Line 17
A CCD5035 train reversing at Jiahuihu station
Beijing MTR
Overview
Other name(s)M17 / R2 (planned name)
StatusPartly in operation
TerminiFuture Science City North - Workers' Stadium (North section)
Shilihe - Jiahuihu (South section)
Stations9 (North section)
7 (South section)
21 (Total)
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing MTR Corporation Limited[1]
Depot(s)Ciqunan and Xiejiacun
Rolling stock8-car Type A
History
Opened31 December 2021 (2021-12-31) (South)[2]
December 30, 2023 (2023-12-30) (North)[3]
2024 (Middle)
Technical
Line length25 km (16 mi) (North section)
15.8 km (9.8 mi) (South section)
49.7 km (30.9 mi) (Total)
CharacterUnderground[4]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed100 km/h (62 mph)[5]
Route map

Future Science City North
Wenyu river
Future Science City
Xiejiacun depot
Tiantongyuandong
Qing river
Qingheying
Line 13 crossing
Shuangsha railway crossing
Hongjunying
Beixiao river
line 13 Xizhimen Right arrow
Wangjingxi
Left arrow line 13 Dongzhimen
Taiyanggong
Left arrow outer – inner Right arrow
Ba river
Xibahe
Line 12 (opens 2024)
connects line 12
Zuojiazhuang
Liangma river
Workers' Stadium
Line 3 (opens 2024)
Left arrow Dongsi Shitiao – Caogezhuangbei Right arrow
connects line 3
Dongdaqiao
Pinggu line (opens 2025)
Pinggu Right arrow
Line 28 (opens 2029)
Guangqudonglu Right arrow
Yong'anli
Tonghui river
Guangqumenwai
Panjiayuanxi
Shilihe
Left arrow inner – outer Right arrow
Zhoujiazhuang
Shibalidian
Fengshuang railway
Beishenshu
Tonghui irrigate canal
Ciqubei
Ciqu
Ciqunan yard
Jiahuihu

Line 17 of the Beijing Subway (Chinese: 北京地铁17号线; pinyin: běijīng dìtiě shíqī hàoxiàn) is a rapid transit line that is partially in operation in Beijing.[6][7] The line is fully underground and has a total length of 49.7 km (30.9 mi).[4] It is scheduled to open in parts between 2021 and 2024.[3] The line is operated by Beijing MTR Corporation Limited.[1] Line 17's color is turquoise.

The south section of Line 17 opened on December 31, 2021. The north section of Line 17 opened on 30 December 2023 (except Wangjingxi),[8][9] while the middle section of Line 17 is expected to open in 2024.[3]

Description

Line 17 is planned to run from the Future Science Park North station in Changping District to Jiahuihu station in Tongzhou District.[10][11] The line will be fully underground and have a total length of 49.7 km (30.9 mi).[4][11] The expected end-to-end travel time is approximately 56 minutes.[12] Once complete, the line will help alleviate congestion on Line 5, Line 10 and Line 13.[12]

Rolling stock

Line 17 train delivered to Dahongmen railway station in May 2021

Line 17 uses 8-car Type A rolling stock.[7]

Opening time

SegmentCommencementLengthStation(s)Name
Shilihe — Jiahuihu 31 December 2021 15.8 km (9.8 mi)[13][14] 7 Southern section
Future Science City North — Workers' Stadium 30 December 2023[8] 24.9 km (15.5 mi)[15][16] 9 Northern section
Wangjingxi To be determined Infill station 1

Stations

Station Name[17][18] Connections Nearby Bus Stops Distance
km[19]
Location
English Chinese
Future Science City North 未来科学城北 487 0.000 0.000 Changping
Future Science City 未来科学城 417 1.692 1.692
Tiantongyuandong 天通苑东 301 432 530 夜26 专58 专119 5.899 7.591
Qingheying 清河营 386 596 1.875 9.466 Chaoyang
Hongjunying 红军营 386 415 530 621 966 1.932 11.398
Wangjingxi 望京西  13   15  5.031 16.429
Taiyanggong 太阳宫  10  130 132 467 515 567 939 966 专212 2.498 18.927
Xibahe 西坝河  12  95 130 300 300快 302 368 379 419 596 604 641 671 847 916快 942快 980快 快速直达专线93 快速直达专线141 夜30 1.208 20.135
Zuojiazhuang 左家庄 3 18 24 110 120 123 132 359 379 401 404 515 536 675 850 850快 915 915快 916 916快 935 935快 942快 966 980 980快 夜18 夜24 2.411 22.546
Workers' Stadium 工人体育场  3  3 4 43 110 113 115 117 118 120 403 406 431 夜3 夜6 夜24 夜34 2.330 24.876
Dongdaqiao 东大桥  6 
Yong'anli 永安里  1 
Guangqumenwai 广渠门外  7  Dongcheng
Panjiayuanxi 潘家园西 Chaoyang
Shilihe 十里河  10   14  28 53 300 300快 352 368 378 439 440 513 638 649 680 687 846 848 973 975 976 985 986 995 快速直达专线91 快速直达专线217 夜30 专19 专72 0.000 0.000
Zhoujiazhuang 周家庄 378 638 976 986 快速直达专线91 专72 1.672 1.672
Shibalidian 十八里店 专217 2.349 4.021
Beishenshu 北神树 440 637 820 986 专182 专187 5.840 9.861 Tongzhou
Ciqubei 次渠北 913 T12 T68 T68区 专232 2.334 12.195
Ciqu 次渠  Yizhuang  637 820 986 T11 T56 T87 专159 专207 1.455 13.650
Jiahuihu 嘉会湖[20] 专207 2.125 15.775

History

Project headquarters of Line 17 Dongdaqiao station in March 2017.

In January 2011, an official with the city's planning committee indicated that Line 17 of the subway was planned to run east–west through the city's Central Business District under Guanghua Road with transfers to Lines 4 and 5.[21] However, the line run through Central Business District is known as Line 28 now.

In February 2012, the city's planning committee identified a different Line 17, as a line planned for 2020, that would run north–south from Tiantongyuan to Yizhuang that would run parallel and to the east of Line 5.[22] On June 15, 2012, the city government disclosed tentatively planned stations for the line.[23][10][24][11]

On 10 October 2013, city authorities confirmed that Line 17 would run from the Future Science Park North station in Changping District to Yizhuang Zhanqianqu South station in Tongzhou District.[11] Construction was expected to begin in 2014 and Line 17 would have a total length of 49.7 km (30.9 mi).[11]

Construction of the line began in 2015.[25][26]

On 8 July 2022, an EIA document prepared by the China Academy of Railway Sciences (CARS) regarding Phase III (2022–2027) construction of the Beijing Subway announced an 8.9 km (5.5 mi) branch line of Line 17 from Tiantongyuandong Station to Beiqijia, with one intermediate station not identified.[27]

References

  1. 1 2 "确定了!北京地铁17号线,京港地铁公司运营". 30 December 2019.
  2. "北京今年年底预计开通7条(段)地铁 总计约54公里". 26 February 2021.
  3. 1 2 3 "4段地铁6条道路陆续完工 未来科学城出行便捷度将升级". 7 February 2023. 其中,地铁17号线北段、中段分别预计2023年和2024年开通
  4. 1 2 3 "北京地铁17号线拟2021年全线开通,为城区最长在建线路".
  5. "北京地铁17号线南段年底开通". 24 February 2021.
  6. "北京地铁17号线力争年内全线开工 将打造成一体化设计标准示范线-千龙网·中国首都网". beijing.qianlong.com. Retrieved 29 May 2018.
  7. 1 2 "北京地铁17号线二次环评公示 拟撤永安里北站_新闻频道_中华网". news.china.com. Archived from the original on 16 August 2015.
  8. 1 2 "地铁17号线北段等三条地铁线(段)开通试运营" (in Chinese). Beijing Municipal Commission of Transport. 29 December 2023. Retrieved 29 December 2023. 2023年12月30日(周六)首班车起,地铁17号线北段(工人体育场—未来科学城北)、16号线剩余段(榆树庄—宛平城)及苏州街站、11号线西段剩余段(金安桥—模式口)开通试运营
  9. "年底见!17号线北段和16号线剩余段开通筹备中~". mp.weixin.qq.com. Beijing MTR Corporation Limited. 18 December 2023. Retrieved 19 December 2023.
  10. 1 2 (Chinese) "北京将再增3条新地铁" 《新京报》 2012-06-16
  11. 1 2 3 4 5 (Chinese) "北京地铁17号线有望明年开建 从昌平至亦庄" 新京报 Archived 2016-01-07 at the Wayback Machine 2013-10-10
  12. 1 2 "17号线2020年开通南北段".
  13. "17号线 北京京港地铁有限公司".
  14. "北京今日开通9条地铁线(段) 3条主干线贯通南北". 31 December 2021.
  15. 孙宏阳 (Sun Hongyang) (27 December 2023). "@天通苑居民,地铁进城将多一种更快选择:17换10".
  16. "东边的朋友注意了!坐这条地铁新线,可以比原来快10分钟!".
  17. "地名公告". 北京市规划和自然资源委员会. Archived from the original on 1 July 2023. Retrieved 1 July 2023.
  18. "轨道交通17号线、19号线一期、昌平线南延一期工程沿线车站命名预案" (PDF) (in Chinese). Beijing Municipal Commission of Planning and Natural Resources. 19 July 2021. Retrieved 20 July 2021.
  19. "17号线路网车站站间距信息". Retrieved 11 June 2022.
  20. "地名公告>嘉会湖站". 9 November 2021. Retrieved 9 November 2021.
  21. (Chinese) Roll.sohu.com "CBD核心区地铁17号线地下步道规模空前" 中证网 2011-01-17
  22. "北京6条地铁新线开始前期调研". 13 February 2012. Archived from the original on 29 July 2022.
  23. (Chinese) "北京再规划建设3号、12号、R2线三条新地铁线路" 中国质量新闻网 2012-06-16
  24. (Chinese) "北京将再增3条新地铁" 新京报 2012-06-16
  25. "地铁17号线将在2022年底试运行,全程21站". 10 June 2019.
  26. "北京地铁17号线两站已开工 一车站将建最长站台". 中国国情 (in Chinese). 4 May 2016. Retrieved 18 May 2016.
  27. "北京市轨道交通第三期建设规划(2022-2027年)环境影响报告书(征求意见稿).pdf" (PDF). China Academy of Railway Sciences Co., Ltd. 8 July 2022. Archived from the original (PDF) on 9 July 2022. Retrieved 8 July 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.