Pingguoyuan[1]

苹果园
Beijing Subway
Line 6 platform

Line S1 originating platform
General information
LocationPingguoyuan South Road (苹果园南路)
Pingguoyuan Subdistrict, Shijingshan District, Beijing
China
Coordinates39°55′36″N 116°10′39″E / 39.926727°N 116.177388°E / 39.926727; 116.177388
Operated byBeijing Mass Transit Railway Operation Corp., Ltd
Line(s)     Line 1 (Closed until late 2023,[2] for renovation)
     Line 6
     Line S1
Platforms6 (1 island platform and 2 side platforms, 2 side platforms under renovation)
Tracks6
Construction
Structure typeUnderground (Line 1 & Line 6)
Elevated (Line S1)
AccessibleYes
Other information
Station code103 (Line 1)
History
OpenedApril 23, 1973 (1973-04-23) (Line 1)
December 31, 2021 (2021-12-31)[3] (Lines 6 and S1)
ClosedApril 18, 2020 (2020-04-18) (Line 1) (for renovation until late 2023[2])
Services
Preceding station Beijing Subway Following station
Jin'anqiao
Terminus
Line 6 Yangzhuang
towards Lucheng
Jin'anqiao
towards Shichang
Line S1 Terminus
Location
Pingguoyuan is located in Beijing
Pingguoyuan
Pingguoyuan[1]
Location in Beijing

Pingguoyuan station[1] (simplified Chinese: 苹果园站; traditional Chinese: 蘋果園站; pinyin: Píngguǒyuán zhàn) is a station on Line 1, Line 6 and Line S1 of the Beijing Subway, located in Pingguoyuan Subdistrict, Shijingshan District, Beijing.

The station for Line 1 was opened on April 23, 1973. Pingguoyuan station on Line 1 is closed for renovation from April 18, 2020 to late 2023.[2] The station for Line 6 and Line S1 was opened on December 31, 2021.

The Line 1 station and Line 6 station are underground, and the Line S1 station is elevated.

Station layout

Platform panorama of Line 1 Pingguoyuan station.

The line 1 of Pingguoyuan station has two underground side platforms and both are the only two platforms of Beijing Subway stations that haven't installed platform gates due to the aging of platform devices.

The station for Line 1 is closed for renovation, and the platform gates will be installed after the renovation is finished.[4]

Line 6 has an underground island platform and Line S1 has 2 elevated side platforms.

Exits

There are 4 exits, lettered A, B, C, and D. All exits have a stairlift.[5] These exits are temporarily closed due to the renovation of Line 1.

There are 6 other exits, lettered E, F, G, H, I and J. Currently exits E, F, H, I and J are operational. Exits F and G are accessible via elevators, whilst exit H has a stairlift.

Line 1

Line 6 & Line S1

References

  1. 1 2 3 "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2022-12-31.
  2. 1 2 3 "地铁1号线福寿岭站、苹果园站何时建成开通?". Archived from the original on 2022-03-19. Retrieved 2022-03-19. 且苹果园站是停运不停车,施工过程中还要确保地铁列车运行安全,所以施工进度有延迟。结构施工完成后还将进行机电设备、装修施工,预计在2023年底开通
  3. "市重大项目办到苹果园交通枢纽现场办公". 2019-11-20.
  4. "北京地铁1号线安全门全线投入使用". Beijing Municipal Commission of Transport. 2017-09-11. Archived from the original on 2017-09-12. Retrieved 2017-09-12.
  5. 1号线. Beijing Subway 北京地铁官方网站 (in Chinese). Archived from the original on 2020-04-05. Retrieved 2020-10-21.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.