 26 August 2023.
  13. India, The Hans (4 September 2020). "Hyderabad Metro Rail all set for post-lockdown ride". www.thehansindia.com. Retrieved 26 August 2023.
  14. "Metro Stations". Hyderabad Metro Rail. Retrieved 31 May 2023.
  15. "Metro Stations". Hyderabad Metro Rail. Retrieved 31 May 2023.
  16. 1 2 3 "Metro Stations". ltmetro.com. Retrieved 7 February 2020.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.