Challaghatta
Namma Metro station
Namma Metro train terminating at this metro station
General information
LocationMysore Main Road, Mysore Rd, BSM Extension, Kengeri Satellite Town, Bengaluru, Karnataka 560060
Coordinates12°53′51″N 77°27′40″E / 12.89742°N 77.46124°E / 12.89742; 77.46124
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Purple Line
PlatformsSide platform
Platform-1 → Whitefield (Kadugodi)
Platform-2 → Train Terminates Here
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
ParkingCar parking Two Wheeler only
AccessibleYes Disabled access
Other information
StatusOperational & Staffed
Station codeCLGA
History
Opened9 October 2023 (9 October 2023)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Kengeri Purple Line Terminus
Location

Challaghatta is the elevated western terminal metro station on the East-West corridor of the Purple Line of Namma Metro in the Bangalore border, India. It is on a 2.05 km extension from Kengeri metro station.[1] Alongside the station passes the main Bengaluru - Mysuru NH 275 Expressway which leads towards the cities of Mysore and Mangalore. Trial runs on the new Kengeri - Challaghatta section of the line commenced on 29 July 2023.[2][3][4] The station was opened and scheduled services commenced on 9 October 2023. No inauguration ceremony was held,[5][6] but the new section of line was virtually inaugurated by Prime Minister Mohdi on 20 October 2023.[7]

History

In the 2011 plans for Phase 2 of the Metro extension, its western terminus was to be at Kengeri, where a train depot was to be built. However, the anticipated site could not be procured and so plans were revised to construct the depot and a further Metro station at Challaghatta.[8] The Karnataka government gave approval for the station in January 2019.[9] The station was scheduled to open by March 2022 but delays put down by an official of the Bangalore Metro Rail Corporation Limited to "land acquisition issues", complications in building the overhead structure and labour shortages from waves of COVID-19 set back the project.[10]

Challaghatta is the smallest of the Phase I and II Bengaluru Metro stations and unlike the others, this metro station has no concourse. The distance from the train to the stairs and escalators is half that found at most other Metro stations. The station has two each of staircases, lifts and escalators. It is anticipated that between five and six hundred travellers will use the station daily.[11]

Shortly after opening, access to the station was criticised by students at nearby colleges, who must cross a busy road to reach the entrance. A pedestrian bridge over the road scheduled for construction by National Highways Authority of India has been delayed.[12]

According to estate agents, the station has led to a significant increase in property prices in the area.[13]

Station layout

Challaghatta track layout
to Train Terminates Here
P2
P1
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side Platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Whitefield (Kadugodi) next station is Kengeri
Platform 2 Westbound Towards ← Train Terminates Here
Side Platform | Doors will open on the left Disabled access
L2

Entry/Exit

There are 2 Entry/Exit points - A and B. Commuters can use either of the points for their travel.

  • Entry/Exit point A: Towards Mysore Road side
  • Entry/Exit point B: Towards Challaghatta side

Nearby

See also

References

  1. B.P, Darshan Devaiah (9 October 2023). "Operations begin on entire Whitefield-Challaghatta Purple Line metro corridor, connecting east and west Bengaluru". The Hindu. ISSN 0971-751X. Retrieved 26 October 2023.
  2. "Slow-speed trial run begins on Kengeri-Chellaghatta metro line in Bengaluru". Deccan Herald. 29 July 2023. Retrieved 31 July 2023.
  3. "Namma Metro trial run begins from Kengeri to Challaghatta". The Times of India. 30 July 2023. ISSN 0971-8257. Retrieved 31 July 2023.
  4. "Direct Metro Line from Whitefield to Challaghatta: Namma Metro To Start Trials on Missing Links on August 22". TimesNow. 14 July 2023. Retrieved 16 July 2023.
  5. "Ops on full Purple Line to start today; formal launch of 2 new stretches later". The Times of India. 9 October 2023. ISSN 0971-8257. Retrieved 9 October 2023.
  6. Siddiqui, Muthi-ur-Rahman. "Bengaluru Metro's full Purple Line opens on Oct 9; Check timings, frequency & fare". Deccan Herald. Retrieved 9 October 2023.
  7. Agarwal, Ayushi (20 October 2023). "PM Modi virtually inaugurates Bengaluru Metro Purple Line extension". cnbctv18.com. Retrieved 28 October 2023.
  8. Lallitha, S. (3 September 2021). "Bengaluru Metro's land issue at Kengeri a boon for Challaghatta". The New Indian Express. Retrieved 27 October 2023.
  9. Kidiyoor, Suchith (20 April 2019). "Multi-level parking facility to come up near metro stations". The Hindu. ISSN 0971-751X. Archived from the original on 27 October 2023. Retrieved 27 October 2023.
  10. Lalitha, S. (21 January 2022). "Challaghatta Metro station to be ready for train operations by August". The New Indian Express. Retrieved 27 October 2023.
  11. Geetha (15 June 2022). "ಚಲ್ಲಘಟ್ಟ ಮೆಟ್ರೋ ಕಾಮಗಾರಿ ಶೇ.40ರಷ್ಟು ಪೂರ್ಣ! (tr. Challaghat Metro work is 40% complete!)". Webdunia (in Kannada). Retrieved 26 October 2023.
  12. Lalitha, S. (11 October 2023). "Students risk lives to reach Challaghatta Metro station". The New Indian Express. Retrieved 26 October 2023.
  13. Prakash, V L (21 October 2023). "BM Property: Property boost: Kudos to metro connectivity". Bangalore Mirror. Retrieved 28 October 2023.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.