Noida International Airport
Summary
Airport typePublic
OwnerNoida International Airport Limited (NIAL)
OperatorYamuna International Airport Private Limited (YIAPL)
(an SPE of Zurich Airport AG)
ServesNational Capital Region (NCR)
LocationJewar, Gautam Buddha Nagar District, Uttar Pradesh, India[1]
Opened30 September 2024 (2024-09-30) (expected)[2]
Coordinates28°10′12″N 077°36′36″E / 28.17000°N 77.61000°E / 28.17000; 77.61000
Websiteniairport.in
Map
DXN/VIND is located in Uttar Pradesh
DXN/VIND
DXN/VIND
Location of the airport in Uttar Pradesh
DXN/VIND is located in India
DXN/VIND
DXN/VIND
DXN/VIND (India)

Noida International Airport (IATA: DXN, ICAO: VIND), also known as Jewar Airport,[3][4][5][6] is an upcoming international airport being constructed near Jewar in Gautam Buddha Nagar District, Uttar Pradesh in India, which will serve the National Capital Region (NCR).[7] The airport is situated in the new planned YEIDA city.[8]

Once completed, it will be an alternative to Indira Gandhi International Airport in Delhi by relieving its high and rising traffic load, and is planned to be India's and Asia's largest airport. The Noida International Airport Limited (NIAL) will be the implementing agency on behalf of the Government of Uttar Pradesh. The airport is to be developed through a public-private partnership model (PPP). In 2019, Flughafen Zürich AG, the operator of Zurich Airport in Switzerland won the bid to build and operate the airport for 40 years.[9]

The National Highways Authority of India (NHAI) is also constructing a 31-kilometre long (19 mi) greenfield highway from the airport to Sector-65, Faridabad on Delhi–Mumbai Expressway. The proposed plan in Jewar is to build a two-runway airport by 2024, and at a future date, to expand it into a 7,200 acres (2,900 ha) eight-runway airport.[10] According to the plan, the airport will handle 1.2 crore (12 million) passengers per annum initially and up to 6-12 crore passengers per annum, after its expansion over a period of 30 years. It will be the third commercial airport in the National Capital Region, after Indira Gandhi International Airport and Hindon Airport.

History

The project was first proposed in 2001 by then Uttar Pradesh Chief Minister Rajnath Singh as a greenfield Taj International Aviation Hub (TIAH)[11] at Jewar near Greater Noida, adjacent to the Yamuna Expressway.[12] The Central Government cleared the techno-feasibility report for setting up TIAH in April 2003. It was to be built at an approximate cost of 5000 crores by the year 2007–2008. The project was put on hold during the UPA regime because the project site was within 150 km (93 mi) of an existing greenfield airport in Delhi.[13] This site was within 72 km (45 mi) of Indira Gandhi International Airport (IGI), Delhi. Its operator GMR Group had protested against plans for another international airport within 150 km (93 mi) of the existing Delhi Airport, claiming that it would impact traffic and revenue generation. GMR has the right of first refusal (RoFR) on a new airport within 150 km (93 mi) of the existing Delhi Airport. The RoFR was to ensure that GMR gets preference in bidding for the Greater Noida airport in case its bid price is within 10% of the lowest bidder.

When the Akhilesh Yadav-led government was formed in Uttar Pradesh in 2012, it contemplated shelving the project while proposing a new international airport in Agra. In June 2013, the State Government decided on the Kurrikupa village near Hirangaon, Tundla in the Firozabad district as the site for the proposed airport.[14][15] In January 2014, the Defence Ministry raised some objections regarding the site near Tundla.[16] The state government allocated land near Etmadpur for the proposed airport in November 2014.[17]

In 2014, the Bharatiya Janata Party (BJP) was voted to power at the federal level and the project was again shifted back to Jewar.[18] [11] The Civil Aviation Ministry cleared the proposal for the new airport to be set up on 2,200 acres (890 ha) of land in June 2015.[19] The Union Ministry of Defence (MoD) cleared the project in June 2016.[11] The Ministry of Civil Aviation (MoCA) gave an in-principle approval to the Uttar Pradesh government to build the airport in May 2018.[20] In July 2017, the Union Chief Secretary for Aviation warned the Uttar Pradesh government to expedite the planning process as Hisar Airport was also pushing for its competing Union Cabinet approval for building another airport to serve the NCR region, thus prolonging the return on investment for both airports due to a still-feasible-but-diluted viability for both.[21]

Location

The Noida International Airport (NIA) is located around 7 km (4.3 mi) north of Jewar Town in Gautam Buddh Nagar district of Uttar Pradesh in India. Noida, Dadri, and Jewar are the three tehsils (sub-divisions) in this district. In October 2017, for the first phase of building the airport, the Yamuna Expressway Industrial Development Authority (YEIDA) acquired land in villages such as Mukimpur Siwara, Dayanat Pur, Ramner, Kishorpur, Banwari Bas, Ranhera, Rohi, and Parohi.[22] Similarly in January 2021, YEIDA started taking possession of land for the phase-2 expansion in villages such as Ranhera, Shahpur Nangla, Birampur, Karauli Bangar, and Dayanat Pur (Jewar Tehsil).[23]

The project site is located 72 kilometres (45 mi) from Indira Gandhi International Airport (IGI), the airport that currently serves the needs of the entire Delhi NCR and is quickly reaching its peak capacity.[24] Jewar Airport is 36 km (22 mi) from Bulandshahr, 38 km (24 mi) from Palwal, 60 km (37 mi) from Noida and 70 km (43 mi) from Faridabad, Ghaziabad, and Mathura. It is about 40 km (25 mi) from Pari Chowk in Greater Noida, 65 km (40 mi) from Aligarh, 65 km (40 mi) from Gurgaon and 130 km (81 mi) from Agra. It will be connected to the Yamuna Expressway, allowing domestic and international tourists to reach Agra, Mathura, and Vrindavan.[25]

Connectivity

Alternate airports nearby

Under the National Capital Region Transport Plan, the Hisar International Airport[26] (190 km Northwest of IGI & 270 km Northwest of Noida International Airport)[27] is being developed as an alternate to the IGI Airport.

Road

The Noida International Airport (NIA) shall be connected with various highways in Delhi NCR like GhaziabadBulandshahrAligarh (NH-34) and Delhi–Ghaziabad–Meerut Expressway.

The NHAI is also constructing a 31-kilometre long (19 mi) highway which will connect Jewar Airport with Faridabad on Delhi–Mumbai Expressway.[28] The greenfield alignment is as follows (east to west):

Railway

Metro trains

  • Personal rapid transit (PRT) from amusement park to Noida International Airport is included in the proposed film city project, located in Greater Noida's Sector 21 to the airport.[31]

Semi-High Speed Railway

  • "Ghaziabad-Jewar RRTS", 71.1 km long rapid rail with 11 stations costing ₹16,000 cr, will be completed in 2 phases by 2031.[32]

  • "Palwal-Noida International Airport-Khurja Railway" (PNAKR line), 61 km long line will have a new railway station at Noida airport which will be connected to Palwal 28 km to west on New Delhi-Mumbai main line and Khurja 33 km to east on Howrah–Delhi main line (Amritsar-Kolkata line).[33]

  • "Noida International Airport-Chola Railway", 20 long line will connect multi logistics have at Noida airport to existing chola railway station to west on "Howrah–Delhi main line".[33]

High-Speed Railway

Construction

Construction work started in November 2021. At present, ATC, runway and terminal building work is under process.

Status updates

  • 2001: The project was first proposed in 2001 by the then Chief Minister of Uttar Pradesh, Rajnath Singh, as Taj International Aviation Hub (TIAH) in Jewar.
  • 2012: The project was shelved by the then Chief Minister of Uttar Pradesh, Akhilesh Yadav, in 2012, and he planned to build a new airport near Tundla, Firozabad District.
  • Aug 2018: The company called Noida International Airport Limited (NIAL) formed. NIAL will handle the bidding and overall project management of the project.[36]
  • Nov 2018: Government of Uttar Pradesh approves the allocation of ₹ 1,260 crores for land acquisition.[37]
  • Dec 2018: The airport will be built under the Public–Private Partnership (PPP) model.[38]
  • Dec 2018: The Gautam Buddha Nagar District Administration submitted the Rehabilitation and Resettlement (R&R) document on land acquisition.[39]
  • Jan 2019: Acquisition of 1,334 ha (3,300 acres) of land will start by late January.[40]
  • Feb 2019: In the Uttar Pradesh budget, the Government of Uttar Pradesh has allocated 800 crores for land acquisition to expedite the process. Foundation stone for the project to be laid in March 2019.[41]
  • Mar 2019: Due to land acquisition related issues, the foundation stone laying ceremony is deferred for a few months.[42]
  • Sep 2019: 707 ha (1,750 acres) of land is acquired, which is 57% of the total requirement of 1,239 ha (3,060 acres) for Phase-I of the project. The remaining land will be acquired soon, and the developer for Phase-I will be finalised by November 2019.[43]
  • Nov 2019: Contract given to Flughafen Zürich AG (Zurich Airport AG) for developing and operating the airport for 40 years.[44]
  • Jan 2020: Land acquisition completed for Phase-I of the project, which required 1,334 ha (3,300 acres), out of the total requirement of 5,000 ha (12,000 acres). Phase-I of the project will be completed by 2023.[45][46]
  • May 2020: Tender issued for the 760 m (2,490 ft) of road connecting the airport to the Yamuna Expressway. The construction time of this road is 3 months.[47]
  • Oct 2020: The final agreement signed between Noida International Airport Limited (NIAL) and Zurich Airport AG, where the latter will build, operate, and manage the airport, through its special-purpose vehicle (SPV), Yamuna International Airport Private Limited (YIAPL).[48]
  • Feb 2021: The master plan for the airport is approved by the Airports Authority of India (AAI).[49]
  • Jun 2021: Construction for the airport's Phase-I is expected to start by August 2021.
  • Jul 2021: The formal process of handing over 1,334 ha. of land for the project to NIAL on a 90-year lease was completed in the presence of the Chief Minister of Uttar Pradesh, Yogi Adityanath. A shareholder agreement was also signed between the airport developer company, Zurich Airport AG, YIAPL, and NIAL.[50]
  • Aug 2021: YIAPL and Zurich Airport AG start construction work for the main terminal and the boundary wall of the airport, as of 24 August. The deadline for completion of the terminal is set for September 2024.[51]
  • Sep 2021: Government of India approves the master plan for the airport.[52]
  • Nov 2021: Prime Minister Narendra Modi laid the foundation stone for the airport on 25 November.[53]
  • Apr 2022: Larsen & Toubro, Tata Projects Limited and Shapoorji Pallonji bid for the civil construction contract of the airport. The winning bidder will be selected on 28 April 2022.[54]
  • May 2022: Tata Projects Limited emerges as the lowest bidder for the civil construction contract for construction of the airport's terminal and other associated works, but the final contract is yet to be awarded.[55]
  • Jun 2022: Tata Projects Limited was awarded the civil construction contract by NIAL. The airport will be TPL's second airport project after Allahabad Airport.[56][57]
  • Jul 2022: Tender for 31 km (19 mi)-long spur package from Sector-65 Faridabad (on Delhi-Mumbai Expressway) to Dayanat Pur near the airport's site has been awarded by the National Highways Authority of India (NHAI).[58][59]
  • Aug 2022: The airport will be completed and will undergo testing in March 2024, while it will become operational for traffic in October 2024.[60]
  • Sep 2023: The airport was awarded the airport code "DXN" by the International Air Transport Association (IATA).[6]
  • Oct 2023: More than 50% of work has been completed on the airport.[61]

See also

References

  1. "UP govt revives Jewar airport project, survey to start today". Daily News Analysis. Retrieved 14 May 2017.
  2. "Noida International Airport: Greater Noida's Jewar Airport opening date revealed, luxury hotel, metro to be built". News. 16 January 2023. Retrieved 17 January 2023.
  3. "Uttar Pradesh CM Yogi Adityanath approves name, design, and logo of Jewar airport". The Times of India. 17 December 2020. Retrieved 17 December 2020.
  4. "Jewar airport to be called Noida International Greenfield Airport: Key features". India Today. 17 December 2020. Retrieved 17 December 2020.
  5. "6 runways, electronic city & more! UP govt makes Rs 2000 crore provision in the budget for Jewar airport expansion". The Financial Express. 23 February 2021. Retrieved 2 March 2021.
  6. 1 2 Sharma, Anu (27 September 2023). "Noida International Airport of Jewar launches DXN as IATA code". Mint. Retrieved 27 September 2023.
  7. "Jewar international airport: Inauguration of Jewar airport by end of December: Nandi". The Times of India. 31 October 2018. Retrieved 7 December 2019.
  8. Rajput, Vinod (9 October 2023). "Yeida expedites land acquisition for Noida airport's MRO hub". Hindustan Times. Retrieved 19 November 2023.
  9. "New Greenfield Noida International Airport at Jewar picking momentum- Progress Report". Press Information Bureau. 3 April 2018. Retrieved 11 May 2018.
  10. Sinha, Meenakshi. "With six runways, Jewar set to be India's largest airport". The Economic Times. Retrieved 2 December 2021.
  11. 1 2 3 "Noida: Three governments, countless proposals later, Jewar finally to get airport". Hindustan Times. 24 June 2017. Retrieved 10 May 2018.
  12. "New initiatives". Greater Noida Authority. Archived from the original on 19 December 2011.
  13. "Greater Noida's Jewar airport awaits nod from civil aviation ministry". The Times of India. 8 April 2017. Retrieved 10 May 2018.
  14. Umesh Raghuvanshi (21 June 2013). "UP to seek DGCA nod for Taj airport". Hindustan Times. Archived from the original on 2 April 2015. Retrieved 29 July 2015.
  15. "Hindustan Times e-Paper". paper.hindustantimes.com.
  16. "Taj international airport project hits MoD hurdle". The Indian Express. 11 January 2014. Retrieved 11 April 2021.
  17. "Land given for international airport near Agra: Akhilesh Yadav". Zee News. 8 November 2014. Retrieved 11 April 2021.
  18. "Jewar Bazar: Jewar's Local Search Engine".
  19. Srivastava, Anvit (26 June 2015). "Jewar to take wing as ministry clears second NCR airport". The Times of India. Retrieved 11 April 2021.
  20. "Noida International Airport project to be completed by 2022". Business Today. 9 May 2018. Retrieved 11 May 2018.
  21. "Aviation Secy Tells UP To Form Jewar Airport SPV, Yamuna Authority's Hands Full". Moneycontrol. 10 July 2017. Retrieved 11 April 2021.
  22. Keelor, Vandana (31 October 2017). "Eight villages marked for land acquisition in Jewar". The Times of India. Retrieved 6 August 2022.
  23. "UP set to take over seven villages for third Jewar airport runway". The Times of India. 30 January 2021. Retrieved 6 August 2022.
  24. "Explained: Why Delhi-NCR's second airport in Jewar town is significant". The Indian Express. 21 January 2020. Retrieved 23 July 2020.
  25. "Greater Noida Airport foundation stone to be laid by Oct: Govt". The Times of India. 3 April 2018. Retrieved 11 May 2018.
  26. "International airport at Hisar, Haryana to give breather to IGI airport in Delhi? See what CM said". Zee Business. IANS. 29 October 2019. Retrieved 17 December 2023.
  27. "New Greenfield Noida International Airport at Jewar picking momentum- Progress Report". Press Information Bureau. 3 April 2018. Retrieved 11 May 2018.
  28. "Delhi-Mumbai expressway will be linked to Jewar airport". The Times of India. 8 July 2022. Retrieved 6 August 2022.
  29. Rajput, Vinod (3 September 2021). "Metro corridor to link Capital, Jewar airport". Hindustan Times. Retrieved 17 December 2023.
  30. Shalabh (9 April 2021). "Greater Noida to Jewar airport in less than 25 minutes? DMRC to ready plan". The Times of India. Retrieved 7 September 2021.
  31. "Driverless pod car between Jewar airport & amusement park in Film City: Plan details". The Times of India. 7 September 2021. Retrieved 7 September 2021.
  32. सिंह, धीरेंद्र (6 December 2023). "71.1 किमी, 11 स्टेशन, गाजियाबाद से एयरपोर्ट वाया कासना कैसे जाएगी रैपिड रेल, समझिए पूरा रूट". Navbharat Times (in Hindi). Retrieved 8 December 2023.
  33. 1 2 Arora, Nitin (7 December 2023). "Noida International Airport: नोएडा एयरपोर्ट को लेकर नया अपडेट, जेवर को इन दो रेलवे स्टेशनों से जोड़ा जाएगा". Zee News Hindi (in Hindi). Retrieved 8 December 2023.
  34. "Haryana CM Khattar greenlights rail link between IGI & Hisar airport". Hindustan Times. 12 April 2023. Retrieved 17 December 2023.
  35. Bhandari, Shashwat (11 November 2020). "Delhi Varanasi bullet train station Jewar Airport Noida international greenfield airport". India TV News. Retrieved 7 September 2021.
  36. Sinha, Meenakshi (9 December 2018). "10-member government panel to be part of Jewar airport agency". The Times of India. Retrieved 26 January 2021.
  37. "UP Government Approves Rs 1,260 Crore For Jewar Airport Land Acquisition". NDTV.com. 23 November 2018. Retrieved 26 January 2021.
  38. "Jewar airport to be built on public-private-partnership mode". NewsroomPost. 9 December 2018. Retrieved 26 January 2021.
  39. Alam, Shafaque (29 December 2018). "Rehab plan of landlosers for Jewar airport ready". The Times of India. Retrieved 26 January 2021.
  40. Alam, Shafaque (12 January 2019). "Land acquisition for Jewar airport to start by January-end". The Times of India. Retrieved 26 January 2021.
  41. Prasad, Nikita (28 February 2019). "Jewar International Airport: How UP government is clearing land acquisition hurdles". The Financial Express. Retrieved 9 March 2019.
  42. "पीएम आज आ रहे हैं ग्रेटर नोएडा, जानिए- क्यों नहीं करेंगे जेवर एयरपोर्ट का शिलान्यास". Dainik Jagran (in Hindi). 9 March 2019. Retrieved 9 March 2019.
  43. "Admin takes over 57% land needed for Jewar airport project". Hindustan Times. 5 September 2019. Retrieved 6 September 2019.
  44. "Zurich Airports win bid to build, operate Jewar airport for 40 years". The Economic Times. 29 November 2019. Retrieved 29 November 2019.
  45. "Land For Jewar Airport Phase One Acquired After Villagers Clash With Officials". NDTV.com. 28 January 2020. Retrieved 29 January 2020.
  46. "Jewar Airport's land acquisition done, some farmers protest". Times Now News. 29 January 2020. Retrieved 29 January 2020.
  47. "Greater Noida: Yeida to build the road to link Jewar airport site with Yamuna Expressway". Hindustan Times. 30 May 2020. Retrieved 30 May 2020.
  48. "UP, Zurich set to sign final Jewar airport deal on October 7". The Times of India. 30 September 2020. Retrieved 30 September 2020.
  49. Sinha, Snehil (10 February 2021). "AAI reviews Jewar airport plan, gives nod". The Times of India. Retrieved 10 February 2021.
  50. "Why is Yogi pushing for more airports in UP?". India Today. Retrieved 5 September 2021.
  51. "Noida: Construction work begins at international airport site in Jewar". Hindustan Times. 23 August 2021. Retrieved 5 September 2021.
  52. "After Centre, NIAL Board approves Noida International Airport master plan". Business Standard India. Press Trust of India. 13 August 2021. Retrieved 5 September 2021.
  53. "Noida International Airport live updates: PM Modi lays foundation stone for Jewar Airport". The Times of India. Retrieved 25 November 2021.
  54. "L&T, Tata & SP Bid for Jewar Noida Airport's Construction Contract". The Metro Rail Guy. 10 April 2022. Retrieved 10 April 2022.
  55. "Tata Wins Jewar Noida Airport's Construction Contract". The Metro Rail Guy. 7 May 2022. Retrieved 7 May 2022.
  56. "tata projects: Tata Projects bags contract to build Noida International Airport". The Times of India. 4 June 2022. Retrieved 5 June 2022.
  57. Mukul, Prabnav (3 June 2022). "Tata Projects to construct Noida International Airport". The Indian Express. Retrieved 5 June 2022.
  58. "Tender opens for e-way to link Faridabad, Jewar airport". Tribune. 31 July 2022. Retrieved 6 August 2022.
  59. मिश्र, दिनेश; ऐश्वर्य कुमार, राय (31 July 2022). "Noida Airport: 2 साल में दिल्ली-मुंबई एक्सप्रेसवे से जुड़ेगा जेवर एयरपोर्ट, 6 लेन पर खर्च होंगे 16.5 अरब, NHAI ने निकाला टेंडर". Navbharat Times (in Hindi). Retrieved 6 August 2022.
  60. "Jewar airport to be ready by Oct 2024". Hindustan Times. 4 August 2022. Retrieved 6 August 2022.
  61. Mishra, Dheeraj (1 October 2023). "Upcoming Noida Airport in Jewar over halfway mark: Here are the details of the mega project". The Indian Express. Retrieved 1 October 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.