Holmside Hall Wind Farm | |
---|---|
Country | England, United Kingdom |
Location | Stanley, County Durham |
Coordinates | 54°50′50″N 1°41′13″W / 54.8472°N 1.68694°W |
Status | Operational |
Commission date | May 2004 |
Owner(s) | E.ON UK |
Site elevation | 722 ft |
Power generation | |
Units operational | 2 × 2.75 MW |
Make and model | NEG Micon |
Nameplate capacity | 5.5 MW |
External links | |
Commons | Related media on Commons |
Holmside Hall Wind Farm is a wind farm near Stanley, County Durham, England. Owned and operated by E.ON UK, the farm has a nameplate capacity of 5.5MW, containing two NM80 turbines each rated at 2.75 MW.[1]
At the time of construction, which was delayed due to high winds, the turbines were the largest and most powerful in the UK.[2]
References
- ↑ "UKWED Operational wind farms". RenewableUK. Archived from the original on 25 February 2006. Retrieved 2 August 2010.
- ↑ "Ironically, wind conditions delay turbines". The Northern Echo. Newsquest Media Group. 13 November 2003. Retrieved 11 November 2009.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.