Hebbagodi
Namma Metro station
General information
LocationVeer Sandra, Hebbagodi, Bommasandra, Karnataka 560099
Coordinates12°49′45″N 77°40′53″E / 12.82909°N 77.68133°E / 12.82909; 77.68133
Owned byNamma Metro
Operated byBangalore Metro Rail Corporation Ltd (BMRCL)
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Central Silk Board / Rashtreeya Vidyalaya Road
Platform-2 → Bommasandra
Platform numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningMay 2024 (May 2024) (TBC)
Electrified750 V DC third rail (TBC)
Services
Preceding station Namma Metro Following station
Huskur Road Yellow Line
(Operational post May '24)
Bommasandra
Terminus
Location

Hebbagodi is an upcoming elevated metro station on the Yellow Line of the Namma Metro serving the Hebbagodi neighbourhood with the Police Station, BioCon Campus in this area. To the north it leads to Kammasandra, a neighbourhood next to Veer Sandra (Bengaluru). To the south, it leads to Bommasandra, Attibele and Hosur, an industrial city in Tamil Nadu. This will also be the depot for all the Yellow Line Namma Metro trains for maintenance purposes. As per latest reports, this metro station is stated to be operational post May 2024 due to the upcoming Indian general election which will occur during April-May 2024.[1][2][3][4]

Station layout

Station Layout (TBC)

Hebbagodi track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Bommasandra
Platform 1
Northbound
Towards ← Central Silk Board / Rashtreeya Vidyalaya Road next station is Huskur Road
Side platform | Doors will open on the left Disabled access
L2

Entry/Exit

See also

References

  1. DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 2023-12-14.
  2. "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 2023-11-11.
  3. "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 2023-10-21. ISSN 0971-8257. Retrieved 2023-11-11.
  4. "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 2023-10-06. Retrieved 2023-11-11.
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.