Blue Line
Overview
StatusOperational
LocaleAhmedabad
Termini
Stations18
16 (operational)
Service
TypeRapid Transit
SystemAhmedabad Metro
Operator(s)Gujarat Metro Rail Corporation Limited
Rolling stockHyundai Rotem
History
Opened4 March 2019
Technical
Line length21.23 km (13.19 mi)[1]
CharacterElevated and underground
Track gauge1,435 mm (4 ft 8+12 in) (Standard gauge)
Electrification750V DC Third Rail
Route map

Thaltej Gam
Thaltej
Doordarshan Kendra
Gurukul Road
Gujarat University Ahmedabad Bus Rapid Transit System
Commerce Six Road
SP Stadium
Old High Court Subway interchange Red Line
Shahpur
Gheekanta
Kalupur Railway Station Ahmedabad Bus Rapid Transit System Ahmedabad Junction railway station
Kankaria East Ahmedabad Bus Rapid Transit System
Apparel Park Depot
Apparel Park
Amraiwadi
Rabari Colony Ahmedabad Bus Rapid Transit System
Vastral
Nirant Cross Road
Vastral Gam

The Blue Line of the Ahmedabad Metro is the first metro line of the Ahmedabad city's mass rapid transit rail. It consists of 18 metro stations (including two under construction), starting from Vastral Gam and ending at Thaltej Gam, with a total distance of 21.23 km (13.19 mi), with most of the it being elevated.

History

The ground breaking ceremony was held on 14 March 2015 for the construction of 6.5 km (4.0 mi) long Vastral – Apparel Park stretch of Blue Line of the Phase-1 in presence of then Gujarat Chief Minister, Anandiben Patel. The work started in March 2016.[2][3][4][5] The trial runs were carried out on the section in February 2019.[6][7] The section was inaugurated on 4 March 2019 by Indian Prime Minister Narendra Modi along with Chief Minister of Gujarat Vijay Rupani and Deputy Chief Minister Nitinbhai Patel.[8][9] It opened to the public on 6 March 2019.[10] The 1.4 km (0.87 mi)-long Thaltej-Thaltej Gam section and two metro stations, Thaltej Gam and Kankaria East, will be completed by December 2023.[11][12][13] The rest of the Phase-1 was inaugurated on 30 September 2022 by Prime Minister Modi.[14] The Blue Line was opened to public on 2 October 2022.[15][16] On opening day, total 41,700 tickets were sold, generating revenue of 6 lakh (US$7,500), and total 72 trips were made.[17] On next day, 17,000 people travelled on 44 trips.[15]

Features

While connecting Vastral Gam to Thaltej Gam, this line will be passing through Nirant Cross Road, Vastral, Rabari Colony, Amraiwadi, Apparel Park, Kankaria East, Kalupur Railway Station, Ghee Kanta, Shahpur, Old High Court, Stadium, Commerce Six Road, Gujarat University, Gurukul Road, Doordarshan Kendra and Thaltej stations.

The total distance of the corridor is 21.23 km (13.19 mi) with most of the it being elevated. The underground section is approximately 6.5 km (4.0 mi) in length with 4 underground stations, while the elevated section has 14 elevated stations. Old High Court station serves as an interchange station for the Blue Line and Red Line.

The underground section is constructed about 22 metre deep at the lowest level near Gheekanta station. The other three underground stations are about 12-14 metres deep.[18]

List of stations

Following is a list of stations on this route:[19]

Blue Line
# Station Name Opening Connections Layout
EnglishGujarati
1Thaltej Gamથલતેજ ગામDecember 2023[20]NoneElevated
2Thaltejથલતેજ30 September 2022NoneElevated
3Doordarshan Kendraદૂરદર્શન કેન્દ્ર30 September 2022NoneElevated
4Gurukul Roadગુરુકુલ રોડ30 September 2022Ahmedabad BRTS[21] at Helmet Cross RoadsElevated
5Gujarat Universityગુજરાત યુનિવર્સિટી30 September 2022NoneElevated
6Commerce Six Roadકોમર્સ છ રસ્તા30 September 2022NoneElevated
7SP Stadiumએસ પી સ્ટેડિયમ30 September 2022NoneElevated
8Old High Courtજૂની હાઇ કોર્ટ30 September 2022 Red Line Elevated
9Shahpurશાહપુર30 September 2022NoneUnderground
10Gheekantaઘીકાંટા30 September 2022NoneUnderground
11Kalupur Railway Stationકાલુપુર રેલ્વે સ્ટેશન30 September 2022Ahmedabad Junction railway station and Mumbai–Ahmedabad high-speed rail corridor[22]Underground
12Kankaria Eastકાંકરિયા પૂર્વDecember 2023 NoneUnderground
13Apparel Parkએપેરલ પાર્ક4 March 2019NoneElevated
14Amraiwadiઅમરાઈવાડી18 May 2019NoneElevated
15Rabari Colonyરબારી કોલોની4 March 2019Ahmedabad BRTS[23]Elevated
16Vastralવસ્ત્રાલ4 March 2019NoneElevated
17Nirant Cross Roadનિરાંત ક્રોસ રોડ4 March 2019NoneElevated
18Vastral Gamવસ્ત્રાલ ગામ4 March 2019NoneElevated

Construction

The Gujarat Metro Rail Corporation (GMRC) Limited has divided the construction work of the 20.73 km long Blue Line of Ahmedabad Metro into multiple construction packages.

The list of contractors is as follows:

Sr. No Package No. of Stations Contractor
1. Vastral GamApparel Park Viaduct only J. Kumar Infraprojects
2. Vastral GamApparel Park 6 DRA Infracon-CICO JV
3. Apparel Park Depot Depot only URC Construction
4. Kalupur – West Ramp 2 Larsen and Toubro
5. ThaltejThaltej Gam 2 DRA Infracon
6. East Ramp – Kalupur 2 Afcons Infrastructure

Map

References

  1. "PM Modi inaugurates Ahmedabad Metro first phase, takes a ride". Economic Times. 4 March 2019.
  2. India (5 February 2015). "Mumbai-based firm wins bid for Ahmedabad metro construction". The Indian Express. Retrieved 25 February 2015.
  3. DeshGujarat (14 March 2015). "First 6 km works of Ahmedabad Metro to complete by September 2016:CM". DeshGujarat. Retrieved 12 April 2015.
  4. "IL&FS; Engineering Services Bags Rs. 374.64 Cr Metro Rail Contract in Gujarat". The Hans India. 15 December 2015. Retrieved 16 December 2015.
  5. DeshGujarat (22 October 2014). "MEGA invites tender for Vastral-Apparel Park stretch of Ahmedabad METRO Rail project". DeshGujarat. Retrieved 25 February 2015.
  6. "Rs 3,116 cr spent on Ahmedabad Metro so far - Times of India". The Times of India. Retrieved 21 October 2018.
  7. "Now, Metro trial run will be held by February 18 - Times of India". The Times of India. Retrieved 20 January 2019.
  8. "PM Narendra Modi inaugurates Ahmedabad Metro first phase, takes a ride". Mint. 4 March 2019. Retrieved 8 March 2019.
  9. "Ahmedabad Metro Phase 2 gets Modi Cabinet clearance ahead of Phase 1 inauguration on 4 March". The Financial Express. 21 February 2019. Retrieved 4 March 2019.
  10. "Ahmedabad Metro to open for public on Wednesday - Times of India". The Times of India. Retrieved 10 March 2019.
  11. "Ten firms bid for last section of Phase-2 of Ahmedabad Metro". The Indian Express. 15 May 2022. Retrieved 11 June 2022.
  12. "Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year". The Indian Express. 11 July 2022. Retrieved 13 July 2022.
  13. "Ahmedabad Metro receives CMRS clearance". The Indian Express. 17 September 2022. Retrieved 30 September 2022.
  14. "PM Modi to launch Ahmedabad Metro Phase 1, flag off Vande Bharat Express during two-day Gujarat visit". 28 September 2022.
  15. 1 2 "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 4 October 2022.
  16. "મેટ્રો ટ્રેનની સવારી: અમદાવાદમાં થલતેજ-વસ્ત્રાલ મેટ્રો ગાંધી જયંતીથી, એપીએમસી-મોટેરા 6 ઓક્ટોબરથી શરૂ થશે". Divya Bhaskar (in Gujarati). 30 September 2022. Retrieved 30 September 2022.
  17. "Huge demand on Day 1 of Ahmedabad Metro". The Indian Express. 2 October 2022. Retrieved 3 October 2022.
  18. "Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year". The Indian Express. 11 July 2022. Retrieved 13 July 2022.
  19. "Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year". The Indian Express. 11 July 2022. Retrieved 13 July 2022.
  20. "Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year". The Indian Express. 11 July 2022. Retrieved 13 July 2022.
  21. "Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year". The Indian Express. 11 July 2022. Retrieved 13 July 2022.
  22. "Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year". The Indian Express. 11 July 2022. Retrieved 13 July 2022.
  23. "Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year". The Indian Express. 11 July 2022. Retrieved 13 July 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.