This is a list of megaprojects, which may be defined as:

  • Projects that cost more than US$1 billion and attract a large amount of public attention because of substantial impacts on communities, the natural and built environment, and budgets.
  • Projects with "initiatives that are physical, very expensive, and public".[1]

Some examples include bridges, tunnels, highways, railways, hospitals, airports, seaports, power plants, dams, wastewater projects, Special Economic Zones (SEZ), oil and natural gas extraction projects, public buildings, information technology systems, aerospace projects, and weapons systems. This list identifies a wide variety of examples of major historic and contemporary projects that meet one or both megaproject criteria identified above.

Legend

Terms used in the Status columnStatus color
Proposed
In Planning, Approved, Under/In Development, Under Construction, Re-Construction In Progress, Nearly Complete
On Hold
Abandoned, Cancelled
Completed

Aerospace projects

ProjectCompaniesLocationProposal yearStatusEnd yearCostNotesRef
Airbus A380Airbus2003Completed2021$25 billion USDA double-deck, wide-body, four-engine jet airliner.
Antonov An-225Antonov1988CompletedThis was the longest and heaviest aircraft in service until it was destroyed during the 2022 Russian-Ukrainian conflict. Only one unit was ever completed.
Boeing B-29 SuperfortressBoeingUnited States1943Completed1946$3 billion USDThe first nuclear bomber, which cost 50% more than the development of the bombs in the Manhattan Project.
Boeing B-52 StratofortressBoeingUnited States1952Completed1963With six decades of service as a strategic nuclear bomber, it is one of the largest military aircraft ever built. Every other bomber produced in the US after the B-52 have been megaprojects; however, it has not been replaced nor will it be in the foreseeable future.
Boeing 2707 and Lockheed L-2000 supersonic aircraftLockheed, Boeing, US Department of DefenseUnited States1963Cancelled1971Initiated in 1963 via a US government-funded competition to build the United States' first Supersonic Transport (SST), prototypes never built, ultimately canceled due to political, environmental and economic reasons in 1971.
Boeing 747Boeing1970Completed2023A wide-body commercial airliner first produced in 1970, often referred to by the nickname Jumbo Jet, is among the world's most recognizable aircraft with uses for long-distance passenger transport, cargo, the US President's official shuttle plane, and as NASA's Shuttle Carrier Aircraft.[2][3]
Boeing 787BoeingUnited States2007CompletedOngoingMade with local and globally sourced parts; the first major aircraft to be made largely out of composite materials.[4]
ConcordeAérospatiale, British Aircraft CorporationUnited Kingdom, France1965Completed1979A product of an Anglo-French government treaty, the supersonic passenger airliner Concorde entered service in 1976 and continued commercial flights for twenty-seven years.
Convair B-58 HustlerConvairUnited States1960Completed1970An all-weather, high altitude supersonic bomber with a fixed delta wing and 4 engines. The Hustler was operational from 1960 to 1970 in the US Air Force's Strategic Air Command for the deployment of up to 5 gravity nuclear weapons.
Lockheed C-5 GalaxyLockheedUnited StatesCompletedOver $1 millionThe largest and heaviest aircraft of any kind for over a decade (1970 to 1982). This military cargo plane was the first development program with a billion dollar cost overrun.[5][6]
F-22 RaptorLockheed MartinUnited States1996Completed2011A single seat, twin-engine fifth-generation fighter that uses stealth technology.
F-35 Lightning IILockheed MartinUnited States2006CompletedOngoingA single seat, single engine, all-weather stealth multirole combat aircraft that is intended to perform both air superiority and strike missions.
Sukhoi Su-57/HAL FGFASukhoi, Hindustan Aeronautics LimitedRussia/IndiaCompletedTwo variants of fifth-generation stealth fighters jointly developed for the Russian and Indian Air Forces.
Northrop Grumman B-2 SpiritNorthrop GrummanUnited States1987Completed2000A US heavy bomber with "low observable" stealth. Total program cost including development, engineering, and testing averaged $2.1 billion per aircraft in 1997.[7]
KH-11LockheedUnited States1976Completed1990Reconnaissance satellite.
Rockwell B-1 LancerRockwell InternationalUnited States1980sCompletedA supersonic bomber with a variable-sweep wing built in the 1980s as a strategic bomber. It has since acquired conventional and multi-role capabilities.
Tupolev Tu-144TupolevSoviet Union1968CompletedThe first supersonic transport aircraft. First flown on 31 Dec 1968; entered service on 26 Dec 1975.
Tupolev Tu-160TupolevSoviet UnionCompletedThe world's largest and heaviest combat aircraft, the world's largest supersonic aircraft, and the largest variable-sweep aircraft ever built.

Disaster cleanup

While most megaprojects are planned and undertaken with careful forethought, some are undertaken out of necessity after a natural disaster occurs. There have also been a few human-made disasters. Major restoration was necessary after the destruction caused by World War I and II, some of which was paid for by German reparations for World War I and for World War II.

ProjectLocationDisasterDisaster yearStatusCompletion yearCostNotesRef
Great Mississippi Flood reliefMississippi Delta regionGreat Mississippi Flood of 19271927completed$246 million to $1 billion$4.2–$17.3 billion in 2023 dollars[8]
Mount St. Helens eruption cleanupWashington state, USA1980 eruption of Mount St. Helens1980$1.1 billion[9]
Chernobyl New Safe ConfinementChernobyl, UkraineChernobyl disaster1986Completed2019€2.15 billionThe New Safe Confinement accounts for €1.5 billion, with the remainder going to related remedial work and maintenance.[10][11]
Exxon Valdez oil spillPrince William SoundExxon Valdez oil spill1989Over $2 billion[12]
Northridge earthquake disaster reliefLos Angeles, USA1994 Northridge earthquake1994$13-50 billion
AZF chemical factory explosion cleanupToulouse, FranceToulouse chemical factory explosion2001€2 billion[12][13]
Humanitarian response to the 2004 Indian Ocean earthquakeIndian Ocean coastline areas2004 Indian Ocean earthquake and tsunami2004$6.25 billion USD[14]
Hurricane Katrina disaster reliefAtlantic basin countriesHurricane Katrina2005$190 billion [15]
Deepwater Horizon cleanupGulf of MexicoDeepwater Horizon oil spill2010$65 billion[12][16]
Fukushima disaster cleanupFukushima, JapanFukushima Daiichi nuclear disaster2011Ongoing$187 billion USDCost includes compensation, decontamination, interim storage, and decommissioning of reactors.[17]
Tōhoku earthquake and tsunami disaster reliefPacific Rim2011 Tōhoku earthquake and tsunami2011$360 billion USDCost includes Fukushima disaster cleanup and economic losses.[18][19]

Energy projects

ProjectLocationCapacity
(MW)
Start yearStatusCompletion yearCostNotesRef
Australia-Asia Power LinkNorthern Territory, AustraliaProposed$30 billion AUD (est.)Electricity infrastructure project planned to include the world's largest solar plant, the world's largest battery, and the world's longest submarine power cable.
Bhadla Solar ParkRajasthan, India2,245Completed2020One of the world's largest photovoltaic power stations.[20][21][22]
Benban Solar ParkEgypt1,500Completed2019
Bataan Nuclear Power PlantMorong, Bataan, PhilippinesCompleted1984Over $2.3 billion USDThe plant never opened due to political change and safety issues, and its planned reactivation has become the focal point of the Anti-nuclear movement in the Philippines.[23][24][25][26][27][28]
Boundary Dam Power StationSaskatchewan, Canada5311959Completed$1.5 billion CADThe world's first large-scale, coal-fired carbon capture and storage plant[29]
Genesis Solar Energy ProjectBlythe, California, USA250Completed2014One of the largest operational solar thermal power stations.
Ivanpah Solar Power FacilityMojave Desert, California, USA392CompletedOne of the largest operational solar thermal power stations. Operational since February 2014.
Kemper County Energy FacilityMississippi, USA5822010Suspended$7.5 billion USDThe world's first construction attempt of an Integrated Gasification Combined Cycle plant with Carbon Capture & Sequestration. However, after significant delays and cost overruns, the gasification process is currently suspended and the power plant runs just on regular natural gas.[30]
Mojave Solar ProjectBarstow, California, USA280Completed2014One of the largest operational solar thermal power stations.
Noor Abu DhabiAbu Dhabi, UAE1,177Completed2019One of the world's largest photovoltaic power stations.[31]
Olkiluoto 3Eurajoki, FinlandCompleted2022Began regular operations in April 2023.[32][33]
Panamanian Natural Gas electric power plantColón Province, PanamaIt is meant as a port for supplying Natural Gas to other Central American countries. It currently has an investment of $1.15 billion USD.[34]
Pavagada Solar ParkKarnataka, India2,050Completed2019One of the world's largest photovoltaic power stations.[35][36]
Quaid-e-Azam Solar ParkBahawalpur, Pakistan1,0002015In progressPhase-1 of 100 MW Operational since 2015. Expected to be one of the largest operational solar thermal power stations.
Solana Generating StationGila Bend, Arizona, USA280Completed2013Includes a 6h thermal energy storage. One of the largest operational solar thermal power stations.
Solar Energy Generating SystemsMojave Desert, California, USA3541984-1991CompletedCollection of 9 units. One of the largest operational solar thermal power stations.
Tengger Desert Solar ParkNingxia, China1,547Completed2016One of the world's largest photovoltaic power stations.[37][38]
Three Gorges DamHubei Province, China22,5001994Completed2003¥203 billionThe largest hydro-electric facility in the world.
Tres Amigas SuperStationUnited Statesn/aCancelledn/a$2 billion (early estimate)A proposed interconnection between the Eastern Interconnection, the Western Interconnection, and the Texas Interconnection, effectively connecting nearly all electrical grids in North America.
Virgil C. Summer Nuclear Generating StationJenkinsville, South Carolina, USA9732013CancelledOver $2.5 billion USDThe project planned to construct some of the first new nuclear units in the United States in over 30 years at an existing nuclear power plant. The project was cancelled and all work stopped in July 2017.[39]
Vogtle Electric Generating PlantWaynesboro, Georgia, USA2013In progress2024 (proj.)Construction of two new nuclear units at an existing nuclear power plant.

Science projects

CMS detector for LHC

Research and development efforts

ProjectLocationStart yearStatusEnd yearCostNotesRef
CopernicusEuropean Union1998Ongoing6.8 billion (2020)Satellite constellation program for global monitoring
COVID-19 vaccine developmentWorldwide2020Completed2023$93 billion USD (2021)Global efforts to develop a vaccine against the SARS-CoV-2 virus[40]
Human Genome ProjectUnited States/Worldwide1990Completed2003$5 billion USD (2021 adj.)U.S.-led international effort to sequence the human genome[41]
Manhattan ProjectUnited States1942Completed1946$22.8 billion USD (2021 adj.)U.S. government effort to produce the first nuclear bombs.[42]

Physics and Astronomy infrastructure

ProjectLocationStart yearStatusEnd yearCostNotesRef
Atacama Large Millimeter ArrayAtacama Desert, ChileCompleted
Deep Underground Neutrino Experiment and the Long Baseline Neutrino FacilityFermilab, Sanford Underground Research Facility, USA2032 (proj.)Proposed$3 billion USD (phase 1 est.)[43]
Electron-ion colliderBrookhaven National Laboratory, USA2020In progress$1.6 - $2.6 billion USD
EnvisatOuter space2002CompletedAn Earth observation satellite of the European Space Agency; inactive since 2012.
European Spallation SourceLund, Sweden2013In progress2025 (proj.)Strongest-ever spallation source for advanced and new material research development.
European X-ray free electron laserSchenefeld, Germany2017Used for material research.
Extreme Light InfrastructureCzech Republic, Hungary, RomaniaEuropean centers for the most intense lasers
Extremely Large TelescopeChile2014In progress2025 (proj.)World's largest optical to mid infrared telescope.
Facility for Antiproton and Ion ResearchDarmstadt, Germany2012In progress2025 (proj.)[44]
Five hundred meter Aperture Spherical TelescopeGuizhou Province, China2011Completed2020¥1.2 billionThe world's largest static/semi-static radio telescope measuring 500 meters across.
Giant Magellan TelescopeVallenar, Chile2015In progress2025 (proj.)$2 billion USDA large ground-based optical and near infrared telescope.
India-based Neutrino ObservatoryTamil Nadu, India2015In progress1,500 (2015 est.)
ITERFrance2013In progress2025 (proj.)Up to 65 billion (est.)International effort to build the world's largest nuclear fusion reactor.
Large Hadron ColliderSwitzerland, France13 TeV CERN particle accelerator[45]
Advanced LIGOWashington state and Louisiana, USA1994Completed2002More than $1 billion USDA large-scale physics experiment and observatory to measure gravitational waves[46]
MYRRHABelgiumIn progress2036 (proj.)Prototype of an accelerator-driven system to transmute nuclear waste
National Ignition FacilityLawrence Livermore National Laboratory, USA1997Completed2009Almost $1 billion (2002 est.United States nuclear fusion project
Ocean Networks CanadaUniversity of Victoria, CanadaLargest underwater observatories, providing 24/7 access to hundreds of instruments in the Pacific Ocean and the Salish Sea.
Proton Improvement Project ("PIP II")2020In progress2028 (proj.)$1.28 billion USD2022 est.[47]
Square Kilometre ArraySouth Africa, Australia2018In progress2028 (proj.)
Superconducting Super ColliderWaxahachie, Texas, USACancelled$8.4 billion USD (1993 est.)40 TeV particle accelerator
TevatronBatavia, Illinois, USA1969Completed1983$120 million USDInactive TeV particle accelerator.
Thirty Meter TelescopeMauna Kea Observatories, USA2014HaltedLarge optical and near infrared telescope. Halted due to protests.
Very Large ArrayNew Mexico, USA1973Completed1980Radio astronomy observatory.
Wendelstein 7-XGreifswald, Germany2005Completed2015An experimental stellarator (nuclear fusion reactor)

Spacecraft

ProjectOrganization(s)Start yearStatusEnd yearCostNotesRef
Advanced Telescope for High Energy AstrophysicsESA2000sIn progress2035 (proj.)Planned X-ray telescope.
Cassini–HuygensNASA, ESA, ASICompleted2017$3.26 billion USDSpacecraft mission that studied Saturn and its many natural satellites.[48]
Chandrayaan programISRO2003Active$170 million USDLunar exploration program.
Chang'e 1 to Chang'e 6ChinaActiveLunar exploration spacecraft equipped with landers, orbiters and rover. It will for the first time in history explore the dark side of the Moon.
Compass navigation systemChinaEst. 2015CompletedEst. 2017Independent system of satellite navigation
Europa ClipperNASA2022In developmentInterplanetary mission to study Jupiter's moon Europa.
Gaia spacecraftESA2013Active2025 (proj.)$1 billion USDMission to create a 3D map of local Milky Way.[49]
Galileo Navigation Satellite SystemEuropean Union, ESA2016Active€5[50]
Galileo spacecraftNASA1989Completed2003$1.5 billion USD (2003)Mission to Jupiter.[51][52]
Global Positioning SystemUnited States Department of Defense1973ActiveOver $21.7 billion USDGlobal satellite navigation system.[53]
GLONASSRoscosmos1982ActiveThe Russian global navigation satellite system.
Herschel Space ObservatoryESA, NASA2009Completed2013€1.1 billionSpace observatory sensitive to the far infrared and submillimetre bands.[54]
Hubble Space TelescopeNASA1978Active$10 billion USDOptical telescope orbiting in low Earth orbit[55]
International Space StationNASA, Roscosmos, JAXA, ESA, CSA1998Active$150 billion USD (2010)
James Webb Space TelescopeNASA, ESA, CSA2021Active$8.8 billion USD (2013)[56])
Juno spacecraftNASA2011ActiveNew Frontiers mission to Jupiter
Jupiter Icy Moon ExplorerESA2023ActiveMission to Jupiter
Laser Interferometer Space AntennaESA2032 (proj.)ProposedAn L3 class mission designed to detect and accurately measure gravitational waves.
Lunokhod ("Moonwalker")Soviet space program1969Completed1977Inactive series of Soviet robotic lunar rovers designed to land on the Moon. Lunokhod 1 was the first roving remote-controlled robot to land on another world.
Mars programSoviet space program1960Completed1973Inactive series of uncrewed spacecraft. The spacecraft were intended to explore Mars, and included flyby probes, landers and orbiters.
Mars Science Laboratory (with Curiosity)NASA2011Active$2.5 billion USD[57]
Mars 2020 (with Perseverance and IngenuityNASA2020ActiveA Mars rover mission under the Mars Exploration Program.
MirSoviet space program, Roscosmos1986Completed2001Russian space station in low Earth orbit.
Nancy Grace Roman Space TelescopeNASA2027 (proj.)In developmentA wide field infrared space telescope.
NAVICISRO2013ActiveThe Indian equivalent of GPS.
Orion spacecraftNASA2014ActivePart of the Artemis program.
Planck spacecraftESA2009Completed2013A mission to measure the cosmic microwave background.
VeneraSoviet space program1961Completed1984Venus series space probes developed to gather data from Venus. Venera 7 became the first spacecraft to land on Venus and first to transmit data from there back to Earth.
Sutherland spaceportBritish space programme2023In developmentThis will be the first spaceport in the UK.

Other spaceflight projects

ProjectOrganization(s)Start yearStatusEnd yearCostNotesRef
Alpha Magnetic SpectrometerNASA, Roscosmos, JAXA, ESA, CSA2011Active$2 billionA particle physics experiment module mounted on the International Space Station[58]
Apollo programNASA1960Completed1975$203.4 billion USD (2015)As a centerpiece of the US Space Program, culminated in crewed exploratory missions to the Moon.[59]
ArianeESA1973ActiveA family of European launch vehicles; the most recent development is Ariane 6.
Artemis programNASA with partners JAXA, ESA, CSA, DLR, ASI, ISA2017Active
Avatar RLVDRDO, ISROProposedIndian version of the Space Shuttle.
Baikonur CosmodromeSoviet space program, Roscosmos, Russian Aerospace Forces1955ActiveThe world's first and largest operational space launch facility. It was originally built by the Soviet Union in the late 1950s as the base of operations for the Soviet space program.
Buran programSoviet space program, Roscosmos1974Cancelled1993Soviet version of the Space Shuttle.
Constellation programNASA2005Cancelled2010Cancelled planned Moon landing spacecraft and Space Shuttle replacement. Part of it lives on as future Crew Escape Vehicle for the ISS.
SpaceX Mars transportation infrastructureSpaceX2016ActiveA privately funded spaceflight system capable of enabling human settlements on Mars.
Kennedy Space CenterNASA1968ActiveThe main spaceport for US-crewed space flight.
Shenzhou programChina Manned Space Agency1992ActiveChinese human spaceflight program.
Soyuz programSoviet space program, Roscosmos1966ActiveHuman spaceflight program.
Soviet MoonshotSoviet space program1962Cancelled1969Cancelled Moon landing program.
Space Launch SystemNASA2011ActiveAn American Space Shuttle-derived heavy expendable launch vehicle.
Space Shuttle programNASA1972Completed2011$203.6 billion USD (2015)Low Earth orbiters designed as crewed cargo vessels that could be reused after each spaceflight and landed like a glider.[60]
Vostochny Cosmodrome ("Eastern Spaceport")Roscosmos2011ActiveRussian spaceport on the 51st parallel north.
Vostok programSoviet space program1959Completed1963Soviet program to put the first man in space.

Sports and culture projects

Every Olympic Games and FIFA World Cup in the latter part of the twentieth century and entering into the 21st century has cost more than $1 billion in arenas, hotels etc., usually several billions. The Olympic Games are considered to be the world's foremost international sporting event with over 200 nations participating. Sports-related costs for the Summer Games since 1960 is on average $5.2 billion (USD) and for the Winter Games $393.1 million dollars. The highest recorded total cost was the 2014 Sochi Winter Olympics, costing approximately US$55 billion. The International Olympic Committee requires a minimum of 40,000 hotel rooms available for visiting spectators and an Olympic Village that is able to house 15,000 athletes, referees, and officials.

ProjectOrganization(s)LocationStart yearStatusEnd yearCostNotesRef
Allegiant StadiumNational Football LeagueParadise, Nevada, USACompleted2020$1.9 billion USDThis domed stadium is home to the Las Vegas Raiders as well as a local college team, the UNLV Rebels[61]
AT&T StadiumNational Football LeagueArlington, Texas, USACompleted2009$1.3 billion (2009)A retractable-roof stadium that houses the Dallas Cowboys. It also hosts other major events, most notably the Big 12 Championship Game and Cotton Bowl Classic in college football.[62]
Barclays CenterNational Basketball AssociationBrooklyn, New York, USACompleted2012$1 billion (2012)Home of the Brooklyn Nets. Also served as full-time or part-time home of the NHL's New York Islanders from 2015 to 2020.[63]
Climate Pledge ArenaNational Hockey LeagueSeattle, Washington, USACompleted2021$1.05 billion (2021)Renovation and expansion of Seattle's main indoor arena for the Seattle Kraken, which started NHL play in the rebuilt venue in 2021. The originally planned cost of $700 million was increased due to changes to the arena plans and COVID-19 issues. A very small part of the total cost was to pay for another major arena tenant, the Seattle Storm of the WNBA, to move its home games to other area venues during the project. The arena will also be suitable for a potential NBA franchise in the city.[64]
Globe Life FieldMajor League BaseballArlington, Texas, USACompleted2020$1.1 billion (2020)This retractable-roof stadium houses the Texas Rangers.[65]
Guangzhou Evergrande Football StadiumChina League OneGuangzhou, Guangdong, China2020Cancelled2022¥12 billion (2022)100,000-seat football stadium intended to be the future home of Guangzhou F.C. of the Chinese Super League. Construction began in April 2020 and cancelled in 2022 due Evergrande's financial difficulties.
Levi's StadiumNational Football LeagueSanta Clara, California, USACompleted2014$1.3 billion (2014)An open-air stadium that houses the San Francisco 49ers.[66]
Mercedes-Benz StadiumNational Football LeagueAtlanta, Georgia, USACompleted2017$1.6 billion (2017)A retractable-roof stadium to house the Atlanta Falcons, as well as Atlanta United FC of Major League Soccer.
MetLife StadiumNational Football LeagueEast Rutherford, New Jersey, USACompleted2010$1.6 billion (2010)An open-air stadium to house two NFL teams, the New York Giants and New York Jets.
Narendra Modi StadiumIndian Premier LeagueAhmedabad, Gujarat, India2015Completed2020$110 million USD (2020)It is the largest cricket stadium in the world with a seating capacity of 132,000 spectators.[67]
Sardar Vallbhbhai Patel Sports EnclaveSummer Olympic GamesAhmedabad, Gujarat, India2021In progress$640 million USD (2021)
SoFi StadiumNational Football LeagueInglewood, California, USACompleted2020$4.9 billion (2020)This domed stadium houses two NFL teams, the Los Angeles Rams, who own the stadium, and the Los Angeles Chargers.[68]
Tottenham Hotspur StadiumPremier LeagueLondon, England, UKCompleted2019£850 million (2019)Home to the Tottenham Hotspur F.C. Also designed to host American football games in the NFL International Series[69]
U.S. Bank StadiumNational Football LeagueMinneapolis, Minnesota, USACompleted2016$1.061 billion (2016)A domed stadium that is home to the Minnesota Vikings.[70]
UBS ArenaNational Hockey LeagueElmont, New York, USA2019Completed2021$1 billion (2021)This new multi-use arena is designed to handle 18,000 seats to host New York Islanders home games.[71]
Wembley StadiumThe Football AssociationLondon, England, UKCompleted2007£798,000,000 (2007)Home of the England national football team; also designed to host many other large events.[72]
Yankee StadiumMajor League BaseballBronx, New York, USACompleted2009$2.309 billion (2009)This open-air stadium opened as the replacement for the New York Yankees' original Yankee Stadium. It has since become home to a Major League Soccer team, New York City FC.[73]

Roads and transport infrastructure

The Third Mainland Bridge is currently the longest of three bridges connecting the island of Lagos to the mainland.

Ground transportation systems like roads, tunnels, bridges, terminals, railways, and mass transit systems are often megaprojects. Numerous large airports and terminals used for airborne passenger and cargo transportation are built as megaprojects.

Africa

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
African UnionGreat Green Wall of the Sahara and the SahelSahel region2007ActiveEffort to prevent the expansion of the Sahara Desert
NigeriaAbuja Light RailAbuja, FCT, NigeriaSuspended2020$2.65 billionThe first phase of the project connects the city centre to Nnamdi Azikiwe International Airport, stopping at the Lagos–Kano Standard Gauge Railway station in Idu. The first 12 stations opened in July 2018 before services were suspended in early 2020 due to the COVID-19 pandemic.[74][75][76]
Fourth Mainland BridgeLagos State2022In progress$4.2 billionThe fourth mainland bridge will join three other bridges connecting Lagos Island to the mainland. The 38 km (24 mi) bridge and expressway will become the longest bridge and expressway in the world when completed.[77]
Lagos-Calabar RailwayLagos, Cross River, Rivers, Anambra States2014In progress$11.920 billionPhase 1 of this 1,402 km (871 mi)standard gauge railway will connect Lagos to Calabar; the second phase will connect Calabar and Lagos through Onitsha.[78]
Lagos–Kano Standard Gauge RailwayLagos, Kano, Kaduna, and Oyo States; FCT2016In progress$8.3 billionThis 2,733 km (1,698 mi) standard gauge railway has three planned routes: Abuja to Kaduna, Lagos and Ibadan, and Lagos to Kano. The first two lines opened in 2016 and 2021, respectively.[79]
Lagos Rail Mass TransitLagos State2009In progress$3.6 billionAn urban rail system that is planned to have seven lines. The first line opened in 2023.[80][81]
Third Mainland BridgeLagos State1970sCompleted1990Currently the longest of three bridges connecting Lagos Island to mainland Lagos. It is 11 km (6.8 mi) in length.

Asia

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
BangladeshPadma BridgeMunshiganj, Shariatpur, and Madaripur Districts2014Completed2022$3.6 billionA 6.150 km (3.821 mi) two-level road-rail bridge. It is the longest bridge in Bangladesh, the second-longest in the Indo-Gangetic Plain, and the longest over the Ganges River in terms of both span and the total length.
Dhaka Metro RailDhaka2016In progress$2.8 billionOf the six planned lines, two are operational as of 2022 and 2023, respectively.
Karnaphuli TunnelChittagong2017Completed2023$1.2 billionFirst underwater tunnel in the South Asian region.
Bangabandhu Railway BridgeSirajganj to TangailIn progress$1.6 billionA 4.8 km (3.0 mi) long railway bridge that is expected to be the largest dedicated rail bridge in the country after completion.
Hazrat Shahjalal International Airport Terminal 3Dhaka2019In progress2024 (proj.)$2.5 billionUpon completion of the third terminal, passenger handling capacity of the airport will increase to 20 million from the current 8 million per annum. Cargo handling capacity will also increase to 500,000 from 200,000 tonnes annually.
Rooppur Nuclear Power PlantIshwardi2017In progress2025 (proj.)$12.65 billionIt will be the country's first nuclear power plant.
Central Business DistrictPurbachalIn progress$17 billionIt will have three super-tall skyscrapers, surrounded by thirty-eight 40+ floor skyscrapers.
IndiaBharatmalaNationwide2017In progressMore than $110 billionRoad development project under the Ministry of Road Transport and Highways.[82]
Char Dham HighwayUttarakhandIn progressMore than $1.5 billionA two-lane National Highway.
Delhi–Mumbai Industrial Corridor ProjectSix Indian statesIn progressMore than $90 billionInvestments will be spread across the 1,500 km (930 mi) long Western Dedicated Freight Corridor, which will serve as the industrial corridor's transportation backbone.[83][84][85]
Hyderabad Metro RailHyderabad, Telangana2012In progressMore than $2.5 billionTwo of the three planned lines became operational in 2017.[86][87][88]
HyperloopNationwideProposedProposal to establish hyperloop infrastructure for the Pune-Mumbai, Chennai-Bangalore, and Amaravati-Vijayawada corridors.[89][90][91]
Mumbai–Ahmedabad high-speed rail corridorMumbai-Ahmedabad corridorIn progress2027 proj.More than $18 billionWhen completed, it will be India's first high-speed rail line.[92]
Navi Mumbai International AirportMumbai2021In progress2024 (proj.)More than $2.5 billionThis project aims to ease air traffic congestion at Chhatrapati Shivaji Maharaj International Airport.[93]
Noida International AirportNoida, Uttar Pradesh2021In progressMore than $4 billionThis airport aims to decongest the load of the Indira Gandhi International Airport in Delhi by serving 120 million passengers per year over eight runways. The airport is expected to expand in three phases over 30 years and will be one of the world's largest airports upon completion. Phase 1 will be completed in 2024.[94][95]
SagarmalaNationwideIn progressMore than $130 billionA Ministry of Ports, Shipping and Waterways project meant to enhance the country's logistics sector.[96][97]
IndonesiaJakarta MRTJakartaIn progress$2.86 billionAs of 2019, one of the four planned lines is operational. The next two lines to open are expected to open in 2024 and 2026.
Greater Jakarta LRTJakarta2004In progress2023$1.58 billionPhase 1, the Bekasi Line and part of the Cibubur Line, were completed in 2023.[98]
Jakarta–Bandung HSRJava2016In progress$5.5 billion3 of the 4 planned lines have been opened and are operational.
Trans-Sumatra Toll RoadSumatraIn progress$33.2 billionOf the 17 planned segments, 8 have been completed as of 2019.
JapanJapan's Maglev High-Speed Rail (Chūō Shinkansen)TokyoNagoyaOsaka2014In progress2037 proj.¥9 trillion
MalaysiaKlang Valley Mass Rapid Transit ProjectKuala Lumpur2016In progress2028 proj.RM50 billionWhen completed, it will be operated as part of the Klang Valley Integrated Transit System.
MRL East Coast Rail Link (ECRL)Kelantan, Terengganu, Pahang, Negeri Sembilan, Selangor2017In progress2027 proj.RM44 billion
Kuala Lumpur International AirportSelangor1993CompletedRM3.92 billion
Penang SentralPenang2007Completed2018RM230 million
West Coast ExpresswaySelangor and Perak2014In progressRM5.044 billion
PakistanKarachi–Lahore MotorwayKarachi to Peshawar through Islamabad, Lahore, Multan and Sukkur2015Completed2020$6.6 billionThis six-lane, high-speed, limited-access motorway is 1,694 km (1,053 mi) in length.
Karachi Circular RailwayKarachi2001In progress$1.6 billionRevival of the Karachi Circular Railway, which became operational in 1969 and closed in 1999 due to mismanagement. The project includes 23 stations, 3 lines and more than 50 km (31 mi) of track.
Karachi MetrobusKarachi2013In progress$400 millionTwo of the 6 planned lines are operational.
Malir ExpresswayKarachi2022In progress2024 (proj.)$400 millionAs of August 2023, half of the 40.3 km (25.0 mi) expressway is operational.
New Gwadar International AirportGwadarIn progress2024 (proj.$400 millionThis will replace the existing Gwadar International Airport.
Karachi–Peshawar Railway Line ML-1Multiple Pakistani provinces2024 (proj.)In progress$7 billionThis renovation is part of the China–Pakistan Economic Corridor.
Orange Line MetroLahore2015Completed2020$1.500 billionThis is the first of the three planned Lahore Metro lines and is Pakistan's first driverless metro.
ChinaChina–Pakistan Economic CorridorPakistan and Xinjiang, ChinaIn progress$62 billionThe project aims to connect Gwadar Port to Xinjiang via a network of highways, railways and pipelines to transport oil and gas. The economic corridor is expected to run about 3,000 km (1,900 mi)[99]
Beijing Daxing International AirportBeijing2014Completed2019$17 billion
Hong Kong-Zhuhai-Macao BridgePearl River Delta2009Completed2018$10.600 billion
PhilippinesBataan–Cavite Interlink BridgeBataan-Cavite2023In progress$3.75 billionA 32 km (20 mi) bridge over Manila Bay that will connect Central and Southern Luzon.[100]
Manila Metro Rail Transit SystemMetro Manila1996In progress2028 proj.$15.845 millionOne line operational as of 2020. It is expected to have a total of eight lines with a total length of 142 km (88 mi).[101][102][103][104][105][106]
Mindanao Railway expansionMindanao[107]
New Manila International AirportBulacan2022In progress2027 proj.$14.111 billionAims to decongest and eventually replace Ninoy Aquino International Airport. It will be operated by the San Miguel Corporation.[108]
North–South Commuter RailwayMetro Manila, Central Luzon2019In progress2029 proj.$14.95 billionThe railway will connect Clark International Airport with Metro Manila and Calabarzon.[109]
PNR South Long HaulLuzonIn progress2027 proj.$3.45 billion[110]
South Luzon Expressway expansionMetro Manila, Calabarzon2006In progress$2.278 billionIncludes Toll Road 4 from Calamba to Lucena, Toll Road 5 from Lucena to Matnog, and the Pasig River Expressway.
SingaporeCross Island MRT LineNationwide2023In progress$40.7 billion SGD
Changi Airport Terminal 5Asia–Pacific2022In progressMid-2030s (proj.)$10 billion USDThe terminal will be able to handle a capacity of 70 million passengers a year upon completion.
Marina Coastal ExpresswayNationwide2008Completed2013$4.3 billion SGDFirst undersea expressway in Singapore.[111]
Tuas Mega PortIn progress$20 billionTuas Port will be able to handle 65 million twenty-foot equivalent units (TEUs) annually, almost double the 36.9 million TEUs that Singapore handled in 2020.
South KoreaIncheon International AirportSeoul Capital Area1992Completed2024 (proj.)Over 3,903 trillionIntended to replace Gimpo International Airport[112][113]
ThailandHigh-speed rail in ThailandCentral, Western and Southern ThailandIn progress2037 (proj.)$30 billionThe project consists of four high-speed rail corridors: one international corridor, which will be a part of the Kunming–Singapore Railway project after completion.
VietnamLong Thanh International AirportHo Chi Minh City2019In progressAfter 2035 (proj.$7.8 billionThis project is partially operational.

Middle East

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
BahrainBahrain International Airport Expansion ProjectMuharraq, Muharraq IslandCompleted2021$1.1 billion USD
Bahrain Light Rail NetworkNationwideIn progress2025 (proj.)$2 billion USD
IranTehran-Shomal FreewayTehran-Mazandaran provinceIn progressAbout $1 billion USDWill be 121 kilometres (75 mi) in length. As of 2023, three of the four planned sections are operational.[114]
IsraelTel Aviv–Jerusalem railwayTel Aviv-Jerusalem2001completed$1.9 - $2.8 billion USD
Tel Aviv Light RailTel Aviv Metropolitan Area2015In progress187.5 billionAs of 2023, 1 of the 4 planned light rail transit has been completed. Three metro lines will also be constructed.
KuwaitSheikh Jaber Al-Ahmad Al-Sabah Causeway ProjectKuwait Bay2013Completed2019$3 billionLaunching point of Madinat Al-Hareer in Subiya.
Kuwait International Airport Passenger Terminal 2Kuwait City2017In progress2025 (proj.)$4.3 billionConstruction was delayed due to the COVID-19 pandemic.[115]
QatarDoha MetroDohaIn progress2026 (proj.)$36 billionConstruction will add 300 km (190 mi) of track.
Qatar Expressway ProgrammeDohaIn progress$28 billion USD (CAPEX)This programme aims to deliver more than 800 km (500 mi) of new or upgraded roads and more than 200 interchanges in Qatar. It is part of the Qatar National Vision 2030. One of the motivating factors was the 2022 FIFA World Cup.[116]
Saudi ArabiaKing Abdulaziz International Airport expansionJeddah2006Completed2019$7.2 billion
Riyadh MetroRiyadh2014Completed2024 (proj.)$23.5 billion[117]
UAEAl Maktoum International AirportDubaiIn progress2030 (proj.)$82 billionUpon completion, it will be the fourth largest airport in the world.[118]

Central America

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
Costa RicaOrotina Mega AirportOrotina
Green Costa Rican Canal
Electric Train of The Great Metropolitan Area
Panama4th bridge over the Panama CanalPanama CanalIn progress$1.4 billion
Panama Metro line 1Panama City2010Completed2014$1.8 billion
Panama Metro line 2Panama City2015Completed2019$2 billion[119]
Panama Metro line 3Panama City2021In progress2025 (proj.)$2.6 billion[120]

Europe

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
CroatiaPelješac BridgeDubrovnik-Neretva County2018Completed2022Around €420 million (€357 million of EU funds)The bridge links the Croatian exclave to the rest of the country while bypassing Bosnia and Herzegovina's short coastal strip at Neum.[121]
Czech RepublicBlanka tunnel complexPrague2006Completed2015$1.97 billionThe longest city tunnel in Europe at 5.5 kilometres (3.4 mi)
Denmark/GermanyFehmarn Belt fixed linkLolland, Fehmarn2021In progress€10 billionAn immersed tunnel connection the Danish island of Lolland with the German island of Fehmarn.
European UnionTEN-T Core NetworkEuropeIn progressMore than €600 billionThe purpose of the project is to connect nine European Corridors. The Trans-European conventional rail network is part of the EU megaproject to help alleviate and assist in the transport of goods throughout the 27 EU member states.[122][123]
FranceGrand Paris ExpressParis2015In progress2030 (proj.)$45 billionLines will be opened in stages between 2024 and 2030.
GermanyGerman Reunification Transport Projects Number 8Berlin Central Station and Nuremberg Main StationIn progress$10 billionProposed after German Reunification, this is a set of major construction projects meant to increase and improve transport links between East and West Germany.
GreeceAthens MetroAthens2021In progress2029 or 2030 (proj.)€5.75 billionLines 1, 2 and 3 are already operational and are undergoing upgrades.[124][125][126]
Egnatia OdosIgoumenitsa-Kipoi1995Completed€5.93 billionThis project was built alongside the general route of the ancient Roman Via Egnatia and consisted of 670 kilometres (420 mi) of motorways.[127]
Egnatia RailwayAlexandroupolis-IgoumenitsaApproved€10 billionProposed in 2017; upon completion, it will be Europe's largest railway megaproject.[128][129]
Ionia OdosIoannina-Gulf of Corinth2006CompletedOver €1.1 billionAs part of this project, 196 kilometres (122 mi) of motorways were built.[130]
Thessaloniki MetroThessaloniki2006In progress2024 (proj.)€2.26 billionThe purpose of the project is to create a 35-station underground rapid transit system in Greece's second-largest city. Construction has been delayed due to the Greek financial crisis.[131]
ThessalonikiKavalaXanthi railwayNorthern GreeceIn progress€1.25A new electrified railway line running parallel to the Egnatia Odos highway, cutting travel times and will replace the existing Thessaloniki–Alexandroupoli railway which was built during the Ottoman Empire.[132]
Tithorea-Domokos bypassPhthiotis Municipality1997Completed2019€1.8 billionA total of 106 km (66 mi) of high-speed railways were built as a bypass to the existing conventional mountainous railway line linking Thessaloniki with Athens, including 35.5 kilometres (22.1 mi) of tunnels and 6.8 km (4.2 mi) of bridges.[133][134]
MontenegroBar-Boljare motorwayBar, Boljare2015In progress2022$3 billionThe highway is 40.871 km (25.396 mi) long ad tunnels and bridges make up about 60% of the entire route. The first section between Podgorica and Mateševo opened in July 2022.
NorwayCoastal Highway E39Trondheim-Kristiansand2018In progress382kr billionThe purpose of the project is to replace all ferry links along the route with fixed connections to reduce travel time from 21 hours to 11 hours. Construction is uncertain and each project will be evaluated separately.
InterCityØstlandetIn progress2034 (proj.)50kr billion (2022)Project to connect all major towns in the vicinity of Oslo by a double-rail line.
Fornebu LineOslo, Bærum2020In progress2027 (proj.)13.32kr billionA new metro line stretching from Majorstuen to Fornebu through Oslo.
PolandCentral Transport HubGmina BaranówProposedMore than $8 billionAirport/train station in Warsaw. Phase 1 is scheduled to open in 2027.[135]
PortugalVasco da Gama BridgeLisbon1995Completed1998$1.1 billionIt is the longest bridge in Europe (including viaducts), with a total length of 12.3 km (7.6 mi), including 0.8 km (0.50 mi) for the main bridge and 11.5 km (7.1 mi) in viaducts.
SerbiaBelgrade MetroBelgrade2021In progress2028 (proj.)$5 billionThis construction will includes 43 stations and 2 lines.
Belgrade-Boljare motorwayBelgrade, BoljareIn progress$2.5 billionPart of the Belgrade-Bar motorway. The second section is the most expensive section of the entire motorway due to unfavourable terrain, requiring the construction of many tunnels and bridges.
Belgrade WaterfrontBelgrade2014In progress$3.5 billionAn urban renewal development project.
Serbia-HungaryBudapest–Belgrade railwayBudapest-Belgrade2021In progressAround $5 billionThis will connect the two capitals by high-speed rail. This is stage one of the Budapest–Belgrade–Skopje–Athens railway, which itself is part of China's Belt and Road Initiative.
Serbia-North Macedonia-GreeceMorava-Vardar CanalSerbia, North Macedonia, GreeceProposed$17 billionThis would make Great Morava and South Morava accessible to boats from Thessaloniki and make Morava and Vardar navigable rivers, and clean them for passage of boats. China has a vested interest in building the canal.[136]
SloveniaDivača–Koper Railway upgradeSlovenia2021In progress2025 (proj.)$1.175 billionThis 27.1 kilometres (16.8 mi) railway will better connect inland regions with the seaside and port of Koper.[137][138]
SwitzerlandGotthard Base TunnelAlps1999Completed2015CHF 9.56 billionAt 57 km (35 mi), it became the world's longest and deepest rail tunnel upon its completion in 2015.
United KingdomExpansion of Heathrow AirportLondonProposed$25.24 billion USDThis construction would add a third runway and an additional terminal.
Irish Sea BridgeIrish Sea
-
Abandoned
-
£335 billionAbandoned due to cost.[139]
High Speed 2Greater London, South East England, West Midlands2020In progress2040 (proj.)£98 billion
London Crossrail Project Elizabeth lineGreater London, Berkshire, Buckinghamshire, Essex2009Completed2022£18.8 billionFully operational by May 2023.[140]
M8 motorwayGlasgow-Edinburgh2015Completed2017£30 million
Northern Powerhouse RailNorthern EnglandProposed2033 (proj.)$19 billion USDSometimes referred to as High Speed 3.

North America

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
CanadaSouthwest Calgary Ring RoadCalgary2016Completed2021More than $5 billionPart of the CANAMEX Corridor and the Stoney Trail.[141]
West Calgary Ring RoadCalgaryIn progress2024 (proj.)More than $1 billion
Calgary LRT ExpansionCalgary2022In progress2026 (proj.)More than $4.5 billion
New Champlain Bridge Corridor ProjectQuébec2015Completed2019$4.24 billionReplaced the existing Champlain Bridge.
Confederation BridgeThe Maritimes1993Completed1997$1.3 billionThe 12.9 km (8.0 mi) bridge is the longest bridge in the world crossing ice-covered water.
Confederation LineOttawa2013Completed2019$2.1 billionThe largest project in Ottawa since the Rideau Canal.[142] (Phase 1).
Crowchild Trail UpgradesCalgaryAfter 2027 (proj.)Approved2030 (proj.)More than $3 billion
Gordie Howe International BridgeWindsor, Ontario2018In progress2025 (proj.)$5.7 billionInternational cable stayed bridge over the Detroit River between Canada and the United States.
Line 5 EglintonToronto2011In progress2024 (proj.)$9.1 billion[141]
Port Mann BridgeVancouver2009Completed2015$1.93 billionThe widest bridge in the world at the time of opening. The cable-stayed bridge uses 288 cables to reach the total bridge length of 6,866 feet (2,093 m)
Réseau Express MétropolitainMontréal2018In progress2027 (proj.)$6.95 billionPartly operational beginning in July 2023, with other parts expecting to be opened in stages between 2024 and 2027.[141][143]
MexicoDurango-Mazatlán HighwayDurango-Sinaloa2008Completed2012$1.4 billionThe Baluarte Bridge, which is part of the highway, received a Guinness World Record for being the highest suspension bridge in western Mexico.
Mexico City Texcoco AirportMexico City
-
Cancelled
-
$13.3 billionAfter taking office, President Andrés Manuel López Obrador cancelled this mega-project in favor of a "metropolitan airport system", which kept the two-runway Benito Juárez International Airport from being decommissioned.
Felipe Ángeles International AirportMexico City2019In progress$7.1 billionThe airport's first terminal and two runways were opened in 2022.
United StatesAlaskan Way Viaduct replacement tunnelSeattle2007Completed$3.1 billion
Big DigBoston1991Completed2007$14.6 billion ($24.3 billion after interest)
Brightline WestLas Vegas Valley-Greater Los Angeles2023 (proj.)In progress2027 (proj.)$10 billionThis link would connect with the California High-Speed Rail.
California High-Speed RailLos Angeles-San FranciscoIn progress2030 (proj.)$100 billionA 1,300 km (810 mi) high-speed rail system is expected to be completed in phases up to 2030.
Chicago Region Environmental and Transportation Efficiency ProgramChicagoIn progress2025 (proj.)$4.6 billionCREATE is a railway improvement program consisting of 70 projects, including the construction of grade separations, overpasses, and other rail projects.[144]
Crescent Corridor ExpansionNortheast to Southeast regionsIn progress$2.5 billionThis project covers 4,023 km (2,500 mi) and thirteen states.[145]
East Side AccessManhattan and Queens2007Completed2023More than $11.1 billionThis network expansion project intended to increase direct services into Grand Central Terminal and decrease congestion in Midtown Manhattan. It also provides regular access from the New Haven and Hudson Lines to Penn Station.
Evergreen Point Floating BridgeSeattle2011Completed2016$4.56 billionThis 2,350 m (7,710 ft) long floating bridge is the longest of its type in the world; its predecessor previously held the title.
Interstate Highway SystemNationwide1956Completed2018$500 billion
John F. Kennedy International Airport RedevelopmentNew York City2020In progress$19 billionPhase 1, which covers Terminals 1, 4, 6, and 8, is expected to be completed by 2026. The redevelopment project aims to rebuild passenger facilities and approaches to the airport.
LaGuardia Airport ProjectNew York City2016In progress2024 (proj.)$8 billionA complete retrofit of the airport was expected by 2022 but was delayed due to the COVID-19 pandemic.
Los Angeles International AirportLos AngelesIn progress$14 billionRenovation of existing terminals, as well as new terminals and infrastructure.
Newark Airport Terminal ANewarkCompleted2023$14 billionConstruction added a new parking garage, 33 gates, and a walkway connecting the AirTrain, parking garage, and terminal.
O'Hare Modernization PlanChicago2001Completed2021$8.8 billion[146][147]
Ohio River Bridges ProjectLouisville, KentuckyCompleted2016$2.3 billionThe project involved reconstructing the Kennedy Interchange, the completion of two new Ohio River bridges and the reconstruction of ramps on Interstate 65. The final project omitted some features of the original plan.[148]
Project ConnectAustin, TexasIn progress$7.1 billionPublic transit expansion including the construction of two new light rail lines, a new commuter rail line, and a bus rapid transmit line. The project has undergone several cuts since its passing in 2020.[149] The project started construction in 2021 and is expected to be completed by 2034.[150]
Puget Sound Gateway ProgramSeattle & Tacoma, Washington2015In progress2028 (proj.)$2.38 billionThis project includes the completion of SR 167 between Puyallup and Tacoma and of SR 509 from I-5 to Burien.[151]
Reagan Airport's Project JourneyWashington, D.C.2018Completed2021$1 billionThis renovation introduced a new security building and checkpoints and added a new 14-gate concourse.
San Francisco International Airport RedevelopmentSan FranciscoIn progress2024 (proj.)$2.4 billionThe airport began a multiphase renovation project to turn Terminal 1 into a more environmentally friendly passenger facility.
Eastern span replacement of the San Francisco–Oakland Bay BridgeSan Francisco-Oakland, California2002Completed2013$6.4 billion
Second Avenue Subway ProjectManhattan1972In progress$17 billionThe proposed full line would be 13.7 km (8.5 mi) long, with 16 stations and a projected ridership of 560,000 people. Phase 1 opened in 2017.
Washington Metro Silver LineWashington, D.C.2009Completed2022$6.8 billionPhase 1 linked DC to Dulles International Airport and to four Virginia cities, and was opened in 2014. Phase 2 focused on urban development to reduce reliance on highways in Tysons and opened in 2022.
Sound Transit 3SeattleLate 2020s (proj.)Planned2041 (proj.)$50 billionThis project is to expand the current light rail and bus system currently used by the city and is to be completed in stages from 2024 to 2041.

Oceania

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
AustraliaCentral Station RedevelopmentSydney-EveleighProposed$10 billionExtension of Sydney's CBD with an approximately 3 km (1.9 mi) long renewal corridor[152]
Cross River RailBrisbane2017In progress2026 (proj.)$5.4 billionUpon completion, it will be the first rail-only Brisbane River crossing since the completion of the Merivale Bridge in 1978[153]
Metro TunnelMelbourne2017In progress2024 (proj.)$11 billionThis construction includes two 9 km (5.6 mi) rail tunnels and five new underground stations.
North East LinkMelbourne2020In progress2028 (proj.)$15.8 billionThis will connect the M80 Ring Road to the Eastern Freeway.
OneSKYCanberraIn progress2024 (proj.)$2 billionReplacement for the Australian Advanced Air Traffic System.[154]
Suburban Rail LoopMelbourne2022In progress2050 (proj.)$50 billionThe East and North sections, the two main ones, are planned to form a single 60 km (37 mi), fully-automated orbital metro line through the middle suburbs. Construction began on SRL East in 2022.[155]
Sydney Metro City & SouthwestSydney2017In progress2024 (proj.)$20.5 billion (2023)30 km (19 mi) rapid transit railway line.[156]
Sydney Metro WestSydney2020In progress2033 (proj.)$27 billion AUD24 km (15 mi) rapid transit railway line.[157]

Planned cities and urban renewal projects

Africa

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
EgyptMadinatyCairo Governorate2006In progress$10 billionHousing project.[158]
New Administrative CapitalCairo Governorate2015Completed2025 (proj.)$250 billionPhase 1 of 3 was completed in 2023. The full project is expected to house 6,500,000 people.
New Alamein CityMatrouh Governorate2015In progress$60 billionConstruction is spread out over three phases.
Galala CitySuez Governorate2018In progress$63 billionConstruction is spread out over three phases. Phase 1 has been completed.[159]
New Mansoura CityCairo Governorate2017In progress$3.7 billion
EthiopiaChaka ProjectAddis Ababa2022In progress$16 billion
KenyaKonza TechnopolisKonzaPlanned$14.5 billionPart of Kenya Vision 2030.
NigeriaAbujaFederal Capital Territory1980sCompletedAbuja has been the capital of Nigeria since 1991 and is among the four largest urban areas in Nigeria.[160]
Asokoro IslandAbujaIn progress$1 billionA peninsula development located in Abuja's Asokoro district on approximately 60 hectares of land.[161][162]
Centenary CityFederal Capital Territory2014In progress$18 billionA planned smart city to mark the country's centennial anniversary. It is expected to house 400,000 residents.[163]
Eko AtlanticLagos State2007In progress$6 billionThis planned city is being built on land reclaimed from the Atlantic Ocean. Upon completion, the project anticipates at least 250,000 residents and an additional daily flow of 150,000 commuters.[164]
Festac Town Phase 2Lagos StateIn progress$2.4 billionPhase 2 of the development was approved in 2014.[165]
LekkiLagos StateIn progressPhase 1 was completed and is currently in use. Other phases of the project include areas for free-trade zones, an airport, and a seaport. The completed city is expected to accommodate more than 3.4 million residents with an influx of 1.9 million commuters.[166]
South AfricaModderfontein New CityJohannesburg Metropolitan Municipality
-
Abandoned
-
$7.8 billion[167][168][169]

Asia

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
IndiaChennai Bangalore Industrial CorridorChennai-BangaloreIn progress
Delhi Mumbai Industrial CorridorDelhi-MumbaiIn progress2037 (proj.)$90 billionThe project aims to create seven smart cities distributed along the backbone of the freight corridor between Delhi and Mumbai.
Dholera SIRGujaratPlannedBefore 2040 (proj.)Part of India's Smart Cities Mission.
Gujarat International Finance Tec-CityGujarat2007In progress2025 (proj.)$20 billionIndia's first International Financial Services Centre. The city is operational, with the fourth and final phase of the project commencing in 2021.[171][172]
Mumbai-Bangalore Economic CorridorBangalore-MumbaiProposed
Navi MumbaiIndiaIn progress$13.4 billionWorld's largest planned city. Contains a population of 2.6 million.[173]
Visakhapatnam–Chennai Industrial CorridorVizag-ChennaiProposedPart of the East Coast Economic Corridor.
IndonesiaAncol DreamlandJakartaCompleted600-hectare integrated tourism area.
BSD CityGreater JakartaCompleted19896000 hectares.
Lippo CikarangGreater Jakarta1990Completed$18.75 billionA township and industrial park on 332 hectares of land.
Pantai Indah KapukJakartaCompletedA prestigious gated community.
JapanRoppongi HillsTokyo2000Completed2003$4 billion USDOne of Japan's largest integrated property developments.
Sky Mile TowerTokyoProposedIf built, construction would conclude around 2045. The tower would stand 1.7 kilometres (5,600 ft) high and have a capacity of around 55,000 people.
MalaysiaForest CityJohor BahruIn progress2035 (proj.)$100 billion USDA private town on reclaimed land.
Iskandar MalaysiaJohor Bahru2006In progress$100 billion USD
KL River CityKuala LumpurIn progressRm16.5 billionRehabilitation project along the Gombak River.[174]
Melaka GatewayMalacca City2014In progress2025 (proj.)$400 billion USD
Merdeka 118Kuala Lumpur2016Completed2023Rm5 billionUpon completion, it became the tallest building in Malaysia.
PutrajayaSepang District1995Completed$8.1 billion USDIn 1999, most of the seats of government moved from Kuala Lumpur to Putrajaya.
PakistanBahria ParadiseKarachiIn progressPart of Bahria Town
Bahria TownKarachi2014In progress$1 billion USDA gated community near Karachi.[175]
Bundel Island CityKarachiProposed$50 billion USDWhile the project has been long proposed, it has never materialized due to environmental concerns, especially the threat to mangroves, and objections from the Sindh Government.
Capital Smart CityIslamabadPlannedA planned housing development and smart city near New Islamabad International Airport.
Crescent BayKarachi2006In progress2050 (proj.)$2.4 billion USDAn upscale, mixed-use oceanfront development in Karachi.
DHA City (DCK)KarachiPlannedUpon completion, the new city anticipates at least 250,000 residents and a daily flow of 50,000 commuters.[176][177]
Gwadar Port CityGwadar$62 billion
IslamabadIslamabad Capital Territory1960sCompleted24 billionReplaced Karachi as Pakistan's capital city. Islamabad has a population of 2.2 million.[178]
LDA CityLahoreIn progressThe city is to be built on a 3,059 hectare piece of virgin land and is the largest housing development in Punjab.[179]
Port Tower ComplexKarachiPlanned$350 million USDThe 593 metres (1,946 ft) tall skyscraper will be situation on a manmade island and, upon completion, will be the tallest building in South Asia.
Ravi Riverfront Urban Development ProjectLahore2020In progress$41.04 billion USD70,000-acre urban development along both sides of the Ravi River.[180][181][182]
ChinaTodtownShanghai2014Completed2022$1.5 billion USDA mixed-use development.
PhilippinesBonifacio Global CityMetro ManilaCompletedPreviously occupied by the Philippine Army headquarters, it is currently one of Metro Manila's main central business districts.
Eastwood CityQuezon CityCompletedA high-density mixed-use development.
Entertainment CityManila BayIn progress$15 billion USDAn entertainment complex intended to be the Philippine counterpart of Macau and Las Vegas. It is built upon reclaimed land along Manila Bay.
Lancaster New City Zone 1 and Zone 2CaviteIn progress2,000 hectare planned community.
New Clark CityTarlac, PampangaIn progress3.2 billionA 9,450-hectare planned city modeled after South Korea's Songdo City.
NuvaliLagunaIn progress2,290 hectare planned community.
Sri LankaColombo Port CityColombo2014In progress2041 (proj.)$15 billion USDA reclaimed offshore city that serves as a special economic zone and international financial centre.[183]

Middle East

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
AzerbaijanKhazar IslandsBaku ArchipelagoStalled$100 billion USDArtificial archipelago consisting of 41 islands spreading 3,000 hectares. It is expected to house 1 million people upon completion.
IranIran MallTehranIn progressSAR220 trillionThe project spans more than 1.6 million square meters that includes shopping mall, two tower, two 5 star hotels, and a lake.[184]
IraqThe Bride of the GulfBasraProposedPart of Basra's project to rebuild.
JordanAbdali ProjectAmmanIn progress$5 billion USDThis project is being developed on 384,000 square metres (0.148 sq mi) of land, intending to create a total built-up area of over 1,700,000 m2 (0.66 sq mi).[185][186]
KuwaitMadinat al-HareerKuwait2019In progress$632 billion USDA 250 km2 (62,000 acres) planned urban area.
QatarLusailAl Daayen MunicipalityCompleted$45 billion USDHost city of the 2022 FIFA World Cup. As of 2022, it has a population of 198,600 people.
Saudi ArabiaJeddah Economic CityJeddah2013In progress2030 (proj.)SAR75 billionThe centerpiece of the development project will be the SAR4.45 billion Jeddah Tower, a tower planned to become the tallest in the world.
King Abdullah Economic CityMecca ProvinceIn progress$100 billion USDPhase 1 was completed in 2010.
King Abdullah Financial DistrictRiyadhIn progress$78 billion USDOne of five phases has been completed.
Masjid al-HaramMeccaCompleted2020$100 billion
NeomTabuk Province2017In progress2039 (proj.$500 billion USDA planned urban area containing The Line and Neom Bay Airport.[187][188]
United Arab EmiratesBurj Al ArabDubai1994Completed1999AED3.7 billionThe third tallest hotel in the world.
Burj KhalifaDubai2004Completed2009AED5.51 billionThe tallest building in the world since its grand opening in January 2010.
Business BayDubaiIn progressAED110.18 billionOnce completed, it will be the region's business capital and will be composed primarily of office and residential towers.
Dubai Creek TowerDubai2016In progressAED3.67 billionWhen completed, it will surpass the height of the Burj Khalifa, the world's tallest building since 2010.
Dubai International CityDubai2004In progressAED348.65 billionThe city is expected to house 60,000 residents when completed.
Dubai MarinaDubaiIn progressA district of Dubai and the world's largest manmade marina. The area is operational and continues to undergo development.
Dubai Meydan CityDubaiIn progressAED8.08 billion
Dubai WaterfrontDubai
-
Cancelled
-
After persistent erosion issues and the 2007–2008 financial crisis, the project was cancelled.
DubailandDubai2003In progress2025 (proj.)AED245.99 billionOriginally intended to be the largest leisure development in the world, Dubailand faced financial trouble during the 2007-2008 crisis. Plans have been scaled down since.
Falconcity of WondersDubai2005In progress$36.5 billion USD
Jumeirah Garden CityDubaiStalledAED348.65 billion
Mall of the WorldDubaiPlanned2029 (proj.)$6.8 billion USDUpon completion, this will be the world's largest shopping mall.
Masdar CityAbu Dhabi2006In progressAED80.8 billionThe city will rely entirely on solar energy and other renewable energy sources, with a sustainable, zero-carbon, zero-waste ecology and will be a car free city.
Palm DeiraDubai2005One of the Palm Islands.
Palm Jebel AliDubai2001Stalled$4 billion USDOne of the Palm Islands.
Palm JumeirahDubai2001Completed$12.3 billion USDThe world's largest manmade island.
The UniverseDubaiIndefinite holdA planned artificial archipelago in the shape of the Milky Way and Solar System.
The WorldDubai2003In progress$14 billion USDAn artificial archipelago of various small islands constructed in the rough shape of a world map
Yas IslandAbu DhabiIn progress$36 billion USDA leisure island that is home to Yas Marina Circuit, which has hosted the Formula One Abu Dhabi Grand Prix since 2009.

Eurasia

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
TurkeyIstanbul Finance CenterIstanbulIn progress7.58 billion
Turkey Urban Renewal ProjectNationwide2012In progress2032 (proj.)757.84 billionFikirtepe, a neighborhood of Kadıköy has been chosen as pilot area for project.[189][190][191][192][193]
RussiaLakhta CentreLakhta, Saint Petersburg2012Completed201977.1 billionIt is the tallest building in both Russia and Europe and replaced the cancelled Okhta Center.
Moscow International Business CenterMoscow1995In progress2030 (proj.More than 309 billionThe complex is home to the highest numbers of skyscrapers in Europe.
Okhta CenterSaint PetersburgCancelled
-
65 billionCancelled due to protests from the UNESCO World Heritage Centre, who wanted to preserve the skyline of Saint Petersburg's historic district.

Europe

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
FranceEuropa CityGonesse2016Cancelled2019€3.07 billionConstruction began in 2016 but was cancelled in 2019 due to local opposition and concerns about the project's environmental impact.
La Défense (1958–2014)Paris metropolitan area1958Completed2014More than Fr41.972 billionLa Défense is Europe's largest purpose-built business district.
La Défense (2016–present)Paris metropolitan area2016In progressMore than €903 millionThis project includes modernization and refurbishment of the existing area, as well as the addition of green spaces.
GermanyPotsdamer Platz RedevelopmentBerlinCompleted
HafenCityHamburg2003In progress2030 (proj.)One of the largest urban redevelopment projects in Europe by landmass.
NorwayFjordbyenOslo1980sIn progressAn urban redevelopment project.
Oslo Airport CityOsloIn progress
RomaniaEsplanada City CenterBucharest
-
Cancelled
-
$4.2 billion USDA planned multifunctional city center in Bucharest.
SpainBilbao Renovation ProjectBilbao1990sCompletedA deindustrialisation process beginning in the 1990s with the construction of the Guggenheim Museum Bilbao
Cuatro Torres Business AreaMadrid2004Completed2021$1 billion USD (est.)A complex of four skyscrapers, including Torre Cepsa, in Madrid's financial district.
Madrid Nuevo NorteMadrid2021 (proj.)In progress2045 (proj.$10.55 billion USDExpansion of the existing Paseo de la Castellana.
Southeast developmentsMadridIn progress2040-2050 (proj.More than $3.5 billion USDExpansion of the city with the creation of six new neighborhoods: Los cerros, Ensanche de Vallecas, Valdecarros, El Cañaveral, Los Berrocales, and El Ahijones. These additions expect to create 145,637 homes.
SwedenMillion ProgrammeNationwide1965Completed1974$5 billion USD (approx.A public housing program meant to establish affordable housing.
Northvolt GigafactoriesSkellefteå, Västerås2021In progress2024 (proj.)$4.7 billion USDLithium ion battery factory development.[194]
Redevelopment of SlussenområdetStockholmIn progressKr12 billion[195]
Relocation of Kiruna CentrumKirunaIn progress2035 (proj.)$2.1 billion USD[196]
United KingdomBig City PlanBirmingham1994In progress2030s (proj.)£12.75 billionRedevelopment of Birmingham to escape their image of being a concrete jungle.
Battersea Power Station RedevelopmentLondon2012Completed2022£13.25 billionModernisation of a defunct coal power station into a shopping centre.
Embassy GardensLondonCompleted2019£2.1 billionResidential and business development district.
Greenwich PeninsulaLondon1990sIn progress2030s (proj.)£8 billion
Pilgrim Street EastNewcastle upon TyneIn progress2025 (proj.)More than £400 million
Royal WharfLondon2014In progress£3.1 billionOriginally slated for completion in 2020, the development was nearly finished in 2021.
Stratford CityLondonIn progress£3.5 billionOriginally slated for completion by 2020.
Wembley ParkLondonIn progress2024 (proj.)£1.1 billion

North America

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
CanadaDowntown MarkhamOntarioIn progress2025 (proj.)$4 billion CADOne of the many city center projects in York Region.
Oakridge Centre RedevelopmentVancouver2019In progress2028 (proj.$5 billion CADThis project will turn Oakridge Centre into the second largest shopping mall in British Columbia.[197]
MexicoCancúnQuintana RooCompletedOne of the largest tourist destinations in North America.
Santa Fe, Mexico CityMexico CityCompleted
United States53 West 53Manhattan2015Completed2019$1.2 billion USDA supertall, primarily residential skyscraper. A restaurant and MoMA also lease space in the building.[198]
Apple ParkCupertino, California2014Completed2017More than $3 billion USDApple Inc.'s flagship headquarters.
Battery Park CityManhattan1970sCompletedMore than $1.4 billion USDA mainly residential 92-acre (37 ha) planned community at the southwestern tip of the island of Manhattan, more than 1/3 of which is parkland.[199]
Hunters Point Naval Shipyard and Candlestick Park RedevelopmentBayview–Hunters Point, San FranciscoIn progressAfter 2028 (proj.)$8 billion USD
Blue Oval CityStanton, TennesseePlanned$5.6 billion USDLarge-scale Ford electric vehicle complex that will include a vehicle assembly plant, a battery plant, supplier facilities, and battery recycling operations.[200]
BlueOval SK Battery ParkGlendale, KentuckyIn progress2025 (proj.)$5.8 billion USDLarge-scale battery plant that includes two plants that will produce batteries for Ford and Lincoln electric vehicles.[200]
Brickell City CentreBrickell district, Downtown Miami2012In progress$1.05 billion USDA shopping and mixed-use project that will eventually include One Brickell Centre.
Brickell KeyMiamiCompletedMore than $2 billion USDA manmade island on reclaimed land.[201]
CityCenterLas Vegas Strip2006Completed2009$11 billion USDThe largest privately-financed development in the United States.
Comcast Technology CenterPhiladelphia2014Completed2017$1.5 billion USDNinth-tallest building in the Western Hemisphere.
Cornell Tech campusRoosevelt Island, Manhattan2014In progress2037 (proj.)$2 billion USDA graduate campus and research center for Cornell University. The first phase opened for use in 2017.
Encore Boston HarborEverett, Massachusetts2016Completed2019$2.5 billion USDA casino resort property that is the largest single private development in state history.
Generation ParkHouston2014In progressMore than $10 billion USDA 4,200 acre, privately-owned and master-planned commercial development.[202]
Gigafactory 1Reno2014Completed2017$5 billion USDA lithium-ion battery plant owned and operated by Tesla, Inc.
HollywoodlandMiddletown, Ohio
-
Canceled
-
$1.3 billion USDA massive mixed-use development expected to include a destination entertainment district and theme park. The project was cancelled in 2022.[203]
Hudson Yards Redevelopment ProjectWest Side Yard, Manhattan2012In progress2027 (proj.)$20 billion USDA mixed-use real estate development.
Lincoln Yards ProjectChicagoStalled$6 billion USDDevelopment of 55 acres of a defunct steel mill park.
Miami WorldcenterMiamiIn progress$4 billion USDA large mixed-use development over 25 acres of land. Two buildings, including the Paramount Miami Worldcenter, opened in 2019.
Mission Bay RedevelopmentSan FranciscoIn progress$1 billion USD
Pacific ParkBrooklynIn progress2025 (proj.)$8 billion USDA mixed-use commercial and residential development project that includes Barclays Center, which opened in 2012.
ParkmercedSan FranciscoIn progress2035 (proj.)$1.35 billion USD
Shell Pennsylvania Petrochemicals ComplexPotter Township2017$6 billion USDAn ethylene cracker plant owned by Shell Oil Company. Operations began in 2022.
Port CovingtonBaltimore2019In progress2040 (proj.$5.5 billion USD
Riverside SouthManhattan1997Completed2020$3 billion USDAn urban development project.
San Francisco Transbay developmentSan Francisco2005In progress2030 (proj.)$4.5 billion USDThis project will include a new Transbay Transit Center. The Salesforce Tower opened in 2018.
Sasol Ethane Cracker Complex ProjectLouisianaIn progress$11 billion USDA large-scale ethane cracker complex.
San Diego State University Mission ValleyMission ValleyIn progress2030s (proj.)$3.5 billion USDAn expansion of the SDSU's campus on the former site of San Diego Stadium. Snapdragon Stadium opened in 2022.
Treasure Island RedevelopmentSan Francisco2016In progress2028 (proj.)$6 billion USD
Tri-County Mall RedevelopmentSpringdale, OhioProposed$1.3 billion USDRedevelopment of a shopping mall into a multi-use space.
Vista Tower ProjectChicago2016Completed2020$1 billion USDIt is the tallest structure designed by a woman in the world.[204]
Washington State Convention Center ExpansionSeattle2018Completed2023$1.6 billion USD
Wilshire Grand CenterLos Angeles2014Completed2017$1.2 billion USDAt 1,100 feet (0.34 km), it is the tallest building west of the Mississippi River.
Rebuilding of the World Trade CenterManhattan2006On hold$32 billion USDThis was part of the recovery from the September 11 attacks. One, Three, Four, and Seven World Trade Center Towers have been completed as of 2018.[205]

Oceania

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
AustraliaBarangaroo RedevelopmentSydney2012In progress2023 (proj.)$6 billion
Queen's Wharf, BrisbaneBrisbane2018In progress2024 (proj.)$3 billionIntegrated resort development on the north bank of the Brisbane River.[206]
Victorian Desalination PlantBass Coast Shire2009Completed2012$4 billionBuilt to provide more drinking water to Melbourne.
New ZealandChristchurch RebuildChristchurch2020 (proj.)$17 billionRecovery from earthquakes in 2010–2011.

South America

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
BrazilBrasíliaBrasília1956Completed1960$21.9 billionAt the close of the 20th century, Brasília was the largest city in the world that had not existed at the beginning of the century.[207][208]
ColombiaBogotá Urban RenewalBogotáIn progress$50 billion USDIncludes building over 60 skyscrapers, 500 highrises, 3 new CBDs, a subway system, and a smart city near Usaquén

Ports, waterways, canals, and locks for ships carrying passengers and cargo are built as megaprojects.

Africa

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
EgyptNew Suez CanalIsmailia and Suez Governates2014Completed2015$8.4 billion USD
Suez CanalIsmailia and Suez Governates1859Completed1869$100 million (1869)
EthiopiaGrand Ethiopian Renaissance DamBenishangul-Gumuz Region2011Completed2022$5 billion USDThe dam is located on the Blue Nile River.
KenyaLamu Port and Lamu-Southern Sudan-Ethiopia Transport CorridorLamuStalledKSh $2 trillion
NigeriaBadagry Deep Sea PortBadagryApproved$2.3 billion USDThe project, which has been stalled for years, was most recently approved in October 2022.[209][210][211]
Lekki PortLekki2015Completed2022$1.65 billion USDPhase one became operational in 2018.[212][213]
TanzaniaBagamoyo PortBagamoyo2023 (proj.)Stalled$10 billion USD

Asia

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
IndiaSagar Mala projectNationwideIn progress8.5 trillionThis project includes creating six mega-ports, modernising existing ports, developing the 14 Coastal Economic Zones and Units, and enhancing port connectivity.[214]
JapanKamaishi Tsunami Protection BreakwaterKamaishi, Iwatec. 1989Completed2009$1.5 billion USDAfter three decades of development, the tsunami barrier was proven ineffective against the 2011 Tōhoku earthquake and tsunami.
PakistanDasu DamDasu2019In progress2015 (proj.)$4.278 billion USDThe 242 m (794 ft) tall dam will support a 4,320 MW hydropower station, to be built in two 2,160 MW stages.[215]
Diamer-Bhasha DamIndus River2020In progress2028 (proj.)$14 billion USD[216][217]
Mohmand DamMohmand District2019In progress2028 (proj.)$2.1 billion USDAn under-construction, multi-purpose, concrete-faced, rock-filled dam, which will generate 740 MW of hydroelectricity, irrigate 15,100 acres of land and control floods downstream.[218]
ChinaSouth–North Water Transfer ProjectNorth and south China2003In progress$79 billion USD[219]
Three Gorges DamYiling District1994Completed2003$59 billion USD
Sri LankaColombo Harbour Expansion ProjectColombo2008Completed2013$1.2 billion

Middle East

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
IsraelNational Water Carrier of IsraelNationwide1953Completed1964$1.08 billion USD
PalestineNational Water Carrier of PalestineCompleted1956About $1.1 billion USD

Central America

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
NicaraguaNicaragua CanalPunta Brito-Bluefields
-
Abandoned
-
$100 billion USD (est.)This shipping route was meant to connect the Caribbean Sea with the Pacific Ocean.[220]
PanamaPanama CanalColón and Panamá Provinces1904Completed1914$360 million USD
Panama CanalColón and Panamá Provinces2007Completed2016B/.5.25 billion

Europe

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
DenmarkEnergy islands of DenmarkNorth Sea, Baltic SeaApproved2030 (proj.)kr210 billionTwo Energy Islands will become the world's first offshore energy hubs and are estimated to initially provide 5 gigawatts of power.
NetherlandsDelta WorksRhine–Meuse–Scheldt delta area1954Completed1997ƒ22,412 billionA series of construction projects in the southwest of the Netherlands to protect a large area of land around the Rhine-Meuse-Scheldt delta from the sea. The project was proposed after the North Sea Flood of 1953.
Zuiderzee WorksNorth Sea1927Completed1933A human-made system of dams and dikes, land reclamation and water drainage work, in total the largest hydraulic engineering project undertaken by the Netherlands during the 20th century.
NorwayStad Ship TunnelVestland2023In progress2026 (proj.)kr3 billionA planned canal and tunnel to bypass the dangerous coast of the Stad Peninsula. When built, it will be the first full-size ship tunnel in the world.

North America

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
CanadaRideau CanalOntario1826Completed1832£822,804 (1834)A 202 kilometres (126 mi) waterway built to provide a secure supply and communications route between Montreal and the British naval base in Kingston.
CubaNew Port of Mariel Development ProjectMarielCompleted$900 million[221]
MexicoDos Bocas RefineryTabascoPlanned
Port of Veracruz ExpansionVeracruzIn progress$5 billion USD
United StatesIntracoastal WaterwayBoston-Brownsville, TexasCompletedA 3,000-mile (4,800 km) inland waterway along the Atlantic and Gulf of Mexico coasts of the United States.

South America

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
BrazilPorto MaravilhaRio de Janeiro1870sCompleted1910R$69.965 billionThird-busiest port in Brazil.[222]

Hospitals

Europe

CountryProjectLocationStart yearStatusEnd yearCostNotesRef
IrelandNew children's hospitalDublin2016In progress2025 (proj.€2.2 billion[223][224][225]

See also

References

  1. Altshuler, Alan; Luberoff, David (30 April 2003). Mega-Projects: The Changing Politics of Urban Public Investment. Brookings Institution Press. ISBN 978-0-8157-0129-3. Archived from the original on 18 January 2017. Retrieved 9 February 2016.
  2. "Woman to build house out of 747". BBC News. 20 April 2006. Archived from the original on 27 August 2010. Retrieved 30 December 2010.
  3. Sutter, Joe; Spenser, Jay (1 May 2007). 747: Creating the World's First Jumbo Jet and Other Adventures from a Life in Aviation. Collins. ISBN 978-0-06-088242-6.
  4. Norris, G.; Thomas, G.; Wagner, M. & Forbes Smith, C. (2005). Boeing 787 Dreamliner – Flying Redefined. Aerospace Technical Publications International. ISBN 0-9752341-2-9.
  5. Irving, Clive. Wide Body: The Triumph of the 747. New York: W. Morrow, 1993. ISBN 0-688-09902-5, pp. 189–190.
  6. Garwood, Darrell. "Newest Air Force planes grounded". Archived 4 February 2016 at the Wayback Machine Times-News, 17 January 1970.
  7. "B-2 Bomber: Cost and Operational Issues Letter Report, 14 August 1997, GAO/NSIAD-97-181". Archived 8 April 2015 at the Wayback Machine United States General Accounting Office (GAO). Retrieved: 13 September 2009.
  8. "Boiling Over". archive.nytimes.com. Retrieved 22 November 2023.
  9. "Cost of Volcanic Eruptions". Volcano World. 15 April 2010. Retrieved 24 May 2022.
  10. Vidal, John (1 August 2019). "What should we do with radioactive nuclear waste?". The Guardian. ISSN 0261-3077. Archived from the original on 1 August 2019. Retrieved 2 August 2019.
  11. Dedaj, Paulina (3 July 2019). "Chernobyl's $1.7B nuclear confinement shelter revealed after taking 9 years to complete". Fox News. Archived from the original on 2 August 2019. Retrieved 2 August 2019.
  12. 1 2 3 "Oil Spills by the Numbers". Center for American Progress. 30 April 2010. Retrieved 24 May 2022.
  13. "Total unit faces stiff penalty over factory blast". Reuters. 25 June 2009. Retrieved 22 November 2023.
  14. Kweifio-Okai, Carla (25 December 2014). "Where did the Indian Ocean tsunami aid money go?". The Guardian. ISSN 0261-3077. Retrieved 22 November 2023.
  15. Schleifstein, Mark (14 January 2023). "How many people died in Hurricane Katrina? Toll reduced 17 years later". NOLA.com. Retrieved 22 November 2023.
  16. Bousso, Ron (16 January 2018). "BP Deepwater Horizon costs balloon to $65 billion". Reuters. Retrieved 22 November 2023.
  17. "2.4 trillion yen in Fukushima crisis compensation costs to be tacked onto power bills". Mainichi Daily News. 10 December 2016. Retrieved 22 November 2023.
  18. "Japan disaster set to become world's costliest - CBS News". www.cbsnews.com. 23 March 2011. Retrieved 22 November 2023.
  19. "Earthquake, Tsunami, Meltdown - The Triple Disaster's Impact on Japan, Impact on the World". Brookings. Retrieved 22 November 2023.
  20. "With 2,245 MW of Commissioned Solar Projects, World's Largest Solar Park is Now at Bhadl". 19 March 2020. Archived from the original on 20 March 2020. Retrieved 20 March 2020.
  21. "SECI tenders another 750MW at record-luring Bhadla Solar Park". PV Tech. 21 June 2017. Archived from the original on 1 December 2017. Retrieved 22 March 2018.
  22. "Country's Biggest Solar Park In Rajasthan, At The Heart Of India's Clean Energy Push". NDTV.com. Archived from the original on 12 February 2018. Retrieved 6 June 2017.
  23. Magno, Alex R. (1998). Kasaysayan: The Story of the Filipino People Vol. 9. Asia Publishing Co. pp. 204–205. ISBN 962-258-232-X.
  24. "Philippines GDP - Gross Domestic Product 1984". countryeconomy.com. Retrieved 24 May 2022.
  25. Parameswaran, Prashanth. "Southeast Asia's Nuclear Energy Future in the Spotlight With Philippines Debate Revival". Retrieved 27 September 2020.
  26. "Philippines looking at nuclear revival to meet energy needs". The Financial Express. 23 May 2018. Retrieved 21 June 2018.
  27. Domingo, Ronnel W. (20 November 2017). "Nuke plant rehab, revival opposed". Inquirer. Retrieved 21 June 2018.
  28. Agaton, Casper Boongaling (2019). A Real Options Approach to Renewable and Nuclear Energy Investments in the Philippines. Germany: Logos Verlag Berlin GmbH. p. 54. ISBN 978-3-8325-4938-1.
  29. "World's First Carbon Capture Power Plant Switches On". Climate Central. 5 October 2014. Archived from the original on 7 October 2014. Retrieved 7 October 2014.
  30. "Kemper County: constructing the world's first IGCC with CCS" (PDF). KBR. Archived from the original (PDF) on 11 October 2014. Retrieved 7 October 2014.
  31. "Benban, Africa's largest solar park, completed". European Bank for Reconstruction and Development. Archived from the original on 27 December 2019. Retrieved 29 November 2019.
  32. "Olkiluoto 3 at full power for first time". TVO. 30 September 2022. Archived from the original on 30 September 2022. Retrieved 1 November 2022.
  33. "Regular electricity production has started at Olkiluoto 3". TVO. 18 April 2023. Retrieved 16 April 2023.
  34. "Panamá inaugura su primera planta de gas natural". tvn-2.com. 17 August 2018. Retrieved 1 November 2018.
  35. "World's Largest Solar Park at Karnataka's Pavagada is Now Fully Operational". 27 December 2019. Archived from the original on 27 December 2019. Retrieved 27 December 2019.
  36. "Karnataka's Pavagada Solar Park to be Fully Operational by December 2019". 12 April 2019. Archived from the original on 12 April 2019. Retrieved 12 April 2019.
  37. "10 really cool Solar Power installations in (and above) the world". 29 January 2018. Archived from the original on 29 January 2018. Retrieved 30 January 2018.
  38. "宁夏在腾格里沙漠南缘建成全国最大沙漠光伏集成区 – 今日热点 – 中国储能网". www.escn.com.cn. Archived from the original on 3 May 2018. Retrieved 20 May 2017.
  39. Plumer, Brad (August 2017). "U.S. Nuclear Comeback Stalls as Two Reactors Are Abandoned". The New York Times. Archived from the original on 29 March 2020. Retrieved 1 November 2018.
  40. "Governments Spent at Least €93bn on COVID-19 Vaccines and Therapeutics During the Last 11 Months". www.businesswire.com. 11 January 2021. Retrieved 5 January 2023.
  41. "The Impact of Genomics on the U.S. Economy" (PDF). Batelle Technology Partnership Practice. June 2013. Archived (PDF) from the original on 12 October 2013. Retrieved 1 November 2014.
  42. "The price of the Manhattan Project". Restricted Data: The Nuclear Secrecy Blog. Archived from the original on 7 October 2014. Retrieved 31 October 2014.
  43. Adrian Cho (29 March 2022). "Trying to stay ahead of competition, U.S. pares down troubled $3 billion neutrino experiment". Science, American Association for the Advancement of Science.
  44. "FAIR: New German particle accelerator clears first hurdle". phys.org. Archived from the original on 15 November 2016. Retrieved 13 June 2012.
  45. Webb, Jonathan (21 May 2015). "LHC smashes energy record with test collisions". Archived from the original on 8 September 2015. Retrieved 28 August 2015.
  46. Lee Billings (12 February 2016). "The future of Gravitational wave Astronomy". Scientific American. Archived from the original on 13 February 2016. Retrieved 13 February 2016.
  47. Sarkauskas, Susan (22 April 2022). "Fermilab gets the go-ahead to start building new linear accelerator anticipated worldwide". Daily Herald. Retrieved 23 April 2022.
  48. "Cassini Solstice Mission-FAQs". Jet Propulsion Laboratory. Archived from the original on 1 February 2014. Retrieved 24 January 2014.
  49. "Gaia spacecraft set for launch on mission to map a billion stars". The Guardian. Archived from the original on 15 December 2013. Retrieved 15 December 2013.
  50. "Galileo navigational system enters testing stage". Deutsche Welle. Archived from the original on 15 October 2012. Retrieved 30 January 2018.
  51. Kathy Sawyer (17 December 1991). “Galileo Antenna Apparently Still Stuck”. Washington Post: A14; Kathy Sawyer (18 December 1991). “$1.4 Billion Galileo Mission Appears Crippled.” Washington Post: A3 Archived 14 February 2017 at the Wayback Machine in Mission to Jupiter. p.180.
  52. Galileo: Facts & Figures Archived 12 November 2013 at the Wayback Machine. NASA.gov. Retrieved 12 November 2012.
  53. "GPS History, Chronology, and Budgets". The Global Positioning System (PDF).
  54. "Herschel: Fact Sheet" (PDF). ESA.int. ESA Media Relations Office. 28 April 2010. Archived (PDF) from the original on 18 October 2012.
  55. "The Space Review: Costs of US piloted programs". thespacereview.com. Archived from the original on 12 July 2018. Retrieved 28 February 2015.
  56. "Technical Frequently Asked Questions (FAQ)". NASA-JWST. Archived from the original on 18 January 2014. Retrieved 24 January 2014.
  57. D. Leone. "MSL Readings Could Improve Safety for Human Mars Missions". Space News. Archived from the original on 2 February 2013. Retrieved 24 January 2014.
  58. George Musser (May 2011). "Cosmic-Ray Detector on Space Shuttle Set to Scan Cosmos for Dark Matter". Scientific American. Archived from the original on 2 February 2014. Retrieved 24 January 2014.
  59. "Moon Worth Apollo's $170 Billion?". Guardian Liberty Voice. 7 June 2014. Archived from the original on 31 October 2014. Retrieved 31 October 2014.
  60. "Space Shuttle Total Cost: More Than AIG Bailout, Less Than War". Fox News. 5 July 2011. Archived from the original on 24 January 2015. Retrieved 23 December 2014.
  61. Barrabi, Thomas (6 January 2020). "Las Vegas Raiders' Allegiant Stadium, by the numbers". Fox Business. Retrieved 12 January 2020.
  62. Mosley, Matt (15 September 2008). "Jones building a legacy with $1.3 billion Cowboys stadium". Retrieved 28 November 2008.
  63. "The NBA Comes to Brooklyn". Construction Digital. 1 August 2011. Archived from the original on 18 October 2011. Retrieved 4 August 2011.
  64. Baker, Geoff (10 May 2021). "Climate Pledge Arena cost to exceed $1 billion; Oak View Group announces tech partnership with Verizon". Seattle Times. Retrieved 15 May 2021.
  65. Brumfield, Loyd (21 September 2017). "Rangers Unveil First Renderings of New Globe Life Field, Set to Break Ground Next Week". The Dallas Morning News. Retrieved 21 September 2017.
  66. Rosenberg, Mike (19 April 2012). "49ers' Kick Off Move to Santa Clara With Far-From-Traditional Groundbreaking". San Jose Mercury News. Retrieved 6 May 2012.
  67. "Narendra Modi Stadium to have 50% capacity for five-match T20I series against England: GCA". www.timesnownews.com. 12 March 2021. Retrieved 18 August 2021.
  68. Brinson, Will (27 March 2018). "NFL Reportedly Raising Debt Limit on Rams Stadium after L.A. Project nears $5B Price Tag". Retrieved 27 March 2018.
  69. Garner-Putkis, Zak (5 June 2020). "Why Tottenham Hotspur's $1 Billion Stadium Will Be The Last Of Its Kind". Forbes. Retrieved 9 November 2020.
  70. "Wilfs pledge $19.5M more to stadium". ESPN. 26 March 2015. Retrieved 27 March 2015.
  71. "Cuomo, Islanders Make Belmont Official". New York Islanders. 20 December 2017. Archived from the original on 29 December 2017. Retrieved 20 December 2017.
  72. "Stadium Facts & Features". Wembley Stadium. Archived from the original on 20 November 2020. Retrieved 9 November 2020.
  73. Demause, Neil (January 2009). "Private/Public Cost Breakdowns for New Yankees/Mets Stadiums" (PDF). FieldOfSchemes.com. Retrieved 26 July 2020.
  74. Abraham Achirga (18 July 2018). "Light rail line in Nigeria's capital opens to passengers". Reuters. Archived from the original on 9 July 2019. Retrieved 9 July 2019.
  75. "Abuja Light Rail 84 per cent complete – Official". Premium Times Nigeria. 18 January 2017. Archived from the original on 2 February 2017. Retrieved 14 April 2017.
  76. "China Exim Bank to bankroll $1.79bn Abuja light rail". Sun News Online. Archived from the original on 26 March 2017. Retrieved 14 April 2017.
  77. "Lagos sign deal for construction of 38km-long fourth mainland bridge". The Nerve Africa. 25 May 2016. Archived from the original on 15 April 2017. Retrieved 14 April 2017.
  78. "Lagos-Calabar railway project: FG, CCECC sign $11.12bn MoU". Vanguard. 1 July 2016. Archived from the original on 15 April 2017. Retrieved 14 April 2017.
  79. Israel, Olumide (2 March 2014). "Railway: The return of the economic live wire!". Vanguard. Archived from the original on 2 July 2017. Retrieved 14 April 2017.
  80. "Lagos Rail Mass Transit". Lagos Metropolitan Area Transport Authority. 2015. Archived from the original on 1 December 2016. Retrieved 23 September 2015.
  81. "Lagos light rail to commence operation 2022 – Official". Premium Times. 12 August 2018. Archived from the original on 4 July 2019. Retrieved 9 July 2019.
  82. "Bharat Mala: PM Narendra Modi's planned 14,000 crore (US$1.8 billion) road from Gujarat to Mizoram", The Economic Times, New Delhi, 29 April 2015, archived from the original on 17 September 2016, retrieved 11 July 2020
  83. "::: Welcome to Delhi Mumbai Industrial Corridor :::". delhimumbaiindustrialcorridor.com. Archived from the original on 19 March 2016. Retrieved 5 July 2017.
  84. "THE CONSTITUTION (AMENDMENT)". indiacode.nic.in. Archived from the original on 21 August 2016. Retrieved 5 July 2017.
  85. "Make in India: Delhi-Mumbai Industrial Corridor to invite first anchor investors in August", The Economic Times, 16 February 2016, archived from the original on 27 March 2019, retrieved 11 July 2020
  86. "PM Modi inaugurates Hyderabad Metro Rail". The Times of India. 28 November 2017. Archived from the original on 28 November 2017. Retrieved 9 July 2019.
  87. "Metro rail line to Raidurg another two years away". The Hindu. 8 December 2017.
  88. Narendra Shah (17 April 2019). "Hyderabad Metro to Complete JBS-MGBS Metro Corridor by Nov 2019". Metro Rail News. Archived from the original on 17 April 2019. Retrieved 9 July 2019.
  89. "India's hyperloop plans were all talk—until now". Quartz India. 2 September 2016. Archived from the original on 22 June 2020. Retrieved 11 July 2020.
  90. technology, BENGALURU (7 December 2016). "India in talks to build Hyperloop; two Indian companies involved in the project". ET online. Archived from the original on 6 December 2016. Retrieved 7 December 2016.
  91. "DGWHyperloop – Overview" (PDF). 29 October 2016. Archived from the original (PDF) on 4 November 2016. Retrieved 14 January 2017.
  92. "JICA presents draft report on bullet train project to joint committee". timesofindia-economictimes. Archived from the original on 27 August 2016. Retrieved 11 July 2020.
  93. Aneesh Phadnis (8 June 2019). "L&T; set to construct Navi Mumbai airport, likely to finish by mid-2020". Business Standard. Archived from the original on 7 August 2019. Retrieved 9 July 2019.
  94. Pankaj Shah (17 December 2020). "Yogi Adityanath: Uttar Pradesh CM approves name, design and logo of Jewar airport | Noida News - Times of India". The Times of India. Retrieved 13 August 2021.
  95. "Noida: Construction work begins at international airport site in Jewar". Hindustan Times. 23 August 2021. Retrieved 18 September 2021.
  96. "Vision Ministry of Shipping, GOI, Government of India". SagarMala. 8 June 2018. Archived from the original on 17 October 2018. Retrieved 1 November 2018.
  97. "SagarMala – Concept & Objectives Ministry of Shipping, GOI, Government of India". sagarmala.gov.in. Archived from the original on 25 September 2018. Retrieved 1 November 2018.
  98. Media, Kompas Cyber (9 June 2021). "Ini Target Jadwal Uji Coba dan Operasional LRT Jabodebek". KOMPAS.com (in Indonesian). Retrieved 26 August 2021.
  99. "Economic corridor: Chinese official sets record straight". The Express Tribune. 2 March 2015. Archived from the original on 3 March 2015. Retrieved 8 August 2015.
  100. Flora, Ian Ocampo (6 February 2020). "P175-B mega bridge project to connect CL, Southern Tagalog". Sun Star Pampanga. Archived from the original on 28 June 2020. Retrieved 25 June 2020.
  101. "About Us – MRT3 Stations". Metro Rail Transit. Archived from the original on 22 January 2013. Retrieved 8 June 2014.
  102. "Major infrastructure projects lined up". BusinessWorld. Archived from the original on 23 September 2015. Retrieved 6 July 2015.
  103. Esguerra, Darryl John. "Construction of Makati City subway system to start in December". Archived from the original on 19 September 2018. Retrieved 19 September 2018.
  104. "Malaysian firm waits NEDA's nod for P60-B MRT-9 project". ptvnews.ph. Archived from the original on 10 July 2018. Retrieved 10 July 2018.
  105. Tycoons unsolicited PPP projects bolster "Build, Build, Build". Archived 22 December 2019 at the Wayback Machine Inquirer.net. Retrieved 22 December 2019.
  106. "Metro Manila to kick off construction of P350-B subway in January". The Inquirer. 27 December 2018. Archived from the original on 27 December 2018. Retrieved 28 December 2018.
  107. "Mindanao Railway project specs altered". BusinessWorld Online. 16 July 2019. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
  108. "San Miguel, DOTr sign deal to build new Bulacan airport". ABS-CBN News. 18 September 2019. Archived from the original on 20 September 2019. Retrieved 18 September 2019.
  109. Camus, Miguel R. "DOTr plans to integrate new railway lines". The Inquirer. Archived from the original on 16 February 2019. Retrieved 16 February 2019.
  110. "DOF seals loan from China for PNR South Long Haul Project". Manila Bulletin Business. Archived from the original on 14 January 2020. Retrieved 14 January 2020.
  111. "Singapore's first undersea road - Marina Coastal Expressway - set to open on Dec 29". Straitstimes. Retrieved 13 November 2013.
  112. "Incheon International Airport (ICA/RKSI)". airport-technology.com. AirportTechnology. 25 July 2019. Archived from the original on 25 May 2019. Retrieved 24 July 2019.
  113. Unknown (2019). "Incheon starts 4th-stage expansion project for new runway". The Korea Times. Archived from the original on 24 July 2019. Retrieved 24 July 2019.
  114. بازدید اعضای محترم کمیسیون عمران مجلس شورای انقلاب اسلامی از منطقه یک آزادراه تهران [Distinguished members of the Civil Commission of the Islamic Revolutionary Assembly visit District One of Tehran Freeway] (in Persian). Archived from the original on 13 December 2018.
  115. Unknown (2019). "Kuwait International Airport Passenger Terminal 2". GC Kuwait. Gulf Consults. Archived from the original on 24 July 2019. Retrieved 24 July 2019.
  116. "Qatar Expressway Program: One of the World's Largest Road and Infrastructure Projects" (PDF). KBR. Archived (PDF) from the original on 20 August 2018. Retrieved 20 August 2018.
  117. "Riyadh Metro project more than 90% completed". Zawya.
  118. "Al Maktoum International Airport". Zawya.com. Archived from the original on 6 March 2012. Retrieved 30 March 2013.
  119. "Línea 2 del Metro iniciará operaciones a partir del 15 de enero". La Estrella. 3 June 2018. Archived from the original on 30 July 2018. Retrieved 1 November 2018.
  120. "Lo Bueno Avanza Metro de Panamá a 4 años de gestión del Presidente Varela". El Metro de Panama. 12 July 2018. Archived from the original on 17 October 2018. Retrieved 1 November 2018.
  121. "Inforegio - Commission approves EU financing of the Pelješac bridge in Croatia". ec.europa.eu. Retrieved 11 August 2023.
  122. "European mega-project collaboration deal". tunneltalk.com. TunnelTalk. 11 October 2016. Archived from the original on 9 August 2017. Retrieved 9 August 2017.
  123. Herr, Roland (29 June 2016). "Megaprojects in Europe – Crossing Borders, Connecting Markets". tunnelingonline.com. Tunnel Business News. Archived from the original on 9 August 2017. Retrieved 9 August 2017.
  124. "Tendering". Attiko Metro. Archived from the original on 20 August 2018. Retrieved 20 August 2018.
  125. "Funding". Attiko Metro. Archived from the original on 19 August 2018. Retrieved 18 August 2018.
  126. "Transit in Athens". Attiko Metro. Archived from the original on 19 June 2018. Retrieved 18 August 2018.
  127. Egnatia Odos. "The Construction of the Egnatia Motorway". www.egnatia.eu. Archived from the original on 19 August 2018. Retrieved 18 August 2018.
  128. "Egnatia Railway". ec.europa.eu. Archived from the original on 15 January 2019. Retrieved 25 February 2019.
  129. "Greece Infrastructure". Foreign Policy. Archived from the original on 25 February 2019. Retrieved 25 February 2019.
  130. Nea Odos. "Financing the Project". www.neaodos.gr. Archived from the original on 19 August 2018. Retrieved 18 August 2018.
  131. "Χρηματοδότηση – ΑΤΤΙΚΟ ΜΕΤΡΟ Α.Ε." [Funding – Attiko Metro] (in Greek). Attiko Metro. 3 August 2019. Archived from the original on 3 August 2019. Retrieved 17 August 2019.
  132. "Στα 1,25δισ.ευρώ το κόστος της νέας σιδηροδρομικής γραμμής Θεσσαλονίκη-Καβάλα-Ξάνθη" (in Greek). Archived from the original on 24 June 2019. Retrieved 24 June 2019.
  133. "Αθήνα – Θεσσαλονίκη σε λιγότερο από 3,5 ώρες, Της Αλεξάνδρας Κασσίμη". www.kathimerini.gr. 29 January 2019. Archived from the original on 30 January 2019. Retrieved 31 January 2019.
  134. ErgOSE. "TITHOREA – DOMOKOS". www.ergpse.gr. Archived from the original on 5 July 2018. Retrieved 18 August 2018.
  135. "RESOLUTION NO 173/2017 OF THE COUNCIL OF MINISTERS of 7 November 2017 on the adoption of the Investment Preparation and Implementation Concept: Solidarity Airport – Central Transport Hub for the Republic of Poland" (PDF). Archived (PDF) from the original on 8 July 2019. Retrieved 8 July 2019.
  136. Navigable Danube-Thessaloniki river link a project of 'huge significance', Tsipras and Vucic agree
  137. "Drugi tir po novem investicijskem programu vreden manj kot milijardo evrov". RTVSLO.si (in Slovenian). Retrieved 17 July 2021.
  138. "Za razvoj Slovenije | Drugi tir". www.drugitir.si. Retrieved 17 July 2021.
  139. Walker, Peter (26 November 2021). "Boris Johnson's plan for Irish Sea bridge rejected over £335bn cost". BBC. Retrieved 30 November 2021.
  140. Topham, Gwyn; correspondent, Gwyn Topham Transport (24 April 2023). "Elizabeth line to be fully running from 21 May in 'last milestone' for Crossrail". The Guardian. ISSN 0261-3077. Retrieved 17 June 2023.
  141. 1 2 3 "Top 100: Canada's Biggest Infrastructure Projects for 2017". top100projects.ca. TOP100 Projects. Archived from the original on 1 September 2017. Retrieved 31 August 2017.
  142. Kate Porter (18 June 2019). "RTG promises to hand over LRT to city in August". CBC News. Archived from the original on 26 June 2019. Retrieved 9 July 2019.
  143. Tomesco, Frédéric (20 May 2022). "Opening of REM's airport section delayed until at least 2025". Montreal Gazette. Retrieved 24 May 2022.
  144. "CREATE". www.nscorp.com. Archived from the original on 6 February 2018. Retrieved 5 February 2018.
  145. "Crescent Freight Corridor, United States of America". railway-technology.com. Archived from the original on 8 August 2017. Retrieved 8 August 2017.
  146. Schwartz, A. C. (September 2004). "FIXING O'HARE : PLAN FOR A NEW AIRFIELD WILL ELIMINATE DELAYS CAUSED BY INTERSECTING RUNWAYS - IF IT CAN GET PAST THE LOCAL OPPOSITION". ATW: Air Transport World. 41 (10). ISSN 0002-2543.
  147. "UPDATE 1-FAA commits $410 mln to finish Chicago O'Hare plan". Reuters. 6 April 2010. Retrieved 24 May 2022.
  148. "Estimated cost of constructing Ohio River Bridges reduced in updated financial report to Federal Highway Administration | Ohio Bridges". kyinbridges.com. Archived from the original on 29 July 2017. Retrieved 29 July 2017.
  149. "Initial Investment | Project Connect by Capital Metro". Default. Retrieved 19 January 2021.
  150. "Project Connect Program Sequence". CapMetro. Retrieved 19 January 2021.
  151. "Puget Sound Gateway Program". Washington State Department of Transportation. Retrieved 28 October 2022.
  152. "Sydney Central Station Airspace Redevelopment, NSW". Webb Australia. Archived from the original on 28 February 2014. Retrieved 24 February 2014.
  153. "Cross River Rail". Queensland Government. Archived from the original on 1 October 2017. Retrieved 29 September 2017.
  154. "OneSKY Project". Airservices. Archived from the original on 30 April 2018. Retrieved 30 April 2018.
  155. "Suburban Rail loop". Victorian Government. Archived from the original on 7 March 2019. Retrieved 5 March 2019.
  156. "Work on Sydney Harbour tunnels to start". 25 June 2017. Archived from the original on 25 June 2017. Retrieved 3 March 2019.
  157. O'Sullivan, Matt (7 February 2021). "Warning that Metro West risks costing $27b and opening late". The Sydney Morning Herald. Retrieved 29 September 2023.
  158. Abdel bary, Hossam (26 September 2015). "Eastown & Westown Egypt". slideshare.net. Solidere. Retrieved 2 November 2017.
  159. Unknown (2019). "GALALA CITY". sitesint.com. Sites International. Retrieved 24 July 2020.
  160. "Get To Know Abuja". Abuja City. Archived from the original on 23 September 2015. Retrieved 27 September 2015.
  161. "Asokoro Island: Abuja's new, exclusive destination for luxury living". Market Watch. 30 September 2014. Archived from the original on 14 May 2016. Retrieved 29 April 2016.
  162. "Asokoro Island". asokoroisland.com. Archived from the original on 9 August 2017. Retrieved 8 August 2017.
  163. "FG urges Nigerians in Diaspora to invest in Centenary City". Vanguard Newspapers. 26 July 2013. Archived from the original on 1 October 2013. Retrieved 8 October 2013.
  164. "Centenary City Abuja – What to Expect". Estate Intel. 18 August 2014. Archived from the original on 19 September 2014. Retrieved 22 February 2012.
  165. Njoku, Jude (16 September 2014). "FG, developer sign deal on Festac Phase 2". Vanguard. Retrieved 23 December 2015.
  166. "Nigeria: Development Plan Dismisses Threats to Lekki/Victoria Island's Real Estate Prospects". allafrica.com. 6 July 2015. Archived from the original on 22 December 2015. Retrieved 15 December 2015.
  167. Ricardo Reboredo (6 March 2019). "What a failed futuristic smart-city in Modderfontein tells us about African mega-cities". The Citizen. Zambia. Archived from the original on 16 May 2019. Retrieved 16 May 2019.
  168. "Shanghai Zendai Plans $7.8 Billion 'New York of Africa'". Bloomberg. 6 November 2013. Archived from the original on 6 March 2016. Retrieved 13 January 2016.
  169. "Work begins on South Africa's R84bn smart city". Brand South Africa. Archived from the original on 2 January 2016. Retrieved 13 January 2016.
  170. "World's Fastest Growing Cities are in Asia and Africa". Euromonitor. 2 March 2010. Archived from the original on 17 November 2015. Retrieved 26 October 2015.
  171. "10 infrastructure projects India can be proud of". ArabianIndustry.com. Archived from the original on 6 September 2014. Retrieved 6 September 2014.
  172. "Concept – GIFT Gujarat, Gujarat International Tec City, Gujarat International Finance Tec-City (GIFT)". giftgujarat.in.
  173. Appraisal of City Development Plan – Navi Mumbai Archived 15 September 2012 at the Wayback Machine. National Institute of Urban Affairs, 2008.
  174. Ragananthini, V. (18 July 2017). "Ekovest lines up RM16.5b worth of projects within KL River City". The Sun Daily. Archived from the original on 16 August 2017. Retrieved 15 August 2017.
  175. toot. "About Bahria Town Karachi – Bahria Town – Your Lifestyle Destination". bahriatown.com. Archived from the original on 11 May 2017. Retrieved 12 May 2017.
  176. "Sustainable Transportation in DHA City Karachi (DCK) – All You Need To Know!". DHA Today. 14 April 2014. Archived from the original on 9 September 2015. Retrieved 8 October 2015.
  177. "Pakistan Defence Officers Housing Authority, Karachi". DHA Karachi. Archived from the original on 7 September 2015. Retrieved 11 September 2015.
  178. "Capital Development Authority". Archived from the original on 12 May 2016.
  179. "Launch of LDA City delayed". Dawn. 9 January 2015. Archived from the original on 28 September 2015. Retrieved 27 September 2015.
  180. rasheed (22 September 2013). "$10 Billion Ravi River Front Project Launched". PKPolitics Discuss. Archived from the original on 25 June 2014. Retrieved 8 October 2015.
  181. "Home". Oman Tribune. Archived from the original on 18 August 2014. Retrieved 8 October 2015.
  182. Noor Aftab (20 January 2014). "New city project in Lahore suburbs on the anvil". The News International. Archived from the original on 5 August 2014. Retrieved 8 October 2015.
  183. "Colombo Port City: White Elephant? Affront to human rights? – Sri Lanka Campaign for Peace and Justice". Sri Lanka Campaign for Peace and Justice. 3 July 2015. Archived from the original on 26 September 2015. Retrieved 30 October 2015.
  184. "Iran Mall". Archived from the original on 31 May 2020. Retrieved 17 July 2020.
  185. "Jordan's $5 billion Abdali project: serious investment potential". Archived from the original on 23 September 2015. Retrieved 21 August 2015.
  186. "Shiny new downtown launched in Amman". Archived from the original on 29 May 2019. Retrieved 21 August 2015.
  187. Zareva, Teodora (1 November 2017). "Saudi Arabia Is Building a $500-Billion New Territory Based on Tech and Liberal Values". bigthink.com. bigthink. Archived from the original on 1 November 2017. Retrieved 2 November 2017.
  188. "Welcome to Neom, Saudi Arabia's city of the future". arabianbusiness.com. arabianBusiness. Archived from the original on 29 October 2017. Retrieved 2 November 2017.
  189. "kentsel_donusumun_maliyeti_ne_kadar_ konut insaat 1543567 html Haberleri ve kentsel_donusumun_maliyeti_ne_kadar_ konut insaat 1543567 html Geli艧meleri – Milliyet". milliyet.com.tr. Archived from the original on 29 October 2013. Retrieved 4 October 2013.
  190. "Kentsel Dönüşümün Maliyeti Ne Kadar?". eypyapi.com. Archived from the original on 8 February 2015. Retrieved 4 October 2013.
  191. "Kentsel dönüşüm için 400 proje". ekonomi.haberturk.com. 18 May 2012. Archived from the original on 5 October 2013. Retrieved 4 October 2013.
  192. ABDULKADİR CEMBEKLİ (7 September 2013). "Fikirtepe'de 40 milyar liralık kentsel dönüşüm başlıyor". ZAMAN. Archived from the original on 5 October 2013.
  193. "T.C. ÇEVRE ve ŞEHİRCİLİK BAKANLIĞI – Altyapı ve Kentsel Dönüşüm Hizmetleri Genel Müdürlüğü". csb.gov.tr. Archived from the original on 31 August 2012. Retrieved 4 October 2013.
  194. Lambert, Fred (19 October 2017). "Europe's Nortvolt battery gigafactory lands in Sweden". Electrek. Archived from the original on 13 December 2017. Retrieved 12 December 2017.
  195. www.fosterandpartners.com, Foster + Partners /. "New Slussen Masterplan | Foster + Partners". www.fosterandpartners.com. Archived from the original on 16 September 2019. Retrieved 25 November 2019.
  196. Nikel, David. "Kiruna: A Mining Town On The Move In Northern Sweden". Forbes. Retrieved 22 August 2023.
  197. "Pandemic accelerates $5B Oakridge Centre overhaul". Alaska Highway News. Retrieved 5 October 2021.
  198. "53 West 53rd". The Skyscraper Center. Archived from the original on 9 July 2019. Retrieved 9 July 2019.
  199. "City Living: Battery Park City". Archived from the original on 27 December 2014. Retrieved 1 March 2017.
  200. 1 2 Grzelewski, Jordyn; Beggin, Riley (27 September 2021). "Ford, partner to spend $11.4B on four new plants in Tennessee, Kentucky to support EVs". The Detroit News. Retrieved 27 September 2021.
  201. "Brickell Key on Claughton Island". 14 January 2013. Archived from the original on 2 March 2017. Retrieved 1 March 2017.
  202. "FMC Technologies breaks ground on corporate campus". HoustonChronicle.com. 6 May 2014. Retrieved 29 July 2020.
  203. "City officials: No plans to pursue proposed Middletown development, Hollywoodland". MSN.
  204. Rodkin, Dennis (17 October 2019). "What's That Building? A Towering New Addition To Chicago's Skyline". WBEZ Chicago. Retrieved 28 October 2021.
  205. "America Rebuilds: A Year at Ground Zero". PBS. Archived from the original on 5 August 2017. Retrieved 3 September 2017.
  206. "Queen's Wharf Brisbane". Destination Brisbane Consortium. Archived from the original on 25 February 2018. Retrieved 29 September 2017.
  207. "Brasília in the World". Archived from the original on 15 July 2014.
  208. Reporter, Contributing (13 January 2010). "Brasília, 50 Years as the Capital". Archived from the original on 24 February 2017.
  209. "- badagry-port.com". www.badagry-port.com. Archived from the original on 12 February 2018. Retrieved 14 April 2017.
  210. "Ambode Revs up $2.3bn Badagry Deep Sea Port Project". This Day Live. 8 October 2016. Archived from the original on 15 April 2017. Retrieved 14 April 2017.
  211. "Badagry seaport to generate $53bn over 45-year concession period – Sanwo-Olu". International Centre for Investigative Journalism. 16 October 2022. Retrieved 7 November 2023.
  212. Ebosele, Moses (20 May 2015). "Contractor pledges to deliver $1.65b Lekki deep seaport in 41 months". The Guardian. Archived from the original on 16 May 2017. Retrieved 10 August 2017.
  213. "Lekki Port". www.lekkiport.com. Archived from the original on 11 March 2019. Retrieved 17 July 2020.
  214. "Sagarmala Programme". pib.nic.in. Retrieved 25 April 2017.
  215. "Federal govt revises up cost of Dasu hydropower project". The Express Tribune. 6 May 2019. Retrieved 27 March 2022.
  216. "Opinion: Pakistan's Diamer Bhasha dam is neither green nor cheap". The Third Pole. 5 November 2021. Retrieved 27 March 2022.
  217. "KUNA : World Bank to finance USD 14 bln in Pakistani Dam - Economics - 21/08/2013". www.kuna.net.kw. Retrieved 27 March 2022.
  218. "Mohmand Dam to be constructed at a cost of Rs291bn". Profit by Pakistan Today. 14 July 2019. Retrieved 27 March 2022.
  219. Chang, Gordon G. (8 January 2014). "China's Water Crisis Made Worse by Policy Failures". World Affairs. Archived from the original on 23 July 2019. Retrieved 23 November 2018.{{cite news}}: CS1 maint: unfit URL (link)
  220. McDonald, Michael D (17 March 2016). "China Slowdown Not Holding Back Nicaragua Canal, Contractor Says". BloombergBusiness. Archived from the original on 22 March 2016. Retrieved 21 March 2016.
  221. Macguire, Eoghan (20 November 2013). "Cuba libre: Could port herald new economic age for communist island?". CNN. Archived from the original on 14 August 2017. Retrieved 14 August 2017.
  222. "Port of Rio de Janeiro". World Port Source. Retrieved 4 February 2022.
  223. Geschwindt, Sion (28 November 2022). "BIM for FM: Lessons from Ireland's 'digital hospital' megaproject".
  224. Donnelly, Laura. "Fears Children's Hospital Could Cost €2.2billion". www.98fm.com.
  225. "Fears target dates for construction and opening of new children's hospital will be missed". The Irish Times.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.