Huskur Road
Namma Metro station
General information
Other namesVeerasandra
LocationVeer Sandra, Electronic City, Bengaluru, Karnataka 560100
Coordinates12°50′20″N 77°40′39″E / 12.83901°N 77.67754°E / 12.83901; 77.67754
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Central Silk Board / Rashtreeya Vidyalaya Road
Platform-2 → Bommasandra
Platform numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningMay 2024 (May 2024) (TBC)
Electrified750 V DC third rail (TBC)
Services
Preceding station Namma Metro Following station
Electronic City Yellow Line
(Operational post May '24)
Hebbagodi
towards Bommasandra
Location

Huskur Road (also known as Veerasandra) is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India. Around this metro station holds the M5 E-City Shopping Complex, D-Mart E-City, E-City Toll Gate towards Attibele and Veerasandra Lake in South Bengaluru. As per latest reports, this metro station is stated to be operational post May 2024 due to the upcoming Indian general election which will occur during April-May 2024.[1][2][3][4]

Station layout

Station Layout (TBC)

Huskur Road track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Bommasandra next station is Hebbagodi
Platform 1
Northbound
Towards ← Central Silk Board / Rashtreeya Vidyalaya Road next station is Electronic City
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

See also

References

  1. DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
  2. "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
  3. "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 21 October 2023. ISSN 0971-8257. Retrieved 11 November 2023.
  4. "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 6 October 2023. Retrieved 11 November 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.