Guangzhou–Shenzhen railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other name(s) | Guangshen railway Kowloon–Canton railway (Chinese section) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | 广深铁路 广深线 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | China Railway Guangzhou Group | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line number | 4 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 22 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Higher-speed rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | China Railway Guangzhou Group Guangshen Railway Company | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | CRH1A EMU (Guangshen intercity train),
CRH1A-A EMU (e.g. Guangzhou East to Xiamen EMU service), CRH1E-250 EMU (e.g. Guangzhou East to Ganzhou West EMU train service), CRH2A EMU (e.g. Nanchang West to Guangzhou East EMU train service via Shenzhen city and Dongguan), CRH380A EMU (e.g. Guangzhou East to Ganzhou West EMU train service via Dongguan) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 8 October 1911 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 147 km (91 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 25 kV 50 Hz AC (Overhead line) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 180 km/h (110 mph) (tracks 1 and 2) 140 km/h (87 mph) (tracks 3 and 4) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Signalling | Centralized CTCS Automatic closing block system (UM-70, ZPW-2000) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Guangshen Railway | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 广深铁路 | ||||||||||||||
Traditional Chinese | 廣深鐵路 | ||||||||||||||
| |||||||||||||||
Kowloon–Canton railway, Chinese section | |||||||||||||||
Simplified Chinese | 广九铁路华段 | ||||||||||||||
Traditional Chinese | 廣九鐵路華段 | ||||||||||||||
|
Guangshen railway or Guangzhou–Shenzhen railway (Chinese: 广深铁路 or 广深线), also known as the Chinese section of the Kowloon–Canton railway (廣九鐵路華段) in 1911–1949, is a railway in Guangdong province in the People's Republic of China, between Guangzhou and Shenzhen. It is operated by Guangshen Railway Co., Ltd., a publicly traded company.
With a length of 147 kilometres (91 mi), it was the first railway in the People's Republic of China to reach the speed of 220 km/h (137 mph) in some sections, though it is limited to about 180 km/h (112 mph) during commercial operation. Now it has four tracks between Guangzhou East and Shenzhen railway station. Line 1 and 2 are up-direction and down-direction 200 km/h (124 mph) (currently restricted to 180 km/h (112 mph) in operation) passenger lines for CRH EMU respectively, and Lines 3 and 4 are up-direction and down-direction 160 km/h (99 mph) (currently restricted to 140 km/h (87 mph) in operation) mixed passenger and freight line respectively. In order to reduce the interference to passenger trains in the daytime from lower-speed freight trains, most freight trains will be scheduled to run at night.
Guangshen railway connects with several other important railways to different directions. It links Jingguang railway and Guangmao railway in Guangzhou, Jingjiu railway in Dongguan (with which shares two regular speed track), and the East Rail line to Hong Kong at the southern end of the railway. Besides, there are some branch lines along Guangshen Railway, such as Pingyan railway to Yantian Port, Pingnan railway to Shenzhen West railway station and also the line to Huangbu Port.
Cross-border services, from Hong Kong to Dongguan (Changping), Guangzhou East, Foshan and Zhaoqing, as well as to Beijing West and Shanghai use its route. However, this service was suspended since the manifestation of COVID-19 pandemic.
History
The idea of constructing a railway linking Canton (now Guangzhou) and Kowloon in Hong Kong, a British crown colony germinated in the late Qing dynasty. In 1899, Britain and the Qing government agreed to construct the KCR British Section, but Britain postponed the construction as Britain was busy at the Second Boer War in Africa. In 1907, Qing government and Britain formally signed an agreement in Peking on issuing a £100-million bond as part of loan for the construction of the Chinese section of the Kowloon–Canton railway. In July 1907, construction of the British Section of the KCR began. The construction of Chinese section was delayed and only started in 1909. Under the loan contract, China needed to employ the British engineers for the construction of Chinese section, but China still employed famous Chinese railway engineer, Zhan Tianyou, as a consultant. On 8 October 1911, the Chinese section of KCR with total length of 142.77 km (88.71 mi) was opened.[1] The northern end of railway at that time was located in Dashatou (大沙頭), Guangzhou, was demolished in 1951. The through train service between Kowloon and Guangzhou also started to operate at the same time.
After the establishment of People's Republic of China in October 1949, the 'Chinese section of the Canton–Kowloon railway' was renamed 'Guangshen railway', and repairs were made to sections of the railroad damaged during the war. In 1967, railway department carried out a comprehensive maintenance on Guangshen railway to improve the transport capacity. Beginning in the 1980s economic reform policies of China, the establishment of Shenzhen Special Economic Zone and rapid economic development in the Pearl River Delta region has brought large volume of imported goods and increased passenger demand to the railway. Therefore, the second line of Guangshen Railway was constructed during 1984 to 1987 in order to meet the huge demand. Simultaneously Guangshen Railway Company (the predecessor of Guangshen Railway Company), which was directly subordinated to the Guangzhou Railway Bureau (now Guangzhou Railway Group), was established. This company was in charge of the construction projects and operational management of Guangshen Railway. In 1987, Guangshen railway became the first double-track railway in Guangdong province.
Guangshen railway is the first place in China to carry out successfully speed-up on the existing railroad. At the beginning of the 1990s, Guangzhou Railway Bureau and the Ministry of Railways carried out the pre-feasibility research about raising the maximum speed of passenger trains to 160 km/h (99 mph). At 28 December 1991, the construction of the third line of Guangshen railway, and the speed-up improvement works of original double tracks started. In October 1994, the maximum speed of a train reached 174 km/h (108 mph) during the test. At 22 December 1994, the first sub-high speed (160 km/h (99 mph)) passenger train in China started commercial operation between Guangzhou and Shenzhen.
In 1998, the electrification of two sub-high speed lines of Guangshen railway was finished. After the improvement the 200 km/h (124 mph) high speed trains are allowed to run on the existing subhigh speed railroad. A Swedish-built X 2000 tilting train called 'Xinshisu' began to serve intercity train service between Guangzhou and Shenzhen, as well as the through train to Hong Kong. The train are 165m long, consisting of a power car, five passenger cars, and a trailing car. The non-power cars can have a pitch of up to 8 degrees. They are noted for being very quiet (less than 65 dBA) even at 200 km/h (124 mph).
Construction of the fourth track was commenced at 31 December 2005, and was finished at 18 April 2007 in time for the Sixth Speed-Up Campaign. Since then Guangshen railway has been the first four-track railway in mainland China and it allows passenger trains and freight trains to run on separate lines.
Guangshen intercity trains
As of 2007, intercity train service between Guangzhou and Shenzhen uses 8-car CRH1A highspeed EMU. There are 100 pairs of trains operated daily, in which 98 pairs will stop for 1.5 minutes at three stations: Zhangmutou, Dongguan and Shilong. On the 'As-frequent-as-buses' basis, one pair of trains is dispatched every 5 minutes on average during peak hours. The fastest journey time is 52 minutes between Guangzhou East and Shenzhen for D7002 and D7008 with no stop.
Rolling stock
Time | Rolling stocks using by Guangshen intercity trains |
---|---|
Before 1966 | SL6 steam locomotive hauling 21 Series / 22 Series railway carriages |
1966–mid-1970s | SL6 steam locomotive / Dongfanghong1 / DF diesel locomotive (from 1972) hauling 21 Series / 22 Series railway carriage Dongfanghong1 / DF diesel locomotive(from 1972) hauling 24 Series railway carriages with air-conditioning (91/92 Express) |
1970s–late 1994 | Locomotives: DF3 / ND2 / DF4B (from 1985) / DF9 diesel locomotive(from 1990s) Passenger coaches: 24 Series with air-conditioning / 25 Series / 22 Series / 22 Series railway carriages with air-conditioning |
Late 1994–1998 | Locomotives:DF4B / DF9 / DF11 diesel locomotive Passenger coaches:22 Series / Double-deck 25B Series with air-conditioning / 25Z Series |
1998–2004 | DF4B diesel locomotive hauling 22 Series / Double-deck 25B Series with air-conditioning / SS8 electric locomotive / DF11 diesel locomotive hauling 25Z Series / 25C Series railway carriage DDJ1 EMU(1999–2000) Xianfenghao EMU(2001) X2000 tilting train DJJ1 EMU (Blue Arrow)(from 2001) |
2004–2006 | DF4B diesel locomotive hauling Double-deck 25B Series with air-conditioning / SS8 electric locomotive / DF11 diesel locomotive hauling 25Z Series / 25C Series railway carriage X2000 tilting train / DJJ1 EMU (Blue Arrow) |
2007– | DF11 diesel locomotive hauling 25Z Series railway carriage (Until 25 April 2007) DF4B diesel locomotive hauling Double-deck 25B Series with air-conditioning (Until 30 June 2007) DJJ1 EMU (Blue Arrow) (Until 25 April 2007) CRH1A EMU (from 1 February 2007) CR200J (from year 2023) |
Stations
Stations with services
Most of the stations on the line are now abandoned for passenger service. Currently, the only stations on the line offering passengers service are, in order:
Station No. |
Station Name | Chinese | Distance km |
PRD MIR (CR C-train) transfers/connections |
Metro transfers/connections |
Location | ||||
---|---|---|---|---|---|---|---|---|---|---|
GZQ | Guangzhou | 广州 | 0 | 0 | GFZ * GQ | 2 5 | Yuexiu | Guangzhou | ||
GGQ | Guangzhou East Guangzhoudong |
广州东 | 8 | 8 | SS * | 1 3 | Tianhe | |||
RTQ | Dongguan | 东莞 | 64 | 72 | 2 | Shilong | Dongguan | |||
DAQ | Changping | 常平 | 18 | 90 | Changping | |||||
ZOQ | Zhangmutou | 樟木头 | 13 | 103 | Zhangmutou | |||||
PHQ | Pinghu | 平湖 | 24 | 127 | 10 | Longgang | Shenzhen | |||
BJQ | Shenzhen East Shenzhendong |
深圳东 | 12 | 139 | 3 5 | |||||
SZQ | Shenzhen | 深圳 | 8 | 147 |
|
Luohu | ||||
All existing stations
Existing stations | ||||||||
---|---|---|---|---|---|---|---|---|
Station Name English |
Station Name Chinese |
Total Distance |
Transfer | Location | Grade | Notes | ||
● | ● | Guangzhou | 广州 | 0 | 2 5 |
Yuexiu, Guangzhou | T [note 1] |
The departure station for minor Guangzhou – Shenzhen intercity trains (CRH) |
| | | | 云麓 | 4 | 4 | Not for passenger service. Decommissioned in 2009. | |||
● | ● | Guangzhou East | 广州东 | 8 | 1 3 |
Tianhe, Guangzhou | 1 | The stop and departure station for all Guangzhou–Shenzhen intercity trains (CRH) |
| | ● | Shipai | 石牌 | 14 | 4 | Not for passenger service. | ||
| | | | Huangpu | 黄埔 | 18 | 2 | Not for passenger service. | ||
| | | | 九运会 | Decommissioned in 2002. | |||||
| | ● | Jishan | 吉山 | 20 | 3 | Not for passenger service. | ||
● | ● | Xiayuan | 下元 | 27 | Huangpu, Guangzhou | 3 | Not for passenger service. | |
| | | | 南岗 | 32 | 4 | Decommissioned in 2009. | |||
| | ● | Xintang | 新塘 | 39 | Zengcheng, Guangzhou | 4 | Not for passenger service. | |
| | | | 沙浦 | 45 | 5 | Decommissioned in 2007. | |||
| | | | 塘美 | 4 | Decommissioned in 2007. | ||||
● | ● | Xiancun | 仙村 | 51 | 4 | Not for passenger service. | ||
| | | | 石滩 | 60 | 4 | Decommissioned in 2009. | |||
| | | | 红海 | 64 | 4 | Not for passenger service. Decommissioned in 2006. | |||
| | | | 石龙 | 69 | Shilong, Dongguan | 3 | Decommissioned in 2014. | ||
● | ● | Dongguan | 东莞 | 72 | 2 |
2 | Stopping station for all Guangzhou–Shenzhen intercity trains (CRH) | |
| | ● | Chashan | 茶山 | 75 | Chashan, Dongguan | 4 | Not for passenger service. | |
| | | | 南社 | 78 | 4 | Decommissioned in 2007. | |||
| | | | 横沥 | 84 | Hengli, Dongguan | 4 | Decommissioned in 2009. | ||
● | ● | Changping | 常平 | 90 | Changping, Dongguan | 2 | Stopping station for all Guangzhou–Shenzhen intercity trains (CRH) | |
| | | | 土塘 | 94 | 5 | Decommissioned | |||
● | ● | Zhangmutou | 樟木头 | 103 | Zhangmutou, Dongguan | 3 | Stopping station for all Guangzhou–Shenzhen intercity trains (CRH) | |
| | | | 林村 | Tangxia, Dongguan | 4 | Decommissioned in 2010. | |||
● | ● | Tangtouxia | 塘头厦 | 114 | 4 | Not for passenger service. | ||
| | | | 石鼓 | 119 | 4 | Decommissioned in 2007. | |||
| | | | 天堂围 | 122 | Fenggang, Dongguan | 4 | Decommissioned in 2007. | ||
● | ● | Pinghu | 平湖 | 127 | 10 |
Longgang, Shenzhen | 4 | Stopping station for some Guangzhou–Shenzhen intercity trains (CRH) |
| | ● | Pinghu South | 平湖南 | 131 | Not for passenger service. | |||
| | | | 李朗 | 4 | Decommissioned in 2007. | ||||
● | ● | Shenzhen East | 深圳东 | 139 | 35 |
3 | Departure station for some non-high-speed trains. Intercity trains do not stop here. | |
● | ● | Sungang | 笋岗 | 144 | Luohu, Shenzhen | 1 | Not for passenger service. | |
● | ● | Shenzhen | 深圳 | 147 | 1 9 |
1 | The departure station for all Guangzhou–Shenzhen intercity trains (CRH) | |
↓ Through-service to/from Hung Hom (Kowloon) via East Rail line ↓ | ||||||||
Cross-Line Traffic
There are services of EMUs using Guangzhou–Shenzhen railway as part of the route. Daily trains are offered between Guangzhou East Railway Station and Chaoshan Railway Station, a few of them will continue to Shantou Railway Station; in addition, starting from 1 July 2018, one departure serving the Guangzhou East to Chaoshan service will continue to Xiamen, and vice versa; these service are still available according to the railway timetable with effective from 11 October 2023.
Starting 10 July 2019 to 10 October 2023, there was a daily service between Shenzhen Railway Station and Huaiji Railway Station on Guiyang-Guangzhou HSR,[2] which is the first utilizing the whole Guangzhou-Shenzhen line in full as part of the route; however, according to the new railway timetable effective from 11 October 2023, such direct train service no longer exist.
Since not later than 26 June 2021, more EMU trains are available for service between Xiamen (or Xiamen North Station) and Guangzhou, at which two of them (using Xiamen North Station at the time of writing in June 2023) will continue to Nanning East Station.[3][4] CRH2A EMU trains are in use for service between Xiamen North and Nanning.[5] However, with effective from 11 October 2023 the captioned trains, formerly from Fujian heading to Guangxi province, are shorten to serve only between Fujian province and Guangzhou city.
Since 15 January 2022, train departures are available between Guangzhou East station and Ganzhou West railway station, with a pair of departures using CRH380A EMU trains,[7] at which train G2775/G2778 departs from Guangzhou East station, and train G2777/G2776 departs from Ganzhou West station, as at June 2023 this service serves Dongguan station as well; in addition, another pair for the Guangzhou East to Ganzhou West service was added since 11 October 2022, with train number D1695/D1698 and D1697/D1696, [8] at which CRH1E-250 train is in use as at June 2023.
For CRH2A EMU trains running on the entire Guangzhou-Shenzhen line fully, since not later than year 2023, EMU train service is previously available between Shenzhen Station (the one near the Hong Kong border) and Liuzhou via Guangzhou, at which CRH2A EMU train is in use for this daily service (numbered D3665/D3666); however, with effective from 11 October 2023, train number D3665/D3666 no longer serves Shenzhen and Dongguan, and for Guangzhou the train stops at Guangzhou South Station instead.
Image gallery
- Bond agreement signed in 1907
- Foundation ceremony of the Chinese Section of KCR in 1909. Group photo of both Chinese and British officials.
See also
References
- ↑ "Canton-Kowloon Chinese Railway 5% Loan – 1938". Archived from the original on 1 December 2008. Retrieved 23 June 2009.
- ↑ "深圳站7月将开行第一对跨线动车组列车(深圳到肇庆怀集) – 深圳本地宝". jt.sz.bendibao.com. Retrieved 18 August 2019.
- ↑ "实现高铁直连!南宁至厦门、福州高铁动车开跑!". www.gxnews.com.cn. Retrieved 28 June 2023.
- ↑ "6月25日起全國鐵路實施新列車運行圖 新增南寧至廈門直通動車". gx.people.com.cn. Retrieved 28 June 2023.
- ↑ "6月25日起全國鐵路實施新列車運行圖 新增南寧至廈門直通動車". gx.people.com.cn. Retrieved 28 June 2023.
- ↑ "6月25日起全國鐵路實施新列車運行圖 新增南寧至廈門直通動車". gx.people.com.cn. Retrieved 28 June 2023.
- ↑ "高铁首次开进广州市中心车站 正式步入高铁时代". m.lwgcw.com. Retrieved 12 July 2023.
- ↑ "廣鐵集團實施新的列車運行圖". hn.people.com.cn. Retrieved 12 July 2023.