Zhangjiajie–Jishou–Huaihua high-speed railway | |
---|---|
Overview | |
Native name | 张吉怀高速铁路 |
Status | Operational |
Termini | |
Stations | 7 |
Service | |
Type | Heavy rail |
History | |
Opened | 6 December 2021[1] |
Technical | |
Line length | 246.9 km (153.4 mi)[1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 50 Hz 25,000 V |
Operating speed | 350 km/h (217 mph) |
The Zhangjiajie–Jishou–Huaihua high-speed railway is a high-speed railway in China. It is 246.9 kilometres (153.4 mi) long[1] and have a design speed of 350 kilometres per hour (220 mph).[2] The line runs parallel to the Jiaozuo–Liuzhou railway, but on a faster alignment. It was opened on 6 December 2021.[1]
History
Construction began on 18 December 2016.[2] It was opened on 6 December 2021.[1]
Stations
The line has the following stations:[1]
- Zhangjiajie West
- Furongzhen
- Guzhang West
- Jishou East
- Fenghuanggucheng (interchange to Fenghuang Maglev)
- Mayang West
- Huaihua South
References
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.