West Durham Wind Farm
West Durham Wind Farm
CountryEngland, United Kingdom
Locationnear Tow Law, County Durham
Coordinates54°46′05″N 1°49′18″W / 54.7680°N 1.8216°W / 54.7680; -1.8216
StatusOperational
Commission dateMay 2009
Owner(s)ESB Group
Power generation
Units operational26 × 2 MW
Make and modelREpower: MM82
Nameplate capacity24 MW

West Durham Wind Farm is a wind farm near Tow Law, County Durham, England.

History

Developed by County Durham-based company the Banks Group, the farm was planned as the largest wind farm in North East England. Construction of the farm began on the 11 July 2008. It was hoped that the commissioning of the turbines would make County Durham the first English county to hit its 2010 renewable energies target.[1] The farm was commissioned in May 2009. In 2009 it was purchased by the Electricity Supply Board[2]

Design and specification

The wind farm has a nameplate capacity of 24MW, containing twelve Repower MM82 turbines each rated at 2MW.[3] It was the first wind farm containing turbines supported on driven steel tubular piles.[4]

References

  1. Guy, Ben (11 July 2008). "BIGGEST SO FAR". The Journal. Retrieved 10 August 2011.
  2. "Irish firm buys its first British wind farms".
  3. "BWEA: Coupons, Promo Codes & Deals for Online Brands".
  4. "Sweco UK | Engineering, Environment, Design & Regulatory Consultants".


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.