Vijay Nagar
Ahmedabad Metro station
Nameboard of Vijay Nagar metro station
General information
LocationSardar Colony, Ahmedabad, Gujarat 380013
Coordinates23°03′22″N 72°33′45″E / 23.05618°N 72.56239°E / 23.05618; 72.56239
Owned byGujarat Metro Rail Corporation Limited
Operated byAhmedabad Metro
Line(s)Red Line
PlatformsSide platform
Platform-1 → Motera Stadium
Platform-2 → APMC
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes Disabled access
Other information
StatusOperational
History
Opening6 October 2022 (6 October 2022)
Electrified750 V DC third rail
Services
Preceding station Ahmedabad Metro Following station
Vadaj Red Line Usmanpura
towards APMC
Location

Vijay Nagar is an elevated metro station on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India.[1] Around this metro station holds the main Naranpura neighbourhood. This metro station was inaugurated on 30 September 2022 by Prime Minister Narendra Modi and was opened to the public on 6 October 2022.

Station layout

Vijay Nagar track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → APMC next station is Usmanpura
Platform 1
Northbound
Towards ← Motera Stadium next station is Vadaj
Side platform | Doors will open on the left Disabled access
L2

See also

References

  1. "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 12 August 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.